GovChime
Notice ID: bf114c00ad414e7b83a360f0b6160a87Solicitation

Noyes Cut Construction

Archived on May 11, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−04:00
Posted
May 2, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST SAVANNAH
Place of performance
Brunswick
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HN22B5004
Notice ID
bf114c00ad414e7b83a360f0b6160a87

Description

The work to be performed under this contract consists of closure of two man-made cuts in the salt marsh north of the Satilla River in Camden County, GA: Dynamite Cut (approximate location: 31.0101 N, 81.5466 W) and Old River Run (approximate location: 31.0066 N, 81.5328 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. For additional details, visit: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5004 *** See Attached Amendments 0001 and 0002 ***

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HN22B5004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMar 7, 2022

    Noyes Cut Construction

    Notice 0f90eba8735840fcb593fb176ed1fa9c on SAM.gov

  2. 4×
    SolicitationCurrentMar 23, 2022

    Noyes Cut Construction

    Notice bf114c00ad414e7b83a360f0b6160a87 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THIS SOLICITATION IS BEING ISSUED AS AN SMALL BUSINESS SET ASIDE PROCUREMENT FOR FY26 USACE GALVESTON DISTRICT GULF INTRACOASTALWATERWAY TEXAS PLACEMENT AREA NO. 118-A IMPROVEMENTS DIKE REPAIR AND SHORELINE EROSION PROTECTION
67%
Solicitation12/09/2025
FY26 Brunswick Inner Harbor Dredging Project
64%
AwardedOpen
Amendment 0001 updates the Bid Opening Link.
64%
Solicitation07/17/2026
THIS IS A PRE-SOLICITATION: This acquisition is being offered as a 100% Small Business Set Aside and will result in a Firm Fixed Price Contract Award. The Brunswick Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, and the duration is expected to be 120 days from notice to proceed. Up to 835 thousand cubic yards of maintenance material is expected to be removed from the inner harbor.The work is located in Brunswick Harbor Georgia deep draft navigation project. Brunswick Harbor is located in Glynn County, Georgia, 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall. The dredging in the Brunswick Inner Harbor primarily takes place in the East River (station 0+000 to 12+000) which includes the East River Turning Basin and the Transition Areas leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (station 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that generally requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 34+000 to 43+000) and Brunswick River (station 22+000 to 26+000) in the Brunswick Inner Harbor are other areas that may require dredging and are primarily dredged when shoaling become problematic to navigation but are constantly monitored monthly. Approximately 550,000 cubic yards of material is anticipated to be removed from the East River, approximately 85,000 cubic yards of material is anticipated to be removed from the South Brunswick River, approximately 50,000 cubic yards of material is anticipated to be removed from the Brunswick River and approximately 10,000 cubic yards of material is anticipated to be removed from the Lower Turtle River this dredging cycle.The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.
64%
Pre-Solicitation06/15/2026
FY25 Atlantic Intracoastal Waterway Maintenance Dredging - Select Site
64%
Solicitation01/14/2026

Additional Details

Solicitation Number

W912HN22B5004

Archive Date

May 11, 2022

Office Address

SAVANNAH, GA, 31401-3604