GovChime
Notice ID: 907029dd39364c4781776d17bcc3eef1Award NoticeAwardedArchived

Inland River Towboat

Awarded on March 11, 2026. Full description on SAM.gov.

Awarded tounder W912ES26PA044 (source: SAM.gov award notice)• $14.0M

Overview

Posted
March 11, 2026
Notice type
Award Notice
NAICS
336612: Boat Building
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST PAUL.W07V ENDIST ST PAUL
Place of performance
Bayou La Batre, Alabama, 36509
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov
Award date
Mar 11, 2026
Award amount (SAM.gov award notice)
$14.0M

Identifiers

Solicitation number
W912ES26PA044
Notice ID
907029dd39364c4781776d17bcc3eef1
Award number (PIID)
W912ES26PA044

Description

Contract was awarded on the basis of Best Value for a new construction vessel that was already in production, with acceptance in November 2026. Commercial off the shelf (COTS) design is being used with minor modifications to meet Government requirements (e.g. fuel, oil and potable water tank segregation; additional insulation and heaters added). Steiner Hull 1081 (USACE Name TBD) will be 100 ft long, 34 ft beam (width), draft of 8 ft 6 in, powered by 3 x 800 HP Tier III S6R2 Mitsubishi Diesel engines. Vessel with have berths for up to 8 crew and two 65 ton barge winches. Vessel will be used by the U.S. Army Corps of Engineers - St. Paul District - Maintenance & Repair Section to move barges, floating plants and other equipment used in the repair and mainenance of locks, dams, and other Government assets.  

Vessel is being built by Steiner Construction Company Inc., 9195 Little River Road; Bayou La Batre, AL 36509

Full description on SAM.gov

Award Overview

Award Number

W912ES26PA044

Award Amount (SAM.gov award notice)

$14.0M

Award Date

Mar 11, 2026

Awardee

Awardee UEI

VFTMUZKK1NU7

Awardee CAGE Code

17TE4

Awardee Address

Pensacola, FL 32507, UNITED STATES

Original Solicitation

Notice ID: 907029dd39364c4781776d17bcc3eef1

Posted Date: Mar 11, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 3
    Version 3SolicitationArchived

    Inland River Towboat

    Notice f53e286b3c614f5db3bcddd27f131132 on SAM.gov

  2. 6
    Version 6Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Inland River Towboat

    Notice 907029dd39364c4781776d17bcc3eef1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to provide wheel repairs on the M/V LAWSON four-bladed, Kaplan 19A propellers. The contractor will providepropeller reconditioning. Reconditioning shall include the removal of all nicks/edge damage, weld repairs, straightening, and re-pitching/re-balancing to original specifications.
-Market Research08/28/2026
Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to Dry Dock and perform Repairs to S/V DAMRELL, between Pensacola, FL and Gulfport, MS. The scope of the work consists of dry-docking the S/V DAMRELL and performing the repairs and other work described by these Technical Specifications. The contractor will furnish all labor, materials, fittings, tools, power, lubricants, fuel, water, etc., necessary to accomplish the work within the time period specified. The contractor will also furnish the necessary facilities for and bear the expense of any movement of the plant while it is in his possession. The contractor shall provide and bear the expense of shore power to the vessel while it is at the facility of the contractor. The contractor shall bear the expense of any electricity needed to complete this work. Should the removal or shifting of any parts of the plant or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at his expense. The contractor shall bear the cost of storing any fuel, oil, or other materials. The contractor should propose an all-inclusive cost for each CLIN to perform the entire job, unless specifically stated otherwise. Should any portion of the structure, fixtures or equipment of the plant require alteration in order to carry out the work, the contractor shall notify the government to discuss options for how to address within the cost constraints of the work item. The contractor will provide a minimum full one year warranty on all parts, products and workmanship. Should any portion of the structure, fixtures or equipment of the plant require alteration to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at his expense. The S/V DAMRELL is an aluminum, hydrofoil assisted, catamaran survey vessel. Her general dimensions are as follows: length of 69 feet, beam of 24 feet-5 inches, depth molded of 9 feet-5 and one-quarter inches, maximum displacement of 110,000 lbs. Due to the sensitive nature of the hull mounted transducers and special arrangement of the hull with the hydrofoils, the vessel is to be hauled out of the water with a marine travel lift only.
-Solicitation04/24/2026
Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to Dry Dock and perform Repairs to S/V DAMRELL, between Pensacola, FL and Gulfport, MS. The scope of the work consists of dry-docking the S/V DAMRELL and performing the repairs and other work described by these Technical Specifications. The contractor will furnish all labor, materials, fittings, tools, power, lubricants, fuel, water, etc., necessary to accomplish the work within the time period specified. The contractor will also furnish the necessary facilities for and bear the expense of any movement of the plant while it is in his possession. The contractor shall provide and bear the expense of shore power to the vessel while it is at the facility of the contractor. The contractor shall bear the expense of any electricity needed to complete this work. Should the removal or shifting of any parts of the plant or its fittings, stores, fuel, water, etc., be necessary for the carrying out of the repairs specified, the same shall be done by the contractor and all such removals shall be subsequently replaced and any damage or loss resulting there from shall be made good by the contractor at his expense. The contractor shall bear the cost of storing any fuel, oil, or other materials. The contractor should propose an all-inclusive cost for each CLIN to perform the entire job, unless specifically stated otherwise. Should any portion of the structure, fixtures or equipment of the plant require alteration in order to carry out the work, the contractor shall notify the government to discuss options for how to address within the cost constraints of the work item. The contractor will provide a minimum full one year warranty on all parts, products and workmanship. Should any portion of the structure, fixtures or equipment of the plant require alteration to carry out the work, even though not specifically mentioned herein, the contractor shall make such alterations at his expense. The S/V DAMRELL is an aluminum, hydrofoil assisted, catamaran survey vessel. Her general dimensions are as follows: length of 69 feet, beam of 24 feet-5 inches, depth molded of 9 feet-5 and one-quarter inches, maximum displacement of 110,000 lbs. Due to the sensitive nature of the hull mounted transducers and special arrangement of the hull with the hydrofoils, the vessel is to be hauled out of the water with a marine travel lift only.
-Market Research02/19/2026
USACE Savannah District requires the supply and installation of one new gasoline powered marine generator.
-AwardedOpen
Amendment 0001 adjusted for T-Top Package, color schematic change and upgraded Lithium Batteries/ Charger unit
-Combined Synopsis09/17/2026

Additional Details

Solicitation Number

W912ES26PA044

Archive Date

Mar 26, 2026

Office Address

SAINT PAUL, MN, 55101-1323