Notice ID: e6d310b4bcca49c39ea797af6d308107Solicitation
100% Total Small Business Set-Aside Two-Phase Design-Build Selection Procedures Repair 24-Series Barracks at Fort Gordon, GA
Archived on July 23, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−04:00
- Posted
- August 30, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST SAVANNAH
- Place of performance
- Fort Gordon, GA
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912HN23R4005
- Notice ID
- e6d310b4bcca49c39ea797af6d308107
Description
Amendment 0002 - Phase Two has been posted. Only those notified via email will be authorized to proceed to Phase Two will have access to the files. Login at https://piee.eb.mil and search for 'W912HN23R40X5' to obtain more details.* Amendment 0001 - Administrative and clarification updates. All other terms and conditions remain unchanged W912HN23R4005 100% Total Small Business Set-Aside Two-Phase Design-Build Selection Procedures Repair 24-Series Barracks at Fort Gordon, GA Savannah District - USACE The U.S. Army Corps of Engineers (USACE) Savannah District is issuing a single Two-Phase Design-Build Solicitation to award up to three (3) separate contracts from the solicitation to three (3) separate offerors whose proposal represents the best overall value and is determined to provide the most benefit to the Government. Note: The subsequent solicitation will result in a C-Type Contract. Each Barracks is identified as an individual project.For the purposes of the solicitation, the Government will utilize the Two-Phase Design-Build Selection Process. In Phase One of the Two-Phase Design-Build selection procedures, interested Offerors will submit specified performance capability proposals for review, consideration, and evaluation by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described within the solicitation. NAICS: The North American Industry Classification System (NAICS) code is 236220-Commerical and Institutional Building Construction, with a size standard of $45M. Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside under NAICS code identified above. Proposal due date via PIEE 3 August 2023. Description of Work: Barracks Building 24406 and 24413, 24401 and 24412, and 24405, are located at Fort Gordon in need of repair and renovation. This work for each building is anticipated to include replacing failed fan coil units with the central HVAC system. The installation of new HVAC controls that includes full integration with UMCS to achieve Army energy goals. The installation of new fire alarm systems. Mold and mildew abatement and remediation. The renovation of all rooms to new standards as provided within the to be provided RFP package. Installation of new flooring. lighting. and ceilings and the renovation of latrine as specified within the to be RFP package. Evaluation Criteria: The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will target no more than five (5) of the most highly qualified Offerors to proceed to Phase Two. Only those Offerors who receive a written notification from Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation will be invited to submit a Phase Two proposal. Those five (5) of the most highly qualified Offerors selected for Phase Two will be provided the Technical Specifications for the three projects. In Phase Two, the five (5) highly qualified offerors will each be provided the Technical Specification RFPs for projects 24406 and 24413, 24401 and 24412, and 24405. Offerors will submit a Factor 3 Management Approach and Price proposal on each project. Evaluations of both Phase One and Phase Two factors using a Best Value Tradeoff in accordance with FAR 15.101-2 will be conducted for each contract. Each Phase Two proposal will be evaluated on an individual basis starting with 24406 and 24413, followed by 24401 and 24412, followed by 24405. The responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24406 and 24413. That offeror will be removed from the remaining highly qualified offerors participating in Phase Two. Of the remaining highly qualified offerors, the responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24401 and 24412.That offeror will be removed from the remaining highly qualified offerors participating in Phase Two. Of the remaining highly qualified offerors, the responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24405. No single offeror shall be awarded more than one (1) contract as a result of this solicitation. PHASE I: FACTOR 1: PAST PERFORMANCE FACTOR 2: DESIGN EXPERIENCE PHASE II: FACTOR 3: TECHNICAL CAPABILITY (Management Approach) RELATIVE IMPORTANCE OF FACTORS PHASE ONE AND PHASE TWO FACTOR 1 (Past Performance) is equal in importance to FACTOR 3 (Management Approach) FACTOR 2 (Design Experience) is less important than either FACTOR 1 (Past Performance) and FACTOR 3 (Management Approach) FACTOR 3 (Management Approach) is equal in importance to FACTOR 1 (Past Performance) and both are more important than FACTOR 2 (Design Experience) PRICE: All Phase One and Phase Two non-cost factors, when combined, are equal in importance to Price. Price will not be rated, but will be a factor in establishing the best value in Phase II prior to discussions (if held) and in making the best value decision for award of any resultant contract. The Government will perform a price analysis on all proposals received. Price analysis will be performed in accordance with FAR 15.404-1 to determine fairness and reasonableness. Historical price information, competitive price information, the Independent Government Estimate (IGE), or any other pricing tool as necessary will be utilized in this analysis. The evaluation will determine the extent to which the price proposal is consistent with the requirements of the solicitation. Offerors are advised that any offer wherein pricing is deemed unfair or unreasonable may be rendered ineligible for award. The Government shall use the base bid and all options from the price schedule as the evaluated price for making the best value decision. AWARD: Contract award will be made in accordance with FAR 52.215-1. In order to determine which proposal represents the best value, a comparative assessment ofproposals against all source selection criteria in this solicitation will be conducted. The responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24406 and 24413. That offeror will be removed from the remaining highly qualified offerors participating in Phase Two. Of the remaining highly qualified offerors, the responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24401 and 24412. That offeror will be removed from the remaining highly qualified offerors participating in Phase Two. Of the remaining highly qualified offerors, the responsible offeror whose proposal contains the combination of the criteria described in this document offering the best value to the Government will be awarded the contract for Bldg. 24405. The Government reserves the right to make award to other than the lowest priced offer and to reject any and all offers. Only one (1) offeror will be selected per project to be awarded. No offeror will be awarded more than one (1) contract as a result of this solicitation Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. The following link is provided to satisfy FAR 36.211(b) reporting requirements for construction contracts anticipated to be awarded to a small business. The information is accessed by clicking on View Construction Contract Modification Process (satisfying FAR 36.211(b)(1)) and View Construction Contract Modification Process Past Performance Data (satisfying FAR 36.211(b)(2)) on the website provided." https://www.usace.www.acquarmy.mil/Business-With-Us/Partnering/ Point of Contacts: For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912HN23R4005- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×Pre-SolicitationJun 15, 2023
Pre-Solicitation W912HN23R4005 100% Total Small Business Set-Aside Two-Phase Design-Build Selection Procedures Repair 24-Series Barracks at Fort Gordon, GA
- 7×SolicitationCurrentJul 3, 2023
100% Total Small Business Set-Aside Two-Phase Design-Build Selection Procedures Repair 24-Series Barracks at Fort Gordon, GA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
AMENDMENT 0003 – Extending the due date until July 21, 2026 and providing changes to the specification, drawings and Geotechnical Report. Please ensure to use the most recent conformed solicitation for submission of your bid. Bldg. 399 repair at Fort Benning, GA NOTE 3 - PLEASE BE ADVISED, AN AMENDMENT AND PROPOSAL DUE DATE EXTENSION WILL BE PROVIDED TOMORROW. AMENDMENT 0002 – Proposal due date has been extended from 10 July 2026 to 16 July 2026 at 1100hours via the PIEE Solicitation Module. Minor updates to clauses have also been provided. Roster for Site Visit 2 has been posted below. All other terms and conditions remain unchanged. NOTE 2 – Roster for Site Visit 1 posted. See Attachments/ Links for list. NOTE 1 – A second site visit will be held on 30 June 2026 at 1000 AM EDT at the Project Site, building 399, Fort Benning, GA. Meet at the interior/courtyard side near Building Section D as shown on drawing Sheet G-001. Access Fort Benning via the Main Gate Visitor Center on Interstate I-185. Plan adequate time for the government to perform a background check and to issue a temporary pass. Have on hand a government issued picture identification and proof of vehicle registration. Visitors do not need to submit name or any information prior to attending. The POC for the site visit is Eddie Culpepper at (706) 617-4047, Eddie.Culpepper@usace.army.mil. AMENDMENT 0001 – Provides Dr. Checks/Projnet Bidder Inquiry Key, and additional attachments for the PPQ and Past Performance Summary Sheet. Please review section 00 21 00 for changes and clarifications. All other terms and conditions remain unchanged. W912HN26RA012 Project No.: PN. 90737 Repair Barracks Building 399 (Section D) Fort Benning, GA The U.S. Army Corps of Engineers (USACE) Savannah District is issuing a Request for Proposal (RFP) solicitation for W912HN26RA012 for Project Number: 90737, Repair Barracks Building 399; Fort Benning, Georgia. Note: This solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Request for Proposal will be for the award of one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Selection Process: The contract will be solicited and procured via The Revolutionary FAR Overhaul (RFO) Part 15, Contracting by Negotiations, Lowest Price Technically Acceptable (LPTA) source selection process in accordance with RFO 15.101-2. Product Service Code: Z2FC – Repair or Alteration of Troop Housing Facilities. Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside IAW RFO 19.5. Construction Magnitude: The magnitude of this construction project is anticipated to be between $25,000,000 and $50,000,000. Proposal Due Date: 16 July 2026 at 1100hours via the PIEE Solicitation Module. Site Visit: SEE NOTE ABOVE A site visit will be held on 17 June 2026 at 1400 (2 PM EDT) at the Project Site, building 399, Fort Benning, GA. Meet at the interior/courtyard side near Building Section D as shown on drawing Sheet G-001. Access Fort Benning via the Main Gate Visitor Center on Interstate I-185. Plan adequate time for the government to perform a background check and to issue a temporary pass. Have on hand a government issued picture identification and proof of vehicle registration. Visitors do not need to submit name or any information prior to attending. The POC for the site visit is Josh Cook at (912) 910-1175, Joshua.L.Cook@usace.army.mil. Period of Performance: The period of performance including all options is anticipated to be 840 Calendar Days after the issuance of the notice to proceed. Description of Work: Project repairs failed and failing components of Barracks Building 399 Section D at Fort Benning, GA. The building systems scheduled for repair include exterior walls, windows, doors, fire protection, interior walls, interior finishes, finish floors, ceilings, plumbing, HVAC, HVAC controls, electrical, electrical service, distribution, building information systems, and flat roofs near the stairwells. Includes site work repairs and demolition necessary to allow for the repairs and HAZMAT lead based paint and asbestos abatement. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Gregory Graham - gregory.m.graham@usace.army.mil Contract Specialist – Ms. Fabiola Ducelus – fabiola.ducelus@usace.army.mil | - | Solicitation | 07/21/2026 |
VIRTUAL PUBLIC BID OPENING INFORMATION (please copy and paste link into your browser) Join: https://dod.teams.microsoft.us/meet/993292570824?p=KEPF2AUh3TqImHzMJl Meeting ID: 993 292 570 824 Passcode: 73YV3aZ2 Need help? | System reference Dial in by phone +1 503-207-9433,,745152130# United States, Beaverton Find a local number Phone conference ID: 745 152 130# For organizers: Meeting options | Reset dial-in PIN ________________________________________________________________________________ AMENDMENT 0005 – Drawings and Specifications have been updated and are available in PIEE. All other terms and conditions remain unchanged. AMENDMENT 0004 - Proposal due date is extended to 18 August 2026 at 1100 hours via PIEE Solicitation Module. AMENDMENT 0003 – Drawings and Specifications have been updated and are available in PIEE. All other terms and conditions remain unchanged. AMENDMENT 0002 – Proposal due date is extended to 6 August 2026 at 1100 hours via PIEE Solicitation Module. NOTE: Site visit sign in sheet attached. AMENDMENT 0001 – Change the Badge Request Date to July 2. All other terms and conditions remain unchanged. W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District is issuing an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: The subsequent solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Product Service Code: Y1BA– Construction of Air Traffic Control Towers Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside. Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000. Site Visit: An organized site visit has been scheduled for-- 7 July 2026 from 10:00-12:30 Contractors will meet in the parking lot across from Building 2336 at the corner of Mustang St and Eagle Ave. Contractors interested in attending the site visit need to email Dedrick Smith (Dedrick. J.Smith@usace.army.mil) the completed "Badge Request Memo Template" with all attendee information no later than noon on 23 June 2026. The "Badge Request Memo Template" is uploaded as an attachment on the PIEE solicitation. Ensure names provided match the ID that will be presented exactly. The Government cannot guarantee that requests sent after 23 June 2026 will be processed in time to allow access to site. Pickup access passes at the Watson Blvd Visitor Center. Two forms of ID are required at the Visitor Center. A list of acceptable forms of ID is uploaded as an attachment on the PIEE solicitation. Visit Center hours are 07:15 - 16:30. Solicitation Due Date: 18 August 2026 at 1100hours via the PIEE Solicitation Module. Bid Opening will be conducted via MS Teams at 1200 hours. Link to the Virtual Bid Opening will be provided one day prior to the bid opening. Period of Performance: The period of performance including all options is 900 Calendar Days after the issuance of the notice to proceed. Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Any reference to W912HN-26-R-A007 in file name or specifications and drawings is referring to the subject project, W912HN26BA007. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Greg Graham - gregory.m.graham@usace.army.mil Contract Specialist - Michelle Munn - michelle.k.munn@usace.army.mil | - | Solicitation | 08/18/2026 |
Pre-Solicitation Notice Synopsis For W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no bids are being accepted. The subsequent solicitation will result in a C-Type Stand-alone contract. Type of Contract & NAICS: This Acquisition will be solicited using FAR Part 14, Sealed Bid Procedures for one (1) Firm-Fixed-Price (FFP) contract. The North American Industry Classification System (NAICS) code is 236220 – Commercial and Institutional Building Construction, with a Small Business size standard of $45M. Product Service Code: Y1BA– Construction of Air Traffic Control Towers Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside. Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000. Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 15 June 2026 and the approximate closing date is on or about 14 July 2026. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted. Period of Performance: The period of performance including all options is 780 Calendar Days after the issuance of the notice to proceed. Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility. This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: Contracting Officer - Mr. Greg Graham - gregory.m.graham@usace.army.mil Contract Specialist - Michelle Munn - michelle.k.munn@usace.army.mil | - | Pre-Solicitation | 06/12/2026 |
Amendment 0002 - Clarified procedures related to Affiliated Company evaluation in accordance with DFARS 215.305(a)(2)(C). No extension has been provided. All other terms and conditions remain unchanged. Amendment 0001/0101 - Proposal due date has bene extended to 18 December 2025 at 1100 hrs vs the PIEE Solicitation Module. Additional Clarification has been provided for the Compliance Gate (in red) on the conformed solicitation. The U.S. Army Corps of Engineers (USAGE) Savannah District is issuing a Two-Phase Design-Build Solicitation for a Multiple Award Task Order Contract under which task orders for General Construction are expected to be issued for projects within the Savannah District area of responsibility (AOR), primarily Georgia and North Carolina. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction Note. This solicitation will result in a D-Type Indefinite Delivery Contract (IDC). Due to changes in the contract writing system and the solicitation timeline, references to other Solicitation numbers may present. W912HN26RA005, W912HN25RA020, & W912HN24R4000 are applicable to this Solicitation. The awarded MATOC Contracts will have a base period of five (5) years. The Government will perform a Best Value Decision using Two-Phase Design-Build selection procedure in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $7M and $30M. Task orders issued under this MATOC will be firm-fixed price. All other resultant task orders may include options. NAICS: The North American Industry Classification System (NAICS) code is 236220-Commerical and Institutional Building Construction, with a size standard of $45M. Type of Set-Aside: This acquisition is being offered as a 100% Small Business Set-Aside under NAICS code identified above. Proposal Due Date: 18 December 2025 at 1100hrs EST via the PIEE Solicitation Module. Description of Work: Task orders placed under this MATOC shall be that of a design-build, design-bid-build construction, or construction only in nature. This MATOC for General Construction projects is intended to provide an agile acquisition tool to procure new construction, renovation, maintenance or repair and incidental work to include, site work, mechanical systems, plumbing, utility systems, structural, electrical, and HVAC. Evaluation Criteria: The Government will use a best value decision for award of this procurement. Only those Offerors whose proposals provide the best overall value will be awarded contracts with a minimum guarantee of $2,500.00. The evaluation factors for this solicitation and are as follows: Solicitation Compliance Criteria: The government will perform an assessment of minimum "go/no go" or gate solicitation compliance criteria that an offeror's proposal must meet before advancing to Phase One in the proposal evaluation process. This is not an evaluation of any factors, but to confirm the inclusion of the minimum requirements of the proposal as stated in the solicitation. If an offeror does not pass the solicitation compliance criteria review, the proposal is not further evaluated in Phase One and is eliminated from consideration for award preventing additional unnecessary expenditure of the Government's and offeror's time and money on an unviable offer. Each Offeror's Past Performance Summary Sheet (Attachment 2) will be reviewed as part of Phase One Compliance. Each submitted project provided on the project summary sheet will be reviewed against the submission requirements identified in Paragraph 6.2.8. Offeror's submitted projects identified on the Past Performance Summary Sheet (Attachment 2) shall meet the minimum submission requirements of a current or completed awarded project value of no less than $15 Million each and three (3) Design-Build, 2 New Construction and 1 Renovation. Offeror's proposals that meet the minimum submission criteria identified in Paragraph 6.2.8 will be provided a "Go" and the proposal will advance to the Phase One evaluation process. Offeror's proposals that do not meet the minimum submission criteria identified in Paragraph 6.2.8 will receive a "No-Go", and that proposal will not advance to the Phase One Evaluation. Offerors whose proposals receive a "No-Go" will be notified in accordance with FAR 15.503 (a)(1). Attachment 2 shall be completed in its entirety. The Summary Sheet shall be the same projects submitted under FACTOR 1, Past Performance. No narrative information will be reviewed with the Phase One Compliance Review, only the completed fields of the attachment. Factor 1, Past Performance will be evaluated in its entirely after receiving a "Go" from the compliance gate. To ensure the Government can target award to a pool of eight (8) MATOC holders, the Government will target twelve (12) of the most highly qualified offers to advance from Phase One to Phase Two. This solicitation includes a notice to offerors that, pursuant to FAR 15.306(c)(2), the contracting officer may also limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. PHASE One: FACTOR 1: PAST PERFORMANCE FACTOR 2: DESIGN EXPERIENCE The Government will evaluate the performance capability of the proposals in accordance with the criteria provided in the solicitation and will target twelve (12) of the most highly qualified Offerors to participate in Phase Two. PHASE Two: FACTOR 3: TECHNICAL CAPABILITY (Management Approach) PRICE: Price will not be rated but will be a factor in establishing a competitive range prior to discussions (if held) and in making the best value decision for award of any resultant contract(s). In Phase Two of the process, the Government will evaluate both price and technical capability (management approach) The award will be made to a target of eight (8) Offerors whose proposals represent the best overall value to the Government. Awards will be made to the Offerors whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror. Consolidation: This MATOC constitutes consolidation in that it combines construction projects at multiple discrete sites into one contract, this approach provides the best combination of competitive procedures, streamlined acquisition, qualified prime contractors, efficient use of manpower, and some cost efficiency—thereby providing the best way to support SAS’s MILCON/Large SRM program. Per FAR 7.107-2(d)(3), quantifiable benefits of administrative/personnel cost savings for this $400 Million procurement must exceed the 10% threshold, or $40 Million, to clearly justify a financial benefit of consolidation. Although the savings demonstrated above do not meet the threshold in FAR 7.107-2(d)(3), when comparing a MATOC and other procurement methods, other benefits are clearly demonstrated. The consolidation of requirements under this MATOC is critical to SAS’s success in meeting DoD requirements can be met when projects are not received in sufficient time to compete as full and open standalone requirements. Although this procurement will be set aside for small businesses, all firms will be invited to compete and will receive fair consideration for a contract under this MATOC. Considering the discussion provided above, consolidation is necessary and justified as the benefits of consolidation substantially exceed the benefits of the alternative contracting approaches. Fulfilling this requirement through separate, stand-alone contracts would result in considerable risk of higher costs and scheduling constraints to the Government. Consolidation of the requirements promotes flexibility to complete the work in the time frame required due to funding constraints. Consolidation will not negatively impact small business participation in these programs but will promote competition and motivate both lower costs to the contractor and overall better pricing for the Government. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation. Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: For this acquisition, the contracting officer, Mr. Greg Graham, whose e-mail address is gregory.m.graham@usace.army.mil., and the Contract Specialist, Alicia Scott whose e-mail address is alicia.d.scott@usace.army.mil. | - | Solicitation | 12/18/2025 |
Special Notice April 3, 2025 Announcements Formerly identified as W5168W25BA001 Fort Moore Is now identified by W5168W25RA013, Fort Benning Job Order Contract (JOC) For further updates on this potential/anticipated solicitation, refer to the New Identification Number: W5168W25RA013 New Name: Fort Benning Job Order Contract (JOC) Locations: The U.S. ARMY GARRISON FORT BENNING, ALABAMA/GEORGIA, CAMP MERRILL NEAR DAHLONEGA, GEORGIA, AND OTHER SATELLITE LOCATIONS. End………………………………………………………………………………………………… 10 MAR 2025 Notice/Update The estimated date of the anticipated solicitation is May 23, 2025. _____________________________________________________________________________________________________ Special Notice 13 FEB 2025 For previously posted data on ID W5168W24R0024, please navigate to that announcement. The NEW identification number for the Fort Moore Job Order Contract is W5168W25BA001; please use this identifer when seeking information from 13 FEB 2025 forward. END........................................................................................................................................................................................................ | - | Special Notice | Open |
Additional Details
Solicitation Number
W912HN23R4005
Archive Date
Jul 23, 2024
Office Address
SAVANNAH, GA, 31401-3604