Inspection of a Radial Thrust Bearing Assembly
Archived on January 14, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EST
- Posted
- December 17, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 333914: Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ST PAUL.W07V ENDIST ST PAUL
- Place of performance
- Fountain City, Wisconsin, 54629
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912ES26QA0110001
- Notice ID
- 4f619ff4e4cf451aadecb9352ed8b130
Description
Statement of Work (SOW)
Radial Thrust Bearing Assembly Inspection and Repair
1. Scope
This Statement of Work (SOW) defines a two-part effort for the inspection and repair of the radial thrust bearing assembly installed on the VOSTA HPD 550-1350-280 dredge pump.
Phase 1 – Inspection, Report, and Repair Estimate
The contractor shall perform a full inspection of the radial thrust bearing assembly to document component condition, identify the cause of oil leakage, and produce a written inspection report with a detailed repair/replacement cost estimate. The phase 1 price will include return shipping to the Corps’ FCSB location.
Phase 2 – Repair and Replacement (Upon Government Approval)
Repair or replacement activities shall occur only after the Government issues written approval. The objective is to restore the assembly to full operational capability in accordance with OEM and industry standards.
Oil leakage has been observed at the seals; therefore, special attention shall be given to seal condition, integrity, and lubrication during both inspection and repair.
The Corps reserves the right to compete the repair among other vendors. Should the firm awarded the inspection contract not win the contract for repair work the unit will be, reassembled (if needed), safely packaged, and returned to the Corps’ FCSB location no later than 14 business days from notification.
2. Applicable Documents
The following documents shall guide this effort.
The contractor shall have permission for use and access to the following company provided documents:
- VOSTA HPD 550-1350-280 Operation and Maintenance Manual
- OEM technical drawings, specifications, and service bulletins
The work shall comply with the latest revisions of the following standards:
Standard
Description
ISO 13709 / API 610
Centrifugal Pumps for Petroleum, Petrochemical, and Natural Gas Industries (primary heavy-duty pump specification).
ISO 5199
Technical specifications for centrifugal pumps — Class II.
ISO 281
Rolling bearings — Dynamic load ratings and rating life.
ISO 1940-1
Mechanical vibration — Balance quality for rigid rotors.
ANSI/ABMA 9
Load Ratings and Fatigue Life for Ball Bearings.
ANSI/ABMA 11
Load Ratings and Fatigue Life for Roller Bearings.
ANSI/ABMA 7
Shaft and Housing Fits for Metric Radial Ball and Roller Bearings.
ANSI/EASA AR100
Recommended practice for repair of rotating electrical apparatus—Section 2.2 regarding bearings.
3. Requirements
3.1 Phase 1 – Inspection Requirements
The contractor shall:
- Perform a complete inspection of the radial thrust bearing assembly to identify wear, damage, or defects.
- Document the condition of all bearing components, including races, rollers, cages, seals, lubrication channels, and other related parts.
- Evaluate and document the source and extent of oil leakage, including photographs and corrective recommendations.
- Provide a written inspection report identifying components requiring replacement.
- Include photographic documentation of all damaged or worn components.
- Provide a detailed cost estimate for repairs or replacements, including part lead times.
3.2 Phase 2 – Replacement of Damaged Components (Upon Approval)
The contractor shall:
- Remove and replace only Government-approved components identified in Phase 1.
- Use OEM-certified replacement parts only.
- Install components using OEM procedures and correct torque specifications.
- Apply proper lubrication, seals, and fasteners in accordance with OEM guidance.
- Document all replaced components with photographs.
3.2.1 Government Approval Requirement
No removal, replacement, or repair work shall begin without written authorization from the Contracting Officer (CO). Any unauthorized repair work shall be performed at no cost to the Government.
3.3 Testing and Verification – to be priced as part of any repair submission.
After completion of approved repairs, the contractor shall:
- Perform alignment and functional checks.
- Verify rotational performance, load capacity, and lubrication flow per OEM standards.
- Provide documentation of all test results.
4. Materials and Workmanship
- All replacement parts shall be new, OEM-certified, and free of defects.
- All work shall comply with OEM instructions and accepted industry best practices.
- Personnel performing the work shall be qualified in heavy-duty pump bearing maintenance.
5. Deliverables
The contractor shall provide:
- Phase 1 inspection report, including findings, required replacements, and photos.
- Repair cost estimate.
6. Quality Assurance and Acceptance
Government representatives may witness inspection, repair, and testing activities.
Final acceptance shall be based on:
- Compliance with this SOW
7. Schedule
- The contractor shall submit a detailed schedule for inspection, reporting, approval, repair, and testing no later than 15 January 2026.
- All work, to include any authorized repair, shall be completed no later than 15 March 2026.
8. Shipping, Delivery, and Reporting
- The contractor is responsible for all shipping costs and logistics for transporting the unit to and from their facility.
- The unit is Approx. 8,000 pounds, is on cribbing and can be loaded and unloaded from/to the Army Corp. facility 0730-1500 Mon-Friday.
- Loading/unloading from Corp. facility shall be completed by the contractor.
- Pick up/Shipping Address:
431 North Shore Drive
PO Box 397
Fountain City, WI 54629 - All documentation shall be submitted to the Government Technical Point of Contact (TPOC).
- All replaced components shall be returned to the Government for inspection and final disposition.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Lifecycle
- 3Version 3SolicitationArchivedCurrent
Inspection of a Radial Thrust Bearing Assembly
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Proposed procurement for NSN 4320014238030 PLATE,THRUST,ROTARY PU: Line 0001 Qty 6 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0168 DAYS ADO Approved sources are 59180 S406GAE; 59180 SF10914 PIECE 7. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | 50% | Combined Synopsis | 11/16/2026 |
Location of Service: Belcourt, ND | 49% | Combined Synopsis | 11/12/2026 |
This is a Request for Quote (RFQ) for the following items.Item 001: Two (2) Aurora 411 Split Case Pumps, 5 x 6 x 11C (Pump End Only), with Stainless Components, rated for 1580 GPM at 310 ft TDH.Item 002: One (1) Aurora 411 Stainless Steel Rotating Assembly.Please provide a quote for the specified items. The pumps and rotating assembly must be NSF/ANSI 61 certified and approved for drinking water applications. | 49% | Combined Synopsis | 02/18/2026 |
49% | Awarded | Open | |
Proposed procurement for NSN 4320010296599 HOUSING ASSEMBLY: Line 0001 Qty 3 UI EA Deliver To: DLA DISTRIBUTION WARNER ROBINS By: 0168 DAYS ADO Approved sources are 59180 S8504JC; 59180 SF-10466PC012; 59180 SF-10469PC012. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | 46% | Combined Synopsis | 11/16/2026 |
Additional Details
Solicitation Number
W912ES26QA0110001
Archive Date
Jan 14, 2026
Office Address
SAINT PAUL, MN, 55101-1323