Removal and Replacement of Existing Electrical Equipment , Including Airfield Lighting and Airfield Vault Equipment and Reconstruction of Runway 05-23 PAAF, NC.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- October 26, 2020
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST SAVANNAH
- Place of performance
- Pope Army Airfield, NC, 28308
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912HN20B3010
- Notice ID
- 363931e87a5f49b2a6e0e896be5f3adb
Description
Bid opening roster and abstract posted on 26 Oct 2020. Amendment 0006 posted 15 Oct 2020. Bid due date changed to 23 October 2020 at 1:00pm ET. W912HN20B30100006, 20B3010 Pkg1vol1.pdf and 20B3010 Pkg3.PDF are updated. Amendment 0005 posted 14 Oct 2020. Bid due date and time remains 20 Oct 2020 at 1:00pm ET. B.08 W912HN20B30100005, 20B3010 Pkg1vol1.pdf, 20B3010 Pkg1vol2.PDF and 20B3010 Pkg2.PDF, 20B3010 Pkg3.PDF are updated. Projnet Bidder Inquiries and Responses is added. Amendment 0004 posted 13 Oct 2020. Bid due date and time remains 20 Oct 2020 at 1:00pm ET. 20B3010 Pkg1vol1.pdf is and 20B3010 Pkg1vol2.PDF are updated. 20B3010 Pkg2.PDF, 20B3010 Pkg3.PDF and W912HN20B30100004 are added. W912HN-20-B-3010_AMD4_Pack1.pdf, W912HN-20-B-3010_AMD4_Pack2.pdf, W912HN-20-B-3010_AMD4_Pack3.pdf are added. Permanent Waiver Request for Installation of Light Emitting Diode (LED) Lighting is added. Amendment 0003 posted 7 Oct 2020. Bid due date changed to 20 Oct 2020 at 1:00pm ET. W912HN20B30100003 is added. Amendment 0002 posted 29 Sep 2020. Bid due date and time remains 15 Oct 2020 at 1:00pm ET. 20B3010 Pkg1vol1.pdf is updated. W912HN20B30100002, W912HN-20-B-3010_AMD2 PACK1.pdf, W912HN-20-B-3010_AMD2 PACK2.pdf and W912HN-20-B-3010_AMD2 PACK3.pdf are added. Amendment 0001 posted 11 Sep 2020. Bid due date and time remains 15 Oct 2020 at 1:00pm ET. 20B3010 Pkg1vol1.pdf and 20B3010 Pkg1vol2.pdf are updated. CMT Webex Meeting Ft. Bragg FA-80003-18-X.rev.02.pptx, SAS-Webex Meeting PAAF Repairs Slides.pptx, Site Visit Sign-In Sheet.pdf, TSC - Webex Meeting Ft. Bragg - Runway 05-23 Rehab.pptx, and Webex Chat Log FA-80003-18.txt are added. Solicitation posted on 28 Aug 2020. Four drawings files and four specifications files. Construction Entrance Gate PDF and Powerpoint file. Bid due date and time is 15 Oct 2020 at 1:00pm ET. If a file link is blacked out and unclickable, then it has been replaced by an updated file with the same file name. All blue file links that are clickable make up the entire solicitation package as amended.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912HN20B3010- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 10×SolicitationCurrentAug 28, 2020
Removal and Replacement of Existing Electrical Equipment , Including Airfield Lighting and Airfield Vault Equipment and Reconstruction of Runway 05-23 PAAF, NC.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912HN20B3010
Archive Date
Apr 30, 2021
Office Address
SAVANNAH, GA, 31401-3604