GovChime
Notice ID: f0e0730ccc6142b2bfce9f211e22d733Award NoticeAwardedArchived

AWARD NOTICE: Weekly QA Surveys at Reach SE-5 in Clay County, MN

Awarded on August 25, 2026. Full description on SAM.gov.

Awarded tounder W912ES26PA117 (source: SAM.gov award notice)• $10.8K

Overview

Posted
August 25, 2026
Notice type
Award Notice
Set-aside
Small Business Set Aside - Total
NAICS
541370: Surveying and Mapping (except Geophysical) Services
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST PAUL.W07V ENDIST ST PAUL
Place of performance
Moorhead, Minnesota, 56560
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Aug 25, 2026
Award amount (SAM.gov award notice)
$10.8K

Identifiers

Solicitation number
W912ES26PA117
Notice ID
f0e0730ccc6142b2bfce9f211e22d733
Award number (PIID)
W912ES26PA117

Description

This is an AWARD NOTICE. This is NOT a request for quotes. No new offers will be considered. 

The requirement was informally solicited using FAR Part 12 procedures. Multiple offers were received. The award was made on the basis of the lowest fully responsive offer received to a competitive solicitation. 

The U.S. Army Corps of Engineers - St. Paul District sought a contractor to conduct weekly quality assurance surveys to capture as-built elevations of soil cement on the Southern Embankment Reach 5 (SE-5) project. SE-5 is part of the larger Fargo-
Moorhead Metro Flood Diversion project and is located along 180th Ave South from Hwy 75 to just east of Wolverton Creek, in Clay County, MN. Surveys will be performed weekly (normally on Friday) beginning August 28 and continuing for ten weeks. 

Full description on SAM.gov

Award Overview

Award Number

W912ES26PA117

Award Amount (SAM.gov award notice)

$10.8K

Award Date

Aug 25, 2026

Awardee

Awardee UEI

N9LWJXV8A7J5

Awardee CAGE Code

0WA83

Awardee Address

Grand Forks, ND 58203, UNITED STATES

Original Solicitation

Notice ID: f0e0730ccc6142b2bfce9f211e22d733

Posted Date: Aug 25, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    AWARD NOTICE: Weekly QA Surveys at Reach SE-5 in Clay County, MN

    Notice f0e0730ccc6142b2bfce9f211e22d733 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.
-Solicitation11/18/2026
This is a PRE-SOLICITATION NOTICE. It is NOT a request for quotes (RFQ), invitation for bids (IFB), or request for proposals (RFP). This notice is provided for information and planning purposes only. It does not obligate the Government to any contractual action, including issuing a solicitation or awarding a contract. This is a statement that the Government intends to issue a Request for Quotes (RFQ) solicitation in the near future. The U.S. Army Corps of Engineers - St. Paul District will issue a Request for Quotes (RFQ) solicitation for a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation will be 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion.
-Pre-SolicitationOpen
Please see Attached Solicitation for Performance Work Statement.
-AwardedOpen
Please see Attached Solicitation for Performance Work Statement.
-Solicitation01/27/2026
W912HY26QA007 AMENDMENT 0001 - The purpose of this amendment is to respond to the inquiries. ***** All inquiries must be submitted no later than September 14, 2026, at 10:00 AM *****The objective of this contract is to replace Five (5) Position and Orientation System for Marine Vessels (POS MV) WaveMaster, Central Processing Units (CPUs) and antennas, Provide Firmware (F/W) and Hardware (H/W) Maintenance Coverage for Five (5) years (2026-2031) for the US Army Corps of Engineers Southwest Galveston District (USACE - SWG).
-Solicitation09/24/2026

Additional Details

Solicitation Number

W912ES26PA117

Archive Date

Sep 9, 2026

Office Address

SAINT PAUL, MN, 55101-1323