GovChime
Notice ID: f80795e7e3d94ae281c44f4386c0b022Solicitation

W912HN23B4001 - Renovate Willard Training Area, Fort Gordon, GA

Archived on August 22, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
September 6, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST SAVANNAH
Place of performance
Fort Gordon, GA
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HN23B4001
Notice ID
f80795e7e3d94ae281c44f4386c0b022

Description

--------------------------------------BID OPENING INFORMATION---------------------------------------------------- Bid opening will begin at 1200PM (EDT) 9/6/2023 MEETING LINK: https://usace1.webex.com/usace1/j.php?MTID=m207f15020aa96a9f3e56a79e141e1754 Meeting number:2762 662 3853 Password: Gy9tpcTf@74 Join by video system: Dial 27626623853@usace1.webex.com You can also dial 207.182.190.20 and enter your meeting number. Join by phone +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 2762 662 3853 ------------------------------------------------------------------------------------------------------------- Amendment 0004 provides technical specification and drawings update and an extension to the proposal due date, 9/6/2023 at 1100 hrs. Amendment 0003 provides updated corrected CLIN Schedule. All other Terms and Conditions remain unchanged. Amendment 0002 provides Technical Specification Changes, Drawing Changes, extended proposal due date to 28 August 2023 at 1100am, as well as an update to the Davis Bacon Wage Determination. All other Terms and Conditions remain unchanged. Amendment 0001 extends the proposal due date to 08/17/2023 at 1100am. Pre-Bid Site Visit Sign-in Sheet has been provided. W912HN23B4001 Project No.: ST-22092-3P thru ST-22145-3P, Renovate Willard Training Area Fort Gordon, Georgia The U.S. Army Corps of Engineers (USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN22B4000 for Project Numbers: ST-22092-3P thru ST-22145-3P, Renovate Willard Training Area. The Willard Training Area (WTA) is an outdoor training area within the existing Fort Gordon Army installation. It is utilized by the Cyber Center of Excellence for tactical training. Note:The subsequent solicitation will result in a C-Type Standalone contract. Due to file size, you will have to pull the solicitation specifications and drawings from PIEE Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Seal Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220—Commercial and Institutional Building Construction, with size standard of $45,000,000. Type of Set-aside: This acquisition is being offered as a 100% Total Small Business Set-Aside under NAICS code identified above. Construction Magnitude: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000. Site Visit: 21 July 2023 at 10:30 AM. Meet at Willard (OT-11): 97 22nd Street Extension, Fort Gordon, GA 30905-5730. POC is Brett Wiliford (912)432-3124. Proposal Due Date: 6 September 2023 at 1100am EDT. Period of Performance: The period of performance including all options is 750 Calendar Days after the issuance of the notice to proceed. Project Scope: The Willard Training Area (WTA) is an outdoor training area within the existing Fort Gordon Army installation. It is utilized by the Cyber Center of Excellence for tactical training. The work includes the followingThe work includes infrastructure development, the repair of existing training facilities, demolition of unneeded structures, and improved POV parking and drop off. Work also includes the establishment of Logistic Support Areas for soldier bivouacking on site, a Manhole Training Area, a Pole Orchard, and Tactical Operations Centers with new overhead shelters, antenna pads, and generator pads. The following describes categorization of scope components aligned to Fort Gordon's requirements. 400 Soldier FTX with 50 cadre (TRADOC 350-6 Field Training). 300 Soldier Bivouac with Wash Facilities & Latrines in 2x Logistical Support Areas. 7 Generic Tactical Operation Centers (TOC) hosting 20 Students, 2 instructors & 10 Radios per TOC. Gravel Parking with Overhead Cover for equipment at each TOC. Antennae Pad at each TOC. White Cell Operations and Aid Station.Bus Drop off, POV Parking Spaces and Separately Fenced FTX Area. Cyber Battle Lab Training & Demonstration Area (20 PAX) Outside the FTX area. Electronic Warfare Interim Range Operations & Training with Perimeter Road. Pole Orchard. Manhole Training Area. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at https://sam.gov.Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. Registrations: Offerors shall have and shall maintain an active registration in the following database:System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. The following link is provided to satisfy FAR 36.211(b) reporting requirements for construction contracts anticipated to be awarded to a small business. The information is accessed by clicking on “View Construction Contract Modification Process” (satisfying FAR 36.211(b)(1)) and “View Construction Contract Modification Process Past Performance Data” (satisfying FAR 36.211(b)(2)) on the website provided." https://www.usace.www.acquarmy.mil/Business-With-Us/Partnering/ Point of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Mr. Greg Graham, whose email address is gregory.m.graham@usace.army.mil and Contract Specialist Ms. Tatjana Fisher whose email address is tatjana.m.fisher@usace.army.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HN23B4001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 23, 2023

    Pre-Solicitation W912HN23B4001 - Renovate Willard Training Area, Fort Gordon, GA

    Notice f7cfe1347fa14444a4970fca4fa3235c on SAM.gov

  2. 14×
    SolicitationCurrentJul 7, 2023

    W912HN23B4001 - Renovate Willard Training Area, Fort Gordon, GA

    Notice f80795e7e3d94ae281c44f4386c0b022 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Special Notice April 3, 2025 Announcements Formerly identified as W5168W25BA001 Fort Moore Is now identified by W5168W25RA013, Fort Benning Job Order Contract (JOC) For further updates on this potential/anticipated solicitation, refer to the New Identification Number: W5168W25RA013 New Name: Fort Benning Job Order Contract (JOC) Locations: The U.S. ARMY GARRISON FORT BENNING, ALABAMA/GEORGIA, CAMP MERRILL NEAR DAHLONEGA, GEORGIA, AND OTHER SATELLITE LOCATIONS. End………………………………………………………………………………………………… 10 MAR 2025 Notice/Update The estimated date of the anticipated solicitation is May 23, 2025. _____________________________________________________________________________________________________ Special Notice 13 FEB 2025 For previously posted data on ID W5168W24R0024, please navigate to that announcement. The NEW identification number for the Fort Moore Job Order Contract is W5168W25BA001; please use this identifer when seeking information from 13 FEB 2025 forward. END........................................................................................................................................................................................................
-Special NoticeOpen
VIRTUAL PUBLIC BID OPENING INFORMATION (please copy and paste link into your browser) Join: https://dod.teams.microsoft.us/meet/993292570824?p=KEPF2AUh3TqImHzMJl Meeting ID: 993 292 570 824 Passcode: 73YV3aZ2 Need help? | System reference Dial in by phone +1 503-207-9433,,745152130# United States, Beaverton Find a local number Phone conference ID: 745 152 130# For organizers: Meeting options | Reset dial-in PIN ________________________________________________________________________________ AMENDMENT 0005 – Drawings and Specifications have been updated and are available in PIEE. All other terms and conditions remain unchanged. AMENDMENT 0004 - Proposal due date is extended to 18 August 2026 at 1100 hours via PIEE Solicitation Module. AMENDMENT 0003 – Drawings and Specifications have been updated and are available in PIEE. All other terms and conditions remain unchanged. AMENDMENT 0002 – Proposal due date is extended to 6 August 2026 at 1100 hours via PIEE Solicitation Module. NOTE: Site visit sign in sheet attached. AMENDMENT 0001 – Change the Badge Request Date to July 2. All other terms and conditions remain unchanged. W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: The subsequent solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Product Service Code: Y1BA– Construction of Air Traffic Control Towers Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside. Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000. Site Visit: An organized site visit has been scheduled for-- 7 July 2026 from 10:00-12:30 Contractors will meet in the parking lot across from Building 2336 at the corner of Mustang St and Eagle Ave. Contractors interested in attending the site visit need to email Dedrick Smith (Dedrick. J.Smith@usace.army.mil) the completed "Badge Request Memo Template" with all attendee information no later than noon on 23 June 2026. The "Badge Request Memo Template" is uploaded as an attachment on the PIEE solicitation. Ensure names provided match the ID that will be presented exactly. The Government cannot guarantee that requests sent after 23 June 2026 will be processed in time to allow access to site. Pickup access passes at the Watson Blvd Visitor Center. Two forms of ID are required at the Visitor Center. A list of acceptable forms of ID is uploaded as an attachment on the PIEE solicitation. Visit Center hours are 07:15 - 16:30. Solicitation Due Date: 18 August 2026 at 1100hours via the PIEE Solicitation Module. Bid Opening will be conducted via MS Teams at 1200 hours. Link to the Virtual Bid Opening will be provided one day prior to the bid opening. Period of Performance: The period of performance including all options is 900 Calendar Days after the issuance of the notice to proceed. Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Any reference to W912HN-26-R-A007 in file name or specifications and drawings is referring to the subject project, W912HN26BA007. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Greg Graham - gregory.m.graham@usace.army.mil Contract Specialist - Michelle Munn - michelle.k.munn@usace.army.mil
-Solicitation08/18/2026
AMENDMENT 0003 – Extending the due date until July 21, 2026 and providing changes to the specification, drawings and Geotechnical Report. Please ensure to use the most recent conformed solicitation for submission of your bid. Bldg. 399 repair at Fort Benning, GA NOTE 3 - PLEASE BE ADVISED, AN AMENDMENT AND PROPOSAL DUE DATE EXTENSION WILL BE PROVIDED TOMORROW. AMENDMENT 0002 – Proposal due date has been extended from 10 July 2026 to 16 July 2026 at 1100hours via the PIEE Solicitation Module. Minor updates to clauses have also been provided. Roster for Site Visit 2 has been posted below. All other terms and conditions remain unchanged. NOTE 2 – Roster for Site Visit 1 posted. See Attachments/ Links for list. NOTE 1 – A second site visit will be held on 30 June 2026 at 1000 AM EDT at the Project Site, building 399, Fort Benning, GA. Meet at the interior/courtyard side near Building Section D as shown on drawing Sheet G-001. Access Fort Benning via the Main Gate Visitor Center on Interstate I-185. Plan adequate time for the government to perform a background check and to issue a temporary pass. Have on hand a government issued picture identification and proof of vehicle registration. Visitors do not need to submit name or any information prior to attending. The POC for the site visit is Eddie Culpepper at (706) 617-4047, Eddie.Culpepper@usace.army.mil. AMENDMENT 0001 – Provides Dr. Checks/Projnet Bidder Inquiry Key, and additional attachments for the PPQ and Past Performance Summary Sheet. Please review section 00 21 00 for changes and clarifications. All other terms and conditions remain unchanged. W912HN26RA012 Project No.: PN. 90737 Repair Barracks Building 399 (Section D) Fort Benning, GA The U.S. Army Corps of Engineers (USACE) Savannah District is issuing a Request for Proposal (RFP) solicitation for W912HN26RA012 for Project Number: 90737, Repair Barracks Building 399; Fort Benning, Georgia. Note: This solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Request for Proposal will be for the award of one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Selection Process: The contract will be solicited and procured via The Revolutionary FAR Overhaul (RFO) Part 15, Contracting by Negotiations, Lowest Price Technically Acceptable (LPTA) source selection process in accordance with RFO 15.101-2. Product Service Code: Z2FC – Repair or Alteration of Troop Housing Facilities. Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside IAW RFO 19.5. Construction Magnitude: The magnitude of this construction project is anticipated to be between $25,000,000 and $50,000,000. Proposal Due Date: 16 July 2026 at 1100hours via the PIEE Solicitation Module. Site Visit: SEE NOTE ABOVE A site visit will be held on 17 June 2026 at 1400 (2 PM EDT) at the Project Site, building 399, Fort Benning, GA. Meet at the interior/courtyard side near Building Section D as shown on drawing Sheet G-001. Access Fort Benning via the Main Gate Visitor Center on Interstate I-185. Plan adequate time for the government to perform a background check and to issue a temporary pass. Have on hand a government issued picture identification and proof of vehicle registration. Visitors do not need to submit name or any information prior to attending. The POC for the site visit is Josh Cook at (912) 910-1175, Joshua.L.Cook@usace.army.mil. Period of Performance: The period of performance including all options is anticipated to be 840 Calendar Days after the issuance of the notice to proceed. Description of Work: Project repairs failed and failing components of Barracks Building 399 Section D at Fort Benning, GA. The building systems scheduled for repair include exterior walls, windows, doors, fire protection, interior walls, interior finishes, finish floors, ceilings, plumbing, HVAC, HVAC controls, electrical, electrical service, distribution, building information systems, and flat roofs near the stairwells. Includes site work repairs and demolition necessary to allow for the repairs and HAZMAT lead based paint and asbestos abatement. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Gregory Graham - gregory.m.graham@usace.army.mil Contract Specialist – Ms. Fabiola Ducelus – fabiola.ducelus@usace.army.mil
-Solicitation07/21/2026
Pre-Solicitation Notice Synopsis For W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no bids are being accepted. The subsequent solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Product Service Code: Y1BA– Construction of Air Traffic Control Towers Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside. Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000. Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 15 June 2026 and the approximate closing date is on or about 14 July 2026. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted. Period of Performance: The period of performance including all options is 780 Calendar Days after the issuance of the notice to proceed. Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Greg Graham - gregory.m.graham@usace.army.mil Contract Specialist - Michelle Munn - michelle.k.munn@usace.army.mil
-Pre-Solicitation06/12/2026
Amendment 0002 - Clarified procedures related to Affiliated Company evaluation in accordance with DFARS 215.305(a)(2)(C). No extension has been provided. All other terms and conditions remain unchanged. Amendment 0001/0101 - Proposal due date has bene extended to 18 December 2025 at 1100 hrs vs the PIEE Solicitation Module. Additional Clarification has been provided for the Compliance Gate (in red) on the conformed solicitation. The U.S. Army Corps of Engineers (USAGE) Savannah District is issuing a Two-Phase Design-Build Solicitation for a Multiple Award Task Order Contract under which task orders for General Construction are expected to be issued for projects within the Savannah District area of responsibility (AOR), primarily Georgia and North Carolina. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction Note. This solicitation will result in a D-Type Indefinite Delivery Contract (IDC). Due to changes in the contract writing system and the solicitation timeline, references to other Solicitation numbers may present. W912HN26RA005, W912HN25RA020, & W912HN24R4000 are applicable to this Solicitation. The awarded MATOC Contracts will have a base period of five (5) years. The Government will perform a Best Value Decision using Two-Phase Design-Build selection procedure in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $7M and $30M. Task orders issued under this MATOC will be firm-fixed price. All other resultant task orders may include options. NAICS: The North American Industry Classification System (NAICS) code is 236220-Commerical and Institutional Building Construction, with a size standard of $45M. Type of Set-Aside: This acquisition is being offered as a 100% Small Business Set-Aside under NAICS code identified above. Proposal Due Date: 18 December 2025 at 1100hrs EST via the PIEE Solicitation Module. Description of Work: Task orders placed under this MATOC shall be that of a design-build, design-bid-build construction, or construction only in nature. This MATOC for General Construction projects is intended to provide an agile acquisition tool to procure new construction, renovation, maintenance or repair and incidental work to include, site work, mechanical systems, plumbing, utility systems, structural, electrical, and HVAC. Evaluation Criteria: The Government will use a best value decision for award of this procurement. Only those Offerors whose proposals provide the best overall value will be awarded contracts with a minimum guarantee of $2,500.00. The evaluation factors for this solicitation and are as follows: Solicitation Compliance Criteria: The government will perform an assessment of minimum "go/no go" or gate solicitation compliance criteria that an offeror's proposal must meet before advancing to Phase One in the proposal evaluation process. This is not an evaluation of any factors, but to confirm the inclusion of the minimum requirements of the proposal as stated in the solicitation. If an offeror does not pass the solicitation compliance criteria review, the proposal is not further evaluated in Phase One and is eliminated from consideration for award preventing additional unnecessary expenditure of the Government's and offeror's time and money on an unviable offer. Each Offeror's Past Performance Summary Sheet (Attachment 2) will be reviewed as part of Phase One Compliance. Each submitted project provided on the project summary sheet will be reviewed against the submission requirements identified in Paragraph 6.2.8. Offeror's submitted projects identified on the Past Performance Summary Sheet (Attachment 2) shall meet the minimum submission requirements of a current or completed awarded project value of no less than $15 Million each and three (3) Design-Build, 2 New Construction and 1 Renovation. Offeror's proposals that meet the minimum submission criteria identified in Paragraph 6.2.8 will be provided a "Go" and the proposal will advance to the Phase One evaluation process. Offeror's proposals that do not meet the minimum submission criteria identified in Paragraph 6.2.8 will receive a "No-Go", and that proposal will not advance to the Phase One Evaluation. Offerors whose proposals receive a "No-Go" will be notified in accordance with FAR 15.503 (a)(1). Attachment 2 shall be completed in its entirety. The Summary Sheet shall be the same projects submitted under FACTOR 1, Past Performance. No narrative information will be reviewed with the Phase One Compliance Review, only the completed fields of the attachment. Factor 1, Past Performance will be evaluated in its entirely after receiving a "Go" from the compliance gate. To ensure the Government can target award to a pool of eight (8) MATOC holders, the Government will target twelve (12) of the most highly qualified offers to advance from Phase One to Phase Two. This solicitation includes a notice to offerors that, pursuant to FAR 15.306(c)(2), the contracting officer may also limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. PHASE One: FACTOR 1: PAST PERFORMANCE FACTOR 2: DESIGN EXPERIENCE The Government will evaluate the performance capability of the proposals in accordance with the criteria provided in the solicitation and will target twelve (12) of the most highly qualified Offerors to participate in Phase Two. PHASE Two: FACTOR 3: TECHNICAL CAPABILITY (Management Approach) PRICE: Price will not be rated but will be a factor in establishing a competitive range prior to discussions (if held) and in making the best value decision for award of any resultant contract(s). In Phase Two of the process, the Government will evaluate both price and technical capability (management approach) The award will be made to a target of eight (8) Offerors whose proposals represent the best overall value to the Government. Awards will be made to the Offerors whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror. Consolidation: This MATOC constitutes consolidation in that it combines construction projects at multiple discrete sites into one contract, this approach provides the best combination of competitive procedures, streamlined acquisition, qualified prime contractors, efficient use of manpower, and some cost efficiency—thereby providing the best way to support SAS’s MILCON/Large SRM program. Per FAR 7.107-2(d)(3), quantifiable benefits of administrative/personnel cost savings for this $400 Million procurement must exceed the 10% threshold, or $40 Million, to clearly justify a financial benefit of consolidation. Although the savings demonstrated above do not meet the threshold in FAR 7.107-2(d)(3), when comparing a MATOC and other procurement methods, other benefits are clearly demonstrated. The consolidation of requirements under this MATOC is critical to SAS’s success in meeting DoD requirements can be met when projects are not received in sufficient time to compete as full and open standalone requirements. Although this procurement will be set aside for small businesses, all firms will be invited to compete and will receive fair consideration for a contract under this MATOC. Considering the discussion provided above, consolidation is necessary and justified as the benefits of consolidation substantially exceed the benefits of the alternative contracting approaches. Fulfilling this requirement through separate, stand-alone contracts would result in considerable risk of higher costs and scheduling constraints to the Government. Consolidation of the requirements promotes flexibility to complete the work in the time frame required due to funding constraints. Consolidation will not negatively impact small business participation in these programs but will promote competition and motivate both lower costs to the contractor and overall better pricing for the Government. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Alicia Scott whose e-mail address is alicia.d.scott@usace.army.mil.
-Solicitation12/18/2025

Additional Details

Solicitation Number

W912HN23B4001

Archive Date

Aug 22, 2024

Office Address

SAVANNAH, GA, 31401-3604