Notice ID: 6096d90d9bca489f8ef9eb40d43a5510Solicitation

Vehicle Gate Replacement and Security Fence Improvements - Fountain City, WI

Archived on September 28, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−05:00
Posted
September 11, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238990: All Other Specialty Trade Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ST PAUL
Place of performance
Fountain City, 54629
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912ES24Q0124
Notice ID
6096d90d9bca489f8ef9eb40d43a5510

Description

The U.S. Army Corps of Engineers - St. Paul District is seeking quotes to award one (1) firm-fixed price Construction contract under the authority of FAR Part 13 - Simplified Acquisition Procedures for a contractor to replace the vehicle front entrance gate at the USACE Fountain City Service Base and make improvements to the existing perimeter security fence. This solicitation is 100% set-aside for Small Business under North American Industry Classification System (NAICS) 238990 with an SBA size standard of $19,000,000. The Estimated Magnitude of Construction is between $25,000 and $100,000. All work shall take place at the USACE Fountain City Service Base - 431 North Shore Drive - Fountain City, WI 54629 - in Buffalo County, Wisconsin. The existing vehicle gate is appoximately 77" high x 432" wide. The existing pressure plate sensor is approx. 47 inches wide X 16 ft in length. The Contractor shall supply and install a new entrance gate and hardware, including gate operator controls which will interface with existing security keypade. Existing gate and equipment will be removed and disposed of offsite. Contractor will supply and install new pressure plate system and safety photo eye sensor. Contractor will make improvements to the security fencing including: Supplying and installing new man-door in perimeter fence Replacing aluminum ties on perimeter fence with steel ties Raising existing fence near rail signal to achieve minimum height of 7 ft fencing from gravel base Contractor will be required to furnish Payment and Performance Bonds. All work (except asphalt repair) shall be completed no later than January 3, 2025. Asphalt cleanup must be complete by 30 May 2025. AMENDMENT 0001 HAS BEEN POSTED - 9/6/2024 Amendment 0001 corrects erroneous information about the dimensions of the gate in the SOW, and adds information about the pressure sensor and security keypad. The amendment extends the solicitation close date. Please acknowledge receipt of the amendment when submitting offers.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912ES24Q0124
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentAug 23, 2024

    Vehicle Gate Replacement and Security Fence Improvements - Fountain City, WI

    Notice 6096d90d9bca489f8ef9eb40d43a5510 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912ES24Q0124

Archive Date

Sep 28, 2024

Office Address

SAINT PAUL, MN, 55101-1323