Notice ID: 4ab08c83a02349809d4d09e3591565e5Solicitation
FY23 J Strom Thurmond Project- Richard B. Russell Project -Savannah River Below Augusta
Archived on August 20, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- August 21, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 561210: Facilities Support Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W074 ENDIST SAVANNAH
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912HN23R5001
- Notice ID
- 4ab08c83a02349809d4d09e3591565e5
Description
Amendment 0003, Purpose - The purpose of this amendment is to add Attachment 12 - Proposal Data Sheet. Close Date: Not Extended. Amendment 0002, Purpose - The purpose of this amendment is to update the SOW (dtd 10 Aug 2023), revise estimated quantities, delete references to FAR clauses 52.222-46 and 52.237-10, add Section J - List of Attachments. The due date of this solicitation is extended to 1:00pm 28 August 2023. Amendment 0001, Purpose - The purpose of this amendment is to revise the SOW and estimated quantities. Additionally, the following Appendices have been updated- Appendix G Recreation Schedule 2024-2028, Appendix H Facility Listing, Appendix K JST Wells, and Appendix M Beach Sampling Procedures. Appendix L is no longer applicable and has been removed from this solicitation. The Contract Specialist and Primary POC for this Solicitation is Jennifer Ford, Jennifer.M.Ford@usace.army.mil. FY 23 J Strom Thurmond Project; Richard B. Russell Project; Savannah River Below Augusta. The purpose of this contract is to provide the maintenance, repair, minor construction, and operation of the J. Strom Thurmond Project to include the Project Manager?s Office, campgrounds, day-use parks, boating access areas, dam, power plant, Richard B. Russell Project, Savannah River Below Augusta (SRBA), and other project resources as specified in the technical provisions. Type of Contract and NAICS: This Acquisition will be solicited using FAR Part 15, Contracting by Negotiation for one (1) Hybrid Firm-Fixed-Price (FFP) and Cost-Plus-Fixed-Fee (CPFF) contract. The North American Industry Classification System (NAICS) code is 561210?Facilities Support Services with size standard of $47,000,000. Type of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside under NAICS code 561210. See Solicitation documents for further details. Information found on https://www.usace.army.mil/Business-With-Us/Partnering/ is provided to comply with FAR 36.211 (b).
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912HN23R5001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 27, 2023
Presolicitation Notice for FY 23 J. Strom Thurmond Project; Richard B. Russell Project; Savannah River Below Augusta
- 7×SolicitationCurrentJul 21, 2023
FY23 J Strom Thurmond Project- Richard B. Russell Project -Savannah River Below Augusta
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a Sources Sought Notice ONLY. The Government intends to extend the current CPFF contract on a Sole Source basis to TSAY Professional Services, Inc for a three (3) to nine (9) month period of performance. The statutory authority for the sole source is 10 United States Code 2304(c)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(iii), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. This notice does not constitute a Request for Quote (RFQ)/Invitation for Bid (IFB)/Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. This notice does not constitute a Request for Quote (RFQ)/Invitation for Bid (IFB)/Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Any information provided in response to the sources sought will not be returned to the responder. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. However, if a competitive solicitation is released, it will be synopsized on the Governmentwide Point of Entry. The NAICS code is 561210, Facilities Support Services. It is the responsibility of potential offerors to monitor the Governmentwide Point of Entry for additional information pertaining to this requirement. In response to this sources sought, please provide: 1. Identify any condition or action that may be having the effect of unnecessarily restricting competition with respect to this acquisition and identify alternatives or solution solutions. Also contact the MICC Advocate for Competition, Scott Kukes, at scott.d.kukes.civ@army.mil or 520-944-7373, if you believe that this action is unreasonably restricting competition. Include the subject of the acquisition, this announcement, and the MICC POC information from the Sources Sought Synopsis. Provide the specific aspects that unreasonably restrict competition and the rationale for such conclusion. 2. Name of the firm, point of contact, phone number, email address, DUNS number, CAGE code, identify business size (large business or a small business), and if applicable, a statement regarding small business status (including small business type(s)/certifications(s) such as SDB, 8(a), HUBZone, SDVOSB, WOSB, etc.) and the corresponding NAICS code. 3. Identify whether your firm is interested in competing for this requirement as a prime contractor or not. Identify subcontracting, joint ventures or teaming arrangement that will be pursued, if any. 4. Information in sufficient detail regarding previous experience (indicate whether as a prime contractor or subcontractor) on similar requirements (include size, scope, complexity, timeframe, government or commercial), pertinent certifications, etc., that will facilitate making a capability determination. 5. Information to help determine if the requirement (item or service) is commercially available, including pricing information, basis for the pricing information (e.g., market pricing, catalog pricing), delivery schedules, customary terms and conditions, warranties, etc. 6. Identify how the Army can best structure these contract requirements to facilitate competition, including competition among small business concerns. 7. Recommendations to improve the Army’s specifications for acquiring the identified items/services. | 65% | Market Research | 11/18/2026 |
This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of 8(a) small business firms for a potential Government requirement which the Government intends to compete as a competitive 8(a). NO SOLICITATION IS AVAILABLE. Requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE:The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for facilities and utilities maintenance services at U.S. Army Military Ocean Terminal Concord (MOTCO) in Concord, California. USACE SPKs intent is to solicit and award a competitive 8(a) small business requirement.Project Description: This is a non-personal services project to provide Facilities and Utilities Maintenance at U.S. Army Military Ocean Terminal Concord (MOTCO) across the following functional areas: Maintenance Management Services, Electrical Plants and Distribution Systems, Water Distribution Systems, Wastewater Systems, Stormwater Systems, Fire Protection Systems, Buildings and Structures and Installed Equipment, Pest Management, Roads and paved surfaces, Pier Maintenance and various miscellaneous maintenance requirements, and repair requirements including minor construction in accordance with the Performance Work Statement. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, other items, and non-personal services. The Contractor is fully responsible for provisioning all parts required to execute both Preventive Maintenance Orders (PMOs) and Demand Maintenance Orders (DMOs). The potential requirement may result in a firm-fixed-price solicitation with a 6-month or 12-month to include one month Phase-in Period for the base period with four 1-year option periods. The Government intends to issue the solicitation on or around November 2026. If solicited, the Government intends to award the anticipated requirement by approximately June 2027. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 561210, Facilities Support Services. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $47,000,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be M1AZ, Operation of Other Administrative Facilities and Service Buildings.Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements.CAPABILITY STATEMENT:Industry is highly encouraged to fill out the market survey form at: MOTCO Facilities and Utilities Maintenance Services - Prefilled formResponses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted or the capability statements received. Please provide responses with the above link or submit questions by e-mail to the Contract Specialist, Melita Doyle, at (Melita.S.Doyle@usace.army.mil) by 1400 / 2:00 P.M. (Pacific Time) 08 October 2026. Please include the Sources Sought Notice number W9123826X1CDK in the e-mail subject line. | 65% | Market Research | 10/08/2026 |
The Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson, is issuing a solicitation for a contractor to provide Base Operations Support Services at the U.S. Army Fort Carson, CO.Description of Services:The Contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. Work includes all required maintenance, labor, materials and repairs to facilities, structures, buildings, and utilities that are classified as real property, and Army Training and Evaluation Center non-real properties, unless otherwise stated in this contract, to include installed building equipment as defined in Army Regulation (AR) 420-1, Army Facilities Management. The following is a list of Common Level of Services (CLS) that will be included in this acquisition:CLS Service Title404 Grounds Maintenance408 Pavement Clearance411 Facility Maintenance - Vertical420 Facility Maintenance - Horizontal501 Heating and Cooling Services503 Wastewater Services | 65% | Awarded | Open |
The Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson, is issuing a solicitation for a contractor to provide Base Operations Support Services at the U.S. Army Fort Carson, CO.Description of Services:The Contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. Work includes all required maintenance, labor, materials and repairs to facilities, structures, buildings, and utilities that are classified as real property, and Army Training and Evaluation Center non-real properties, unless otherwise stated in this contract, to include installed building equipment as defined in Army Regulation (AR) 420-1, Army Facilities Management. The following is a list of Common Level of Services (CLS) that will be included in this acquisition: CLS Service Title 404 Grounds Maintenance 408 Pavement Clearance 411 Facility Maintenance - Vertical 420 Facility Maintenance - Horizontal 501 Heating and Cooling Services 503 Wastewater Services Update as of 11 MAY 2026: The Government is working through Source Selection processes. Please continue to monitor Sam.gov for further updates. __________________________________________________ Update as of APR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of MAR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _______________________________________________________ Update as of 26 FEB 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ________________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 2 DEC 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 15 SEP 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of AUG 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 10 JUL 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 18 JUN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 7 APR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 6 MAR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 17 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 DEC 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 26 NOV 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 5 Nov 2024: The Source Selection Evaluation Board is still in progress. _______________________________________________________________ Update as of 5 Aug 2024: The Government is reviewing proposals and conducting Preaward Debriefs. _______________________________________________________________ Update 17 June 2024: Amendment 0002 is attached along with responses to questions submitted by industry, updated attachments, and updates to Section L. ________________________________________________________________ Update 24 MAY 2024: Amendment 0001 is attached along with responses to questions submitted by industry, updated technical exhibits, and attachments. _________________________________________________________________ Update 23 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 28 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov. Currently the Government is projecting the solicition due date as being 28 June 2024. _______________________________________________________________ Update 15 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 20 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov. | 65% | Solicitation | 06/28/2024 |
______________________________________________ NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT a Solicitation nor a SOURCES SOUGHT ANNOUNCEMENT. Today’s Date: 24 NOV 2025 RE: Strategic Communication Plan with Industry Base operations support services at Fort Leonard Wood and Lake of the Ozarks Army Recreation Area (LORA).The anticipated date for the issuance of a potential draft solicitation is: 16 JAN 2026. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A Solicitation nor a SOURCES SOUGHT ANNOUNCEMENT. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A Solicitation nor a SOURCES SOUGHT ANNOUNCEMENT. Special Notice of a change in the Solicitation number. Today’s Date: 18 NOV 2025 RE: Strategic Communication Plan with Industry Fort Leonard Wood BASOPS Update: Former/Previous solicitation number: W5168W25RA006 New solicitation number for Fiscal Year 2026: W5168W26RA011 – use the new solicitation number when making inquiries, all updates will be posted using the new solicitation number. The anticipated date for the issuance of a potential draft solicitation is: To be Determined, the government will update SAM.GOV when appropriate. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A Solicitation nor a SOURCES SOUGHT ANNOUNCEMENT. _________________________________________________________________________________________ NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. Today’s Date: 9 SEP 2025 RE: Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: The anticipated date for the issuance of a potential draft solicitation is: 5 NOV 2025 NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. End............................................................................................................................ NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. Today’s Date: 7 AUG 2025 RE: Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: The anticipated date for the issuance of a potential draft solicitation is: 22 OCT 2025 End...................................................................................................................................................................... NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. Today’s Date: 23 JUL 2025 RE: Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: The anticipated date for the issuance of a potential solicitation is: 8 OCT 2025 End...................................................................................................................................................................... NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. 3 JUL 2025 Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: The anticipated date for the issuance of a potential solicitation is: 6 AUG 2025 End……………………………………………………………………………………. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. ……………………………………………………………………………………………….. 2 JUN 2025 Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: No updates available at this time. End…………………………………………………………………………………………. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. …………………………………………………………………………………………………... NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. 3 MAY 2025 Strategic Communication Plan with Industry W5168W25RA006, Fort Leonard Wood BASOPS Update: The anticipated date for the issuance of a potential solicitation is: 17 JUL 2025 End……………………………………………………………………………………. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. ……………………………………………………………………………………………….. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. …………………………………………………………………………………………………... Strategic Communication Plan with Industry Update April 2, 2025 Notice for W5168W25RA006 The date for the potential issuance of a solicitation is: 2 JUL 2025 End………………………………………………….. ………………………………………………………………………………………………….. NOTICE: THERE IS NO REQUIREMENT OR NEED TO RESPOND TO THIS ANNOUNCEMENT, THIS IS NOT A SOURCES SOUGHT ANNOUNCEMENT. …………………………………………………………………………………………………... Notice for W5168W25RA006 The anticipated issuance of a solicitation is June 2, 2025. Contractors shall provide all services, materials, supplies, plant, supervision, labor and equipment, except as specified as Government furnished, to operate, maintain, repair, and construct real property facilities and appurtenant structures at FLW, Missouri and the Lake of the Ozarks Army Recreation Area (LORA). The size standard is $47,000,000.00 United States Dollars. This is a recurring requirement consisting of twelve (12) functional task areas to provide Base Operations Support Services (BASOPS) for the Department of Public Works (DPW) at Fort Leonard Wood (FLW) and Lake of the Ozarks recreation area (LORA, 50 miles from FLW). FLW and LORA as combined locations will be referred to as FLW (in the state of Missouri). The BASOPS sought includes, but is not limited to, maintenance and service of mechanical, electrical, heating, air conditioning, mass notification systems, operation and service of utility plants and water treatment systems. BASOPS also includes ground maintenance, self-help services, pest control, kennels, fuel handling, environmental, and special events support. The FLW facilities are used for multiple training missions by all members of joint forces in the United States military, which includes international allied partners. The potential awardee/contractor shall ensure that all work meets critical reliability rates or tolerances specified in the quality assurance surveillance plan when performing the BASOPS functional areas including but not limited to work management, utility plants/systems, road work, and grounds maintenance. | 65% | Special Notice | Open |
Additional Details
Solicitation Number
W912HN23R5001
Archive Date
Aug 20, 2024
Office Address
SAVANNAH, GA, 31401-3604