GovChime
Notice ID: b83339cd467c4d649d07ad252272257bSolicitation

FY24 Beneficial Use Sediment Rehandling At Breach Inlet AIWW Dredging, Charleston, South Carolina

Archived on February 10, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
February 1, 2024
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST CHARLESTON
Place of performance
Charleston, SC, 29403
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HP24B0002
Notice ID
b83339cd467c4d649d07ad252272257b

Description

PROJECT TITLE: FY24 Beneficial Use Sediment Rehandling At Breach Inlet AIWW Dredging, Charleston, South Carolina DESCRIPTION OF WORK: The work consists of maintenance dredging approximately 757,000 cubic yards of unclassified material from Placement Areas 1110S W-C, 1088S W-C, 1056S W-C, and 1028S W-C which shall be placed at Sullivan?s Island and Isle of Palms beaches. The work is located in Charleston County, South Carolina. The work includes final grading of the sites and complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. This Solicitation is hereby posted and is active as of 28 November 2023. The purpose of this Amendment is to provide a contact to retrieve Survey Data files and extend the Bid Date. See summary of changes in Amendment 0001. Amendment 0001 is hereby posted and is active as of 19 December 2023. The purpose of this Amendment is to update the WEBEX date, See summary of changes in Amendment 0002. Amendment 0002 is hereby posted and is active as of 20 December 2023. The purpose of this Amendment it to extend the due date to 31 January 2024. Amendment 0003 is hereby posted an active as of 16 January 2024. Bid Opening Abstract and Bid Opening Attendee List is now posted as of 1 Feburary 2024.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HP24B0002
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationNov 14, 2023

    FY24 AIWW Beneficial Use Sediment Rehandling at Breach Inlet

    Notice 76d4bf48d70d446c84858d34ecd227d7 on SAM.gov

  2. 6×
    SolicitationCurrentNov 28, 2023

    FY24 Beneficial Use Sediment Rehandling At Breach Inlet AIWW Dredging, Charleston, South Carolina

    Notice b83339cd467c4d649d07ad252272257b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The work consists of placing 65,000 cubic yards (in-place) of unclassified material from the Little River Inlet to re-establish the Upcoast Sand Dike and Berm at the jetty key-in. The federal channel shall be used for the borrow source of material, as indicated in the contract drawings and specifications. The work is located in Horry County, South Carolina. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. MAGNITUDE OF WORK: $1,000,000 TO $5,000,000NThe contractor must be registered in WWW.SAM.GOV prior to award of the solicitation.
81%
Pre-Solicitation02/20/2026
This Award notice is posted as of 28 July 2026. Award was made to The Dutra Group.
77%
AwardedOpen
THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION W912BU26BA004 IS TO INCORPORATE THE FOLLOWING CHANGES:A.) PROVIDE ANSWERS TO THE RFIS SUBMITTED.B.) EXTEND BID OPENING FROM 30 MARCH 2026 TO 2 APRIL 2026 AT 2:00 PM EDT.C.) UPDATE FAR PROVISION 52.252-3, ALTERATIONS IN SOLICITATIOND.) REVISE CLIN 0002 DESCRIPTION FROM: REMOVAL AND SATISFACTORY DISPOSALAS#1 THROUGH AS#3 TO: REMOVAL AND SATISFACTORY DISPOSAL AS#1 AND AS#2.PURPOSE: The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract for Absecon Inlet (Clam Creek) Maintenance Dredging. DESCRIPTION: Contract work consists of Maintenance Dredging of the Absecon Inlet federal channel, Clam Creek portion to a depth of 14 ft MLLW plus 1 ft allowable overdepth. Dredging operations will clear approximately 61,640 cubic yards of fine-sand and silty sediment from Station 0+000 at the entrance to Station 2+500. Beneficial-use placement of the dredged channel sediments will be accomplished at designated locations on Boot Island. Optional work includes containment measures such as a compact track loader, turbidity curtains, coir logs, weirs and hay bales at the placement site. Work must occur between 15 September and 31 December due to environmental restrictions. Contractor will be required to use the Resident Management System (RMS). The successful Contractor must demonstrate satisfactory experience in completing at least 2 dredging projects involving beneficial use placement techniques such as marsh restoration and habitat creation on environmentally sensitive coastal marshes and wetlands. The satisfactory projects must have been completed within the last 10 years. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $1,000,000 and $5,000,000. NAICS CODE AND SBA SIZE STANDARD: 237990, DREDGING AND SURFACE CLEANUP ACTIVITIES, Size Standard $37.0M. PERIOD OF PERFORMANCE: 270 Calendar Days from the Notice to Proceed (NTP).SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
77%
Solicitation04/02/2026
Special Announcement - Industry Day 2026 - Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material The U.S. Army Corps of Engineers Philadelphia District would like to invite dredging industry contractors to Industry Day 2026 for the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project. Project Authorization: The Delaware River, Philadelphia to the Sea deep draft navigation project was originally authorized in House Document (HD) 61-733 as modified by HD 71-304, River and Harbors Committee Document 73-5, Senate Document 75-159, HD 76-580, HD 77-340, HD 83-358 and HD 85-135, and provides for a 45 FEET deep Federal channel in the Delaware River, from the entrance of Delaware Bay to the Ben Franklin Bridge in Philadelphia. In order to meet the goals of the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project (Delaware Bayshore), the dredged sand would be beneficially used as beach nourishment along two or more of the following Delaware Bayshore towns of Pickering Beach, Kitts Hummock, Bowers Beach, and Slaughter Beach IAW Section 401 of the Water Resources Development Act (WRDA) 2020 and as generally described in the Chiefs Report dated March 2020 and approved by the chief of Engineers on 6 March 2020. Federal funds for the DPS Project were provided in the Consolidated Appropriations Act of 2024 to initiate design and construction of the Project under Section 204(d) of WRDA 1992 as authorized by Section 8327 of WRDA 2022. This proposed project is intended to be done in conjunction with routine maintenance dredging between January of 2027 and May of 2028, subject to the availability of funds to advertise and award a dredging contract before the end of Fiscal Year (FY) 2027. The event will be held 15 September, 2026 at 10:00 am at the Slaughter Beach, DE Firehouse located at 359 Bay Ave, Milford DE 19963. The purpose and focus of the event will be to seek dredging industry input and their questions regarding best practices for the technical execution of the placement of sandy dredged material from the Brandywine Range of the Delaware River, Philadelphia to Sea Deep Draft Navigation Project main channel onto 2 or more of the Delaware Bayshore communities indicated above. Material in the channel has been characterized as predominately sand, based on the historic vibracore sampling and testing to a depth of -50 feet MLLW, and past dredging events to at least -45 feet MLLW depths. Work is in a dynamic coastal environment with shallow water extending for several miles from these communities out into the Delaware Bay. The meeting will allow for attendees to have the opportunity to ask questions and provide feedback or concerns. All interested attendees must pre-register by sending an e-mail to Contract Specialist Eric Leach at Eric.A.Leach@usace.army.mil no later than September 7, 2025. Registration must include name, company, daytime telephone number, e-mail address, and your relation to the marine construction industry as reason for attendance. You are requested to provide a count of how many people (from each registered Contractor) will be in attendance. Telephone requests will not be accepted. This is a non-fee event. This announcement is not a contract solicitation, request for proposal of any sort, a promise to issue any future contract, a forum to discuss upcoming work (other than for the Delaware River, Philadelphia to Sea Beneficial Use of Dredged Material Project), or a commitment to offer work of any kind on the part of the Government. Contracting Office Address: US Army Engineer District, Philadelphia, Attn: CECT-NAP, 1650 Arch Street, Philadelphia, PA 19103 SEE THE ATTACHMENTS SECTION FOR DRAFT SPECIFICATIONS AND DRAFT DRAWINGS.
76%
Special Notice09/07/2026
DESCRIPTION OF WORK: The work consists of maintenance dredging of approximately 4,287,000 cubic yards (BASE), and 350,000 cy (OPTION) of unclassified material from the Charleston Lower Harbor which shall be deposited in the Charleston Ocean Dredged Material Disposal Site (ODMDS). The work is located in Charleston and Berkeley Counties, South Carolina. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. MAGNITUDE OF WORK is estimated between $25,000,000 TO $40,000,000. North American Industry Classification System (NAICS) Code: 237990 Other Heavy and Civil Engineering Construction with an SBA Small Business Size of $37,000,000. The Solicitation is hereby posted as of 11 June 2026. Amendment 01 is hereby posted as of 30 June 2026. Amendment 02 is hereby posted as of 9 July 2026. Amendment 03 is hereby posted as of 9 July 2025. Amendment 04 is hereby posted as of 10 July 2025.
76%
Solicitation07/14/2026

Additional Details

Solicitation Number

W912HP24B0002

Archive Date

Feb 10, 2024

Office Address

CHARLESTON, SC, 29403-5107