Notice ID: 5d267a2c9dfd413fb3850f596b513291Solicitation
NESP Navigation Systemic Mitigation Island 4 / Pool 4
Archived on July 15, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- June 2, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ST PAUL
- Place of performance
- Bay City, WI, 54723
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912ES23B0004
- Notice ID
- 5d267a2c9dfd413fb3850f596b513291
Description
Contractor will construct an island with granular fill from the channel maintenance dredging stockpile at Reads Landing and fine fill from access dredging and habitat dredging as needed. This island will increase the floodplain forest and fish overwintering areas. The Contractor will place riprap along the shore to protect the island. This rock will be obtained from Government approved, off-site sources. The Contractor will also locate, harvest, and plant willow cuttings; and establish turf as specified. This project is upstream of Lake Pepin, in Upper Pool 4 of the Mississippi River near Bay City, WI.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912ES23B0004- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationMar 7, 2023
NESP Navigation Systemic Mitigation Island 4 / Pool 4
- 3×SolicitationCurrentApr 27, 2023
NESP Navigation Systemic Mitigation Island 4 / Pool 4
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details..-------------------- AMENDMENT 0006 provides updates in accordance with the final set of ProjNet Bidder Inquiries and Government Responses. See all attachments for full details. | 78% | Solicitation | 12/09/2026 |
W912P926RA004 - NESP LD25 1200 ft Lock --------- The U.S. Army Corps of Engineers (USACE), St. Louis District, has an upcoming solicitation for constructing a new 1,200 ft Lock for Lock and Dam 25. Lock and Dam 25 is located approximately 61.5 river miles upstream from St. Louis and 241.5 miles above the mouth of the Ohio River. SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. | 78% | Pre-Solicitation | 07/14/2026 |
***Amendment 0006 The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged. ***Amendment 0005 The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets GI002 and CG203. All other terms and conditions remain unchanged. ***Amendment 0004 This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004. ***Amendment 0003 This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003. ***Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026: ***Amendment 0001 This amendment is issued to make administrative updates to the solicitation. ***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. | 75% | Solicitation | 04/24/2026 |
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. ---- Presolicitation Synopsis Update 0001 - update the POP information. | 75% | Pre-Solicitation | 04/24/2026 |
DRAFT SOLICITATION FOR PUBLIC FEEDBACK -------- Feedback shall be provided via email to NESPLock25Project@usace.army.mil with the subject line: DRAFT Solicitation Feedback - W912P926RA004 - NESP LD25 1200 ft Lock --------- The U.S. Army Corps of Engineers (USACE), St. Louis District, has an upcoming solicitation for constructing a new 1,200 ft Lock for Lock and Dam 25. Lock and Dam 25 is located approximately 61.5 river miles upstream from St. Louis and 241.5 miles above the mouth of the Ohio River. USACE is requesting review and feedback from interested vendors by the response date and time of this notice to be considered prior to the actual solicitation. (NOTE: The instruction to request the Plans is within the Solicitation at the top of the List of Drawing Sheets on page 4.) | 75% | Special Notice | 05/01/2026 |
Additional Details
Solicitation Number
W912ES23B0004
Archive Date
Jul 15, 2023
Office Address
SAINT PAUL, MN, 55101-1323