Notice ID: 945ee521b97a425e9ca02e363fe68278Award NoticeAwardedArchived
Cross Lake Waterline Repair
Awarded on April 24, 2026. Full description on SAM.gov.
Awarded tounder W912ES26PA071 (source: SAM.gov award notice)• $71.5K
Overview
- Posted
- April 27, 2026
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST PAUL.W07V ENDIST ST PAUL
- Place of performance
- 56442
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
- Award date
- Apr 24, 2026
- Award amount (SAM.gov award notice)
- $71.5K
Identifiers
- Solicitation number
- W912ES26PA071
- Notice ID
- 945ee521b97a425e9ca02e363fe68278
- Award number (PIID)
- W912ES26PA071
Description
Replace a waterline and manhole at Cross Lake Recreation Area.
Award Overview
Award Number
W912ES26PA071
Award Amount (SAM.gov award notice)
$71.5K
Award Date
Apr 24, 2026
Awardee
Awardee UEI
RE9HQNBKPY57
Awardee CAGE Code
15FR3
Awardee Address
3624 CORMAC WAY, SACRAMENTO, CA 95835, UNITED STATES
Original Solicitation
Notice ID: 945ee521b97a425e9ca02e363fe68278
Posted Date: Apr 27, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W912ES26PA071piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 3Version 3Award NoticeArchivedCurrent
Cross Lake Waterline Repair
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Lawn Mower with Trade In, see solicitation for details. | - | Awarded | Open |
This is a Sources Sought Notice for market research purposes only and does NOT constitute a Request for Proposal (RFP), Request for Quote (RFQ), or Invitation for Bid (IFB). No formal solicitation exists at this time. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government will not reimburse respondents for any costs incurred in developing or submitting information in response to this notice. The Minnesota Army National Guard is conducting market research to identify qualified manufacturers or authorized distributors capable of providing a 0-16,000 ft-lbs Digital Torque Multiplier that is also authorized for use on CH-47 Chinook helicopters. The results of this market research will determine the set-aside status. The capabilities of the requested items shall meet or exceed the capabilities of NSN 5120-01-708-0605, ATP16000, listed below: Rated for upto 16,000 ft-lbs of manual/non-powered torque at a maximum input of no more than 97 ft-lbs Authorized for use on a CH-47 Chinook Helicopter Main Rotor Breakaway Calibration Certificate traceable to N.I.S.T. The weight of the item not to exceed 85 pounds Include a No-FOD (foreign object damage) 1/2 inch ratcheting input wrench Include a durable, air-tight storage case with custom fitting foam Include a digital controller and charger Interest vendors capable of supplying an item that meet or exceed above salient characteristics are invited to submit a brief capability package containing: Comany Profile Business Size and Socioeconomic Status State whether you are the Original Equipment Manufacturer or an authorized reseller/distributor Technical documentation Current availability on any existing Government contract vehicles Submit responses to the POC's email no later than the date listed in the sources sought. Please include the Subject Line: "Sources Sought Response - Torque Multiplier - [Your Company Name]" | - | Market Research | 11/20/2026 |
The U.S. Army Corps of Engineers - St. Paul District requires a shipyard with a drydock to inspect, refurbish and modify Barge 774, a 110 ft x 26 ft x 5 ft steel equipment barge. Contractor will pick up the barge at Lock and Dam 7 (UMRM 702.5), La Crescent, MN after November 30, transport it to their facility, raise the vessel on a drydock, pressure blast the hull and thoroughly inspect. Work includes (but is not limited to) complete removal and replacement of timber/wood decking, spud repositioning and fabrication/installation of new spud wells, moving existing winches to new positions and replacing wire rope, re-routing three-phase 480-volt power to winches, painting the hull and extending/replacing the 30 ft spuds to 40 ft spuds. Contractor will prepare estimates for any out of scope repairs required to return the barge to full operational condition. All work shall be completed and the barge returned to Lock and Dam 7 no later than 1 April 2027. This solicitation is 100 percent set-aside for small business under NAICS 336611, with an SBA size standard of 1,300 employees. Offerors are requested to submit their quotes through the PIEE module. Offerors must be fully registered in the System for Award Management (SAM.gov) in order to receive a Federal Government contract. | - | Solicitation | 11/12/2026 |
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. | - | Solicitation | 11/18/2026 |
Phase I Environmental Site Assessment at Lower Grey Cloud Islands | - | Solicitation | 11/11/2026 |
Additional Details
Solicitation Number
W912ES26PA071
Archive Date
Apr 30, 2026
Office Address
SAINT PAUL, MN, 55101-1323