Notice ID: fce8b18a074964a2bb9a700374fc2cf6Award NoticeAwarded
Y--Site 81 Phase 2, Israel
Awarded on August 30, 2013. Full description on SAM.gov.
Awarded tounder W912GB-13-C-0017 (source: SAM.gov award notice)• $26.0M
Overview
- Posted
- September 5, 2013
- Notice type
- Award Notice
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD FEST NAU1 EUROPE
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Aug 30, 2013
- Award amount (SAM.gov award notice)
- $26.0M
Identifiers
- Solicitation number
- W912GB13R0017
- Notice ID
- fce8b18a074964a2bb9a700374fc2cf6
- Award number (PIID)
- W912GB-13-C-0017
Description
Award notice for the subject construction contract to finish a 6,000 sq. meter space in an existing building.
Award Overview
Award Number
W912GB-13-C-0017
Award Amount (SAM.gov award notice)
$26.0M
Award Date
Aug 30, 2013
Awardee
Awardee UEI
M6MWQQAT9BH8
Original Solicitation
Notice ID: fce8b18a074964a2bb9a700374fc2cf6
Posted Date: Sep 5, 2013
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $69.9KSigned Apr 21, 2026
- $16.8MSigned Jun 12, 2025
- $16.8MSigned Feb 21, 2025
- $16.8MSigned Dec 5, 2024
Contacts
Contracting Officer
Primary Contact
Michael Pearson, 0611-9744-2834 USACE District, Europe
Documents
No documents available.
Lifecycle
Solicitation:
W912GB13R0017- Awarded
This opportunity has been awarded.
- AwardedCurrentSep 5, 2013
Y--Site 81 Phase 2, Israel
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Sources Sought Notice/RFI for W912HP27RA010, Emergency Operations Center, Savannah River Site, SC. | 72% | Market Research | 11/20/2026 |
The U.S. Army Corps of Engineers is issuing this special notice to announce an upcoming competition for a design and construction solicitation for HQ USMC Phase 2 Relocatables using Progressive Design Build under 10 USC 2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. USACE intends to conduct an Industry Day on 27 October 2026 at 13:00PM CST to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design Build approach under an Other Transaction framework, ask questions, and provide input in advance of the solicitation release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers will be accepted and addressed following the release of the Program Solicitation. Please RSVP via email to Kelvaun Kennedy at Kelvaun.J.Kennedy@usace.army.mil and Johnna Sebben at Johnna.M.Sebben@usace.army.mil NLT 23 October 2026 13:00PM CST. The Government will distribute the Microsoft Teams meeting link via email to all registered participants closer to the scheduled Industry Day. Please ensure your RSVP is submitted by the required deadline to receive the meeting information. UPDATE 0001 is issued to publish the Industry Day briefing slides, formal responses to vendor questions, the official transcript, the event recording, and the list of attendees. To view the event recording, please download and save the attachment as a PDF, then open it directly in Adobe Acrobat to access the embedded link. | 72% | Special Notice | 11/03/2026 |
**Down Select Notification will occur on/about 09 November 2026. This special notice is to inform industry that those companies down selected to participate in Phase 2 will be invited to attend a site visit at the place of performance on 18 November 2026. SITE VISIT FOR DOWN-SELECTED OFFERORS - The Government intends to provide a site visit for the three (3) down-selected offerors during the Draft RFP review period. Attendance is not required, but strongly encouraged. The purpose of the site visit is to provide the down-selected offerors a common factual understanding of site conditions relevant to proposal development. Attendance requirements, access procedures, safety requirements, allowable attendees, and other administrative instructions shall be provided by the Government. Any questions arising from the site visit shall be submitted through the official Request for Information (RFI) process. Oral statements made during the site visit are not binding unless incorporated into the solicitation by formal written amendment. Site Visit Date, Time, and Location - A site visit at Letterkenny Army Depot will be held 18 November 2026, 8:00-3:30 p.m. EST, prior to the Proprietary Meetings (2 hours per site visit). Coordinates: Building 2 CAC and ID Center; 39.997017, -77.633519. Meeting Room: TBD; Date: TBD; Time: TBD; Proposed Site Visit Agenda: TBD; Site Visit Access and PPE - To enter the installation, a current and valid REAL ID will be required. Once you have been notified that you have been selected to move forward in the procurement process, email TONJA DREKE at tonja.j.dreke@usace.army.mil, and LAUREN ELAMENUEL at Lauren.N.Elamenuel@usace.army.mil, to confirm you plan to attend the site visit. All site visit attendees must be U.S. citizens. Attendees are also requested to bring their own eye protection, hard hat, and preferably steel-toed boots, though closed-toed shoes will be acceptable. Site Visit Attendee Limit - Offerors are requested to limit site visit attendance to six (6) people. Completed AMLD 4497 forms (as applicable) and a list of attendees must be provided to the Contracting Officer no later than 4 p.m. EST on 10 November 2026 prior to the site visit and shall include each individuals first and last name and associated firm, so that LEAD security can process visitor forms (attached). You will be provided with a secure link to send your completed AMLD 4497 forms. DO NOT email the completed AMLD 4497 form directly to USACE emails due to the required Personal Identifiable Information (PII). Those with non-expired badges will only need names and position titles; those with non-expired CACs should review forms and will need names and position titles. For all others, all forms are required and should be prepared and ready for submission in case you are one of the down selected firms. Submission will be due by 4 p.m. EST on 10 November 2026 allowing for the greatest ability for clearance to the site visit on 18 November 2026. Anyone submitting after that time and date cannot be guaranteed to be cleared due to the Veterans Day holiday. Transportation will be provided for those attending the site visit. We will board the Government provided transportation and travel to the project site, where the actual site visit will occur. No pictures are permitted during this site visit. Participants will be required to identify themselves by signing the attendance sheet. Participants will be required to keep their visitor day pass for the site visit and government issued identification with them for the full duration of the site visit. AGAIN, THIS IS ONLY FOR THOSE WHO RECEIVE NOTICE OF DOWN SELECT ON 09 November 2026. **The purpose of this amendment is to: A. Correct percentage in Factor 1 for General contractor. B. Make clarification on projects for DOR in Factor 1. C. Correct period of performance for clarification; 730 calendar days. D. Remove Item 4 Schedule from Team Integration, Factor 2. E. Add site visit date for reference or planning purposes; noting this will only be applicable to those who are down-selected to Phase 2, F. Provide updated attachments Experience in Relevant Projects and Past Performance Questionnaire. All other terms and conditions remain unchanged. This amendment has four (4) attachments. This is a two-phase Design-Build to Budget (DBtB) solicitation for the design and construction of the Component Rebuild Shop in accordance with procedures at RFO 36 and part 15. This solicitation is being issued on a Full and Open, Unrestricted basis. The Government will evaluate Phase I - Technical Proposals in response to this solicitation in accordance with the criteria described herein. The budget for this project will be $79,600,000.00 The North American Industry Classification System (NAICS) code for this acquisition is 236220 Commercial and Institutional Building Construction, size standard $45M. NOTICE: Procurement Integrated Enterprise Environment - Solicitation Module (PIEE-SOL) is the only authorized means of submitting a response to this Request for Proposal (RFP), any other form of submission WILL NOT BE ACCEPTED. PROJNET is the only authorized platform for submission of Request for Information (RFI) by interested parties. Any other form of submission, including email, WILL NOT BE ACCEPTED. ProjNet provides the official record of RFI submission and responses. Guidance for the use of both PIEE-SOL and PROJNET are located in Section 00 20 00 and 00 21 00 of the solicitation. This solicitation has five (5) attachments. | 69% | Special Notice | Open |
Solicitation and all attachments shall be downloaded from Procurement Integrated Enterprise Environment (PIEE) Solicitation Module https://piee.eb.mil/. Solicitation: W912HV26BA001 FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan Description: Provides whole house interior and exterior modernization, renovation and repair of thirty-four (34) housing units at Yokota Air Base (O-1 to O-5 three-bedroom military family housing townhouse units). Please read entire solicitation for details on pre-bid conference, site visit date and time, and RFI due date and time. 10 Feb 2026 - Amendment 0001 - The purpose of this amendment is to update paragraph (d) of FAR Provision 52.236-27 Site Visit (Construction)(Alternate I). 18 Feb 2026 - Amendment 0002 - The purpose of this amendment is to correct the number of days listed in Clause 52.211-10 to match the number of days listed on the SF1442 and revise Notes 2 and 4 in SECTION 00 10 00. 12 Mar 2026 - The Pre Bid Conference Attendance Sheet, Pre Bid Conference Slides, and Site Visit Attendance Sheet are attached. 23 Apr 2026 - Amendment 0003 - The purpose of this amendment is to make the following changes resulting from the Requests for Information. 29 Apr 2026 - Amendment 0004 - The purpose of this amendment is to add CMMC requirements. 16 Jun 2026 - Amendment 0005 - The purpose of this amendment is to move the bid due date to 17 Nov 2026. 21 Jul 2026 - Amendment 0006 - The purpose of this amendment is to make the following changes resulting from the Requests for Information. 17 November 2026 - The Abstract of Offers has been posted. | 66% | Solicitation | 11/17/2026 |
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction. | 66% | Solicitation | 11/20/2026 |
Additional Details
Solicitation Number
W912GB13R0017
Archive Date
Oct 5, 2013