Notice ID: d073aad4aef64a24b177c68055074d2eSolicitation
FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging
Archived on October 31, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- September 9, 2022
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST SAVANNAH
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912HN22B5005
- Notice ID
- d073aad4aef64a24b177c68055074d2e
Description
NOTE: A revised abstract has been posted. The abstract has been uploaded. Amendment 0004 in PIEE (lableled Amendment 0003 on SF30) includes specifications and drawing changes. Amendment 0003 in PIEE (labled Amendment 0002 on SF30) changes the bid opening date from 23 August 2022 to 30 August 2022 and adds the number of days after Notice of Proceed (NTP) to subCLINS 0008AA and 0008AB. Amendment 0001 was administrative change in PIEE. Amendment 0002 in PIEE is the actual amendment to the solicitation. Amendment 0002 changes the description of CLIN 0008 to add DO NOT BID THIS CLIN. SEE SUBCLINS 0008AA AND 0008AB. Amendment 0001 changes the bid due date from 1:00 am to 1300 pm on 23 August 2022. The Atlantic Intracoastal Waterway (AIWW) Maintenance Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract has been traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be 273 days from Notice to Proceed. An estimated seven hundred fifty thousand (750,000) cubic yards of maintenance material is expected to be removed from the AIWW. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5005' to obtain more details.*
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912HN22B5005- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationJun 21, 2022
FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging
- 8×SolicitationCurrentJul 6, 2022
FY22 Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FY25 Atlantic Intracoastal Waterway Maintenance Dredging - Select Site | 98% | Solicitation | 01/14/2026 |
THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000. The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed. The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve (12) feet deep MLLW with widths from ninety (90) feet in land cuts and one hundred fifty (150) feet in natural waterways. Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet. Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway. Sediment dredged from Hell Gate may be pumped approximately four (4) miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar. Sediment dredged from Florida Passage may be pumped approximately nine (9) miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar. Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST). Any questions should be emailed to the Contract Specialist, Rohan Bryan at Rohan.A.Bryan@usace.army.mil or Contracting Officer, Preston Jones at Preston.E.Jones@usace.army.mil. | 94% | Market Research | 11/20/2026 |
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: Project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but not limited to environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT. | 88% | Solicitation | 05/13/2026 |
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: The project work consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. The excavated material will be placed in the beach placement area south of Bakers Haulover Inlet. Incidental work includes but not limited to turbidity monitoring, environmental species monitoring, beach fill quality control, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00.The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT. | 88% | Pre-Solicitation | 05/13/2026 |
The purpose of Amendment 0002 to Solicitation W912BU26BA011 is as follows: a.) Provide answers to the RFIs submitted. b.) Revise quantity of CLIN 0002 on Bid Schedule from 268,836 CY to 520,778 CY. c.) Update DFARS Clause 252.236-7001 Contracts, Drawings, and Specifications d.) Update FAR Provision 52.252-3, Alterations in Solicitation. | 85% | Solicitation | 08/31/2026 |
Additional Details
Solicitation Number
W912HN22B5005
Archive Date
Oct 31, 2022
Office Address