GovChime

Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

Overview

Response deadline
12:00 PM UTC−04:00
Posted
July 31, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST SAVANNAH
Place of performance
Beaufort, SC
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HN24B5004
Notice ID
65aedbd993064285982f16e2129efaf0

Description

The abstract is posted as of 31 July 2024. Amendment 4 amends the specifications and extends the date bids are due from 24 July 2024 at 12:00 pm to 25 July 2024 at 1200 pm. Amendment 3 amends specifications and drawings. Amendment 0002 extends the date bids are due from 17 July 2024 at 12:00 pm to 24 July 2024 at 12:00 pm. Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HN24B5004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMay 23, 2024

    Savannah Harbor Expansion (SHEP) 14A Dike Raising and Weir

    Notice c332f924bbec452d948000645e3b89cc on SAM.gov

  2. 10×
    SolicitationCurrentJun 6, 2024

    Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

    Notice 65aedbd993064285982f16e2129efaf0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912HN24B5004

Archive Date

Jul 18, 2025

Office Address

SAVANNAH, GA, 31401-3604