GovChime
Notice ID: 248f3933143b49a6985d5c4f222b941fAward NoticeAwarded

FY26 Lake Marion Cameron Reach Water Lines

Awarded on January 12, 2026. Full description on SAM.gov.

Awarded tounder W912HP26CA002 (source: SAM.gov award notice)• $16.5M

Overview

Posted
January 12, 2026
Notice type
Award Notice
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH ATLANTIC.ENDIST CHARLESTON.W074 ENDIST CHARLESTON
Place of performance
Charleston, South Carolina, 29403
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Jan 12, 2026
Award amount (SAM.gov award notice)
$16.5M

Identifiers

Solicitation number
W912HP26RA003
Notice ID
248f3933143b49a6985d5c4f222b941f
Award number (PIID)
W912HP26CA002

Description

THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025. This award was made to Chandler Construction in the amount of $16,471,000.00 and is hereby posted on 1.12.2026.

Full description on SAM.gov

Award Overview

Award Number

W912HP26CA002

Award Amount (SAM.gov award notice)

$16.5M

Award Date

Jan 12, 2026

Awardee

Awardee UEI

C87FBZZ9D341

Awardee CAGE Code

0M045

Awardee Address

1511 NINETY SIX HWY, Ninety Six, SC 29666, UNITED STATES

Original Solicitation

Notice ID: 248f3933143b49a6985d5c4f222b941f

Posted Date: Jan 12, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W912HP24C0008
    CHANDLER CONSTRUCTION SERVICES, INC.
    Department of DefenseNAICS 237110
    $23.3MSigned Nov 17, 2025
  • W912HP24C0002
    CHANDLER CONSTRUCTION SERVICES, INC.
    Department of DefenseNAICS 237110
    $20.3MSigned Sep 17, 2025
  • W912HP24C0008
    CHANDLER CONSTRUCTION SERVICES, INC.
    Department of DefenseNAICS 237110
    $23.3MSigned Aug 11, 2025
  • W912HP24C0008
    CHANDLER CONSTRUCTION SERVICES, INC.
    Department of DefenseNAICS 237110
    $23.3MSigned Jul 24, 2025
  • W912HP24C0002
    CHANDLER CONSTRUCTION SERVICES, INC.
    Department of DefenseNAICS 237110
    $20.3MSigned Jul 17, 2025

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Solicitation

    FY26 Lake Marion Cameron Reach Water Lines

    Notice 448e1e4a87b3467dbe8d8e0b69ea2a56 on SAM.gov

  2. 2
    Version 2Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    FY26 Lake Marion Cameron Reach Water Lines

    Notice 248f3933143b49a6985d5c4f222b941f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025
100%
Solicitation11/24/2025
This Request for Quote (RFQ) is for the contractor shall provide all materials, equipment, and labor to replace approximately 810 lineal feet of 2? HDPE water line and tie into existing underground gatevalves at point 1 and point 3 at Cagles Mill Lake located in Poland, IN. All work shall be performed in strict compliance with the attached specifications and all other terms, clauses, and conditions incorporated herein. Quotes are due on 9 July 2026 at 10:00 AM Eastern Time.NOTE: THIS RFQ IS 100% SET ASIDE FOR SMALL BUSINESS. The NAICS code for this procurement is 237110. The size standard is $45M.The solicitation will be available on the web only. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can view, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities. Amendments will be available from the beta.sam.gov website by download only. Prior to submission of quotes all contractors must have an active registration in the System for Award Management (SAM) database. To register or update information go to http://www.SAM.gov. Questions may be addressed to adyson.medley@usace.army.mil. This announcement serves as the advance notice.
84%
Solicitation07/14/2026
FY26 Medical University of South Carolina (MUSC) Stormwater Pump Station - DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line Related THIS ACQUISITION IS UNRESTRICTED. This solicitation is hereby posted as of 7 August 2026. Amendment 0002 - Extension of proposal due date to 11 September 2026 and is hereby posted as of 20 August 2026.This admin update is just to correct the date and time in PIEE. Amendment 0004 is posted to provide Site Visit Sign-in Sheet and updated Specs and Drawings see Addendum 01, this Amendment is hereby post as of 4 September 2026.
81%
Solicitation09/11/2026
This is a SOURCES SOUGHT notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to conduct market research to identify potential qualified Small Business sources (including 8(a), HUBZone, Service-Disabled Veteran-Owned, and Women-Owned Small Businesses) capable of performing the construction services described below.The U.S. Army Corps of Engineers, Charleston District, is seeking capability statements from interested firms to determine the availability and technical capability of the small business community to support a firm fixed-price contract for the FY26 MUSC Pump Upfit project.
81%
Market Research07/30/2026
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT.PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line and related Structures Construction with an SBA Small Business Size of $45,000,000
81%
Pre-SolicitationOpen

Additional Details

Solicitation Number

W912HP26RA003

Archive Date

Jan 12, 2027

Office Address