GovChime
Notice ID: 42ac0e37d6454abb85c61fa83ac240c8Solicitation

FY24 Construction of Lake Marion Orangeburg Berkeley Reach Water Line Phase 1

Archived on November 26, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−05:00
Posted
November 27, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST CHARLESTON
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HP24R0001
Notice ID
42ac0e37d6454abb85c61fa83ac240c8

Description

DESCRIPTION OF WORK: The Orangeburg-Berkeley Reach Phase 1 Water Main contract consists of the furnishing, installing, and placing into successful operation approximately 36,250 LF of 20-inch diameter water main pipe, 5,010 LF of 26-inch diameter horizontal directionally drilled pipe, 2 booster pump stations, and all associated work. The contract includes all pipe, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety, and all other related work required to place the project into successful operation. This contract w ill be a portion of the Lake Marion Regional Water System with portions owned, operated, and maintained by both Santee Cooper, Berkeley County, and Orangeburg County. The Contractor w ill be responsible for coordinating work with local utility owners, property owners, Lake Marion Water Treatment Plant personnel, Berkeley County, and Orangeburg County. MAGNITUDE OF WORK: $20,000,000 to $25,000,000The North American Industry Classification System Code (NAICS) is: 237110 Water and Sewer Line Related. This solicitation is hereby posted and active as of 11 October 2023. AMENDMENT 0001 - The purpose of this amendment is to extend the proposal due date and update data see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 16 October 2023. AMENDMENT 0002 - The purpose of this amendment is to extend the proposal due date - see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 07 November 2023. Amendment 0003 - The purpose of this amendment provide additional documents see Summary of Changes on the Amendment This Amendment is hereby posted and active as 21 November 2023. AMENDMENT 0004 - The purpose of this amendment is to extend the proposal due date see Summary of Changes on the Amendment. This Amendment is hereby posted and active as 27 November 2023.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HP24R0001
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentOct 11, 2023

    FY24 Construction of Lake Marion Orangeburg Berkeley Reach Water Line Phase 1

    Notice 42ac0e37d6454abb85c61fa83ac240c8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
FY26 Medical University of South Carolina (MUSC) Stormwater Pump Station - DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line Related THIS ACQUISITION IS UNRESTRICTED. This solicitation is hereby posted as of 7 August 2026. Amendment 0002 - Extension of proposal due date to 11 September 2026 and is hereby posted as of 20 August 2026.This admin update is just to correct the date and time in PIEE. Amendment 0004 is posted to provide Site Visit Sign-in Sheet and updated Specs and Drawings see Addendum 01, this Amendment is hereby post as of 4 September 2026.
-Solicitation09/11/2026
This is a SOURCES SOUGHT notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to conduct market research to identify potential qualified Small Business sources (including 8(a), HUBZone, Service-Disabled Veteran-Owned, and Women-Owned Small Businesses) capable of performing the construction services described below.The U.S. Army Corps of Engineers, Charleston District, is seeking capability statements from interested firms to determine the availability and technical capability of the small business community to support a firm fixed-price contract for the FY26 MUSC Pump Upfit project.
-Market Research07/30/2026
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT.PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line and related Structures Construction with an SBA Small Business Size of $45,000,000
-Pre-SolicitationOpen
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.
-AwardedOpen
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025
-Solicitation11/24/2025

Additional Details

Solicitation Number

W912HP24R0001

Archive Date

Nov 26, 2024

Office Address

CHARLESTON, SC, 29403-5107