Notice ID: eba53fbdbb624f5486351b000a305504Award NoticeAwarded
RENOVATE BECHTEL ELEMENTARY SCHOOL, Camp McTureous, Okinawa, Japan
Awarded on August 30, 2023. Full description on SAM.gov.
Awarded tounder W912HV23C0012 (source: SAM.gov award notice)• $126.2M
Overview
- Posted
- August 30, 2023
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of War
Notice details
- Place of performance
- JP-47
- Last updated
- Dec 4, 2025
- Award date
- Aug 30, 2023
- Award amount (SAM.gov award notice)
- $126.2M
Identifiers
- Solicitation number
- W912HV22R0013
- Notice ID
- eba53fbdbb624f5486351b000a305504
- Award number (PIID)
- W912HV23C0012
Description
The purpose of this Amendment is to provide Government Responses to Contractor Requests for Information (RFI) and to release amended specifications. The proposal due date and time of 11:00AM local time on 23 February 2023 remains unchanged. See SF30 Bechtel AM-0002, Bechtel ES_AM-0002_CLIN Schedule, Bechtel ES_AM-0002_Specifications.
Award Overview
Award Number
W912HV23C0012
Award Amount (SAM.gov award notice)
$126.2M
Award Date
Aug 30, 2023
Awardee
Awardee UEI
KCBEA56F6375
Original Solicitation
Notice ID: eba53fbdbb624f5486351b000a305504
Posted Date: Aug 30, 2023
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $128.3MSigned Jul 28, 2026
- $127.9MSigned Apr 28, 2026
- —Signed Mar 13, 2026
- —Signed Jan 20, 2026
- —Signed Nov 11, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912HV22R0013- Solicitation
- Awarded
This opportunity has been awarded.
- 5×SolicitationSep 21, 2022
RENOVATE BECHTEL ELEMENTARY SCHOOL, Camp McTureous, Okinawa, Japan
- AwardedCurrentAug 30, 2023
RENOVATE BECHTEL ELEMENTARY SCHOOL, Camp McTureous, Okinawa, Japan
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
SOURCES SOUGHT / MARKET RESEARCH NOTICE INTERIOR FINISH BRAND NAME OR EQUAL PRODUCT DESCRIPTIONS Project Title: P530 Aircraft Intermediate Maintenance Facility Project Location: Kadena Air Base, Okinawa, Japan Procuring Agency: U.S. Army Corps of Engineers (USACE), Japan District Anticipated Solicitation Number: W912HV27BA005 Associated Sources Sought Reference: W912HV26Z0007 1. GENERAL INFORMATION & PURPOSE The U.S. Army Corps of Engineers, Japan District (POJ), is conducting market research to assess industry capabilities, market availability, and potential equivalent products regarding interior finishes specified for the upcoming construction project: P530 Aircraft Intermediate Maintenance Facility at Kadena Air Base, Okinawa, Japan. The Government intends to include brand-name-or-equal product descriptions for certain interior finishes within the planned solicitation (W912HV27BA005). Any required Brand Name Justification will be posted with the solicitation in accordance with the Revolutionary FAR Overhaul (RFO) Class Deviation FAR 6.301 (Availability of the Justification). This notice is issued strictly for market research and planning purposes to determine whether competitive Japanese domestic or international equivalent products exist that meet the Government’s salient functional, aesthetic, and performance requirements. 2. PROJECT DESCRIPTION This project entails the construction of a multistory intermediate-level (I-Level) aircraft maintenance facility to provide organic flightline maintenance support for the Aircraft Intermediate Maintenance Detachment (AIMD) at Kadena Air Base, Okinawa, Japan. For general scope context, refer to the draft specifications and drawings previously published under Sources Sought Notification W912HV26Z0007. 3. ELIGIBILITY / LICENSING REQUIREMENTS In accordance with U.S.-Japan bilateral agreements and USACE Japan District policy, competition will be limited to local sources licensed and qualified to perform construction work in Japan pursuant to the Japanese Construction Business Act (Kensetsu-gyo Ho). 4. SPECIFIC FEEDBACK REQUESTED Interested sources and licensed contractors are requested to review Drawing Sheet A-701, "Interior Finish Schedule" (attached), and provide feedback regarding: a. Availability & Lead Times: Are the specified brand-name finish products readily available through established distribution networks within Japan and Okinawa? Are there anticipated supply chain disruptions or excessive lead times? b. Equivalent Products: Do comparable Japanese domestic or international products exist that satisfy the salient physical, chemical, and aesthetic characteristics of the specified items? If so, please provide manufacturer names, model numbers, product literature, and compliance with applicable Japanese Industrial Standards (JIS). c. Cost & Commercial Practices: Would the use of the specified brand names unnecessarily restrict competition or cause disproportionate cost increases compared to standard commercial alternatives available in Japan? 5. SUBMISSION INSTRUCTIONS Interested sources are invited to submit written responses and capability feedback via email to: • Contract Specialist: William House (William.e.house@usace.army.mil) • Contracting Officer: Erica Stiner (erica.j.stiner@usace.army.mil) Responses must be received no later than 2:00 p.m. Japan Standard Time (JST) on 30 October 2026. Please include "Feedback: W912HV27BA005 - P530 AIMD Interior Finishes" in the email subject line. 6. DISCLAIMER This Sources Sought notice is for informational and planning purposes only and shall not be construed as a solicitation, Invitation for Bids (IFB), Request for Proposals (RFP), or as an obligation on the part of the U.S. Government. The Government does not intend to award a contract on the basis of this notice, nor will it reimburse respondents for any costs incurred in preparing responses. | - | Market Research | 10/30/2026 |
| - | Special Notice | 11/30/2026 | |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), in support of U.S. Army Materiel Command (AMC), IMCOM Directorate – Sustainment, and USAG Fort Belvoir, has a requirement for the design and construction of a project to restore and modernize Building 1809 located at 6020 30th Engineer Road, Fort Belvoir, Fairfax County, Virginia (22060-5200). The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional, modernized, and code-compliant administrative and general-purpose storage facility on the Installation. Building 1809 was placed in service on July 24, 1961, and has exceeded its original 40-year estimated useful life. The asset is a single-story (1 floor above ground, 0 floors below ground, 20 feet in height), semi-permanent concrete structure (Construction Material Code: CONC; Structure Code: S20; Roof Code: R11; Wall Code: W25) comprising a total of 26,247 Square Feet (SF) with a design capacity of 76 persons (PN). The facility is configured for dual-purpose operations: Administrative Building, General Purpose (Category Code 61050): 16,014.61 SF (Design Capacity: 76 PN), supporting Air Force / U.S. Special Operations Command (AFELM US SOCOM, UIC: FFDY01). Storage Building, General Purpose, Installation (Category Code 44220): 10,232.66 SF, supporting USAG Fort Belvoir (UIC: W4VNAA). Despite a 100% utilization rate and a Mission Critical (Readiness Tier T1) designation, the facility currently holds a Current Use Functionality Capability Code of F3, indicating a significant requirement for restoration and modernization funds to make the asset capable of meeting the function for which it is used. Furthermore, the asset holds a Facility Physical Quality Code of Q4 (Physical Quality Rating: 57), meaning the sum of all necessary restoration and modernization costs is greater than 40 percent of the Plant Replacement Value (PRV). Summary of Building 1809 Real Property & Facility Parameters: Facility Parameter Specification / Status Facility Building 1809 Location 6020 30th Engineer Road, Fort Belvoir, Fairfax County, VA 22060-5200 Date Placed in Service July 24, 1961 (Original 40-year estimated useful life exceeded) Structure & Dimensions Single-story semi-permanent concrete (CONC / S20 / R11 / W25); 20 ft height Total Gross Area & Capacity 26,247.27 SF total (16,014.61 SF Admin; 10,232.66 SF Storage) | 76 PN Readiness & Condition Codes Mission Critical (Tier T1) | Functionality: F3 | Physical Quality: Q4 (Rating: 57) Key facility deficiencies and modernization requirements include: Fire Protection & Life Safety: The building is currently classified under Facility Fire Rating Code 1 (Unsprinklered Combustible). Comprehensive fire suppression and life safety upgrades are required to meet current UFC and NFPA codes. HVAC & Mechanical Systems: While the building is serviced by water, sewer, electrical, and telephone utilities, it currently lacks air conditioning (Air Conditioning: N). Modernized HVAC and climate control systems are required to support administrative personnel and storage preservation. Accessibility & Sustainability: The facility has not yet been evaluated for ADA compliance (Code: NEVL) or Sustainability (Code: 3 – Not Yet Evaluated). Full architectural, structural, mechanical, electrical, and plumbing (MEP) modernization is needed to achieve code compliance, energy efficiency, and operational resilience. Historic Status: Determined Not Eligible for Listing (DNE, evaluated January 7, 2016). Metering: There are currently no utility metering records associated with this asset; smart utility metering integration will be required. Estimated Acquisition Magnitude: $10-12M PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. Currently, the Government is evaluating conceptual requirements for the following facility modernization features: Installation of modern automatic fire suppression (sprinkler) and mass notification systems to eliminate unsprinklered combustible hazards. Complete mechanical/HVAC installation to provide full air conditioning, ventilation, and climate control across the 16,014.61 SF administrative space and 10,232.66 SF storage space. Building envelope rehabilitation (roofing, walls, structural concrete repairs) and interior reconfiguration to meet ADA accessibility and modern sustainability standards. Utility infrastructure upgrades, including advanced metering and electrical/communications modernization to support Mission Critical (T1) operations. The most recent physical existence inspection was conducted on August 28, 2023. The Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB via an OT Agreement under the authority of 10 U.S.C. § 2808a. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. The PDB Course of Action (10 U.S.C. § 2808a): The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. Most highly qualified firm following pitch meetings would be selected to enter into negotiations. The OT Award would be two phases: Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CMAR), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Belvoir Building 1809 Restoration & Modernization Q12. Describe your experience/expertise with the comprehensive restoration, modernization, and MEP/fire-suppression retrofit of aging (1960s-era) military administrative and storage facilities. Q13. What are the greatest supply chain, scheduling, phasing, or technical risks you foresee on a project of this type at Fort Belvoir (particularly regarding mission continuity for T1 Mission Critical users, adding HVAC/sprinklers to an existing concrete structure, and addressing Q4 physical quality deficiencies), and how could the PDB delivery method help mitigate them? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches (e.g. swing space vs. phased occupied renovation), or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/U5ifrFVD5s or via the QR Code provided in the attachment. Please submit your responses by 20 November 2026 at 1000 Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | - | Market Research | 11/24/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to repair, restore, and modernize Building 410 – the General Stilwell Army Reserve Center (ARC) – a failing two-story, 144,360 SF Command and Control / training facility, along with Non-Organizational (POV) parking and supporting utilities, located at Fort Hood, Texas. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional, code-compliant, and modernized facility that extends the economic life of the building by 25 years and enables mission readiness for the assigned Army Reserve units. Building 410 was constructed in November 1985 and provides mission-essential functional areas in support of six Legal Detachments, a Training Brigade, Transportation Company, Civil Affairs Brigade, Human Resources Company Headquarters, a Public Affairs Detachment, and the Reserve Personnel Action Center. The mechanical, plumbing, and electrical systems are beyond their serviceable life. A technical assessment has confirmed widespread facility deterioration. Key facility deficiencies include: • Roof membrane system has exceeded useful life and is past warranty; exterior doors, windows, and storefronts require replacement; interior finishes (walls, flooring, acoustical ceilings) are failing. • HVAC systems (rooftop units, air handlers, boilers, pumps, piping, radiation units, controls, and exhaust fans) are in failing condition or original to the building. • Electrical infrastructure is original, fully loaded 1600A main panel with no capacity for additional loads; insufficient outlets creating safety hazards; distribution panels and wiring require modernization. • Plumbing fixtures and sanitary piping require code upgrades; hot water heater is undersized. • Telecommunications infrastructure (Category 5/6 cabling) is unreliable and does not comply with current Army Reserve Network Enterprise Center (ARNEC), TIA-607, or UFC 3-580-01 standards; no Primary or Secondary Bonding Busbars. • No fire sprinkler system; bathrooms do not meet ADA standards; facility lacks an elevator; telecommunication spaces are undersized. • Hazardous materials (asbestos and lead-based paint) identified throughout the facility requiring abatement. SCOPE: The project repairs and restores Building 410 by addressing widespread facility deterioration and returning the structure to a fully functional, code-compliant training facility. Work includes comprehensive repairs to failing electrical, plumbing, and heating, ventilation, and air conditioning (HVAC) systems, along with full rehabilitation of the building envelope, including roof replacement. The facility will be brought up to Americans with Disabilities Act (ADA) standards. The project will demolish and abate all failing components and hazardous materials. Asbestos, mold, lead-based paint, biohazard, or other hazardous materials will be handled, stored, and disposed of in accordance with current laws and regulations. Supporting work includes Non-Organizational Vehicle Parking and Supporting Utilities improvements. Other methods of meeting this requirement were analyzed, including building demolition and new construction; however, these were deemed unviable due to the cost of repair versus the cost of demolition and new construction. The repair of this facility is more cost effective than replacement. Estimated Acquisition Magnitude: $90,000,000 PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The PDB Course of Action (10 U.S.C. § 2808a): This path allows USACE to execute a construction project where the Construction Firm is brought in during the design. The Louisville District anticipates onboarding the collaborative partner at an appropriate design maturity to maximize value. Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Hood Building 410 Repair & Modernization: Q12. Describe your experience/expertise with large-scale repair, renovation, and modernization of military, federal, or institutional buildings—particularly multi-story administrative, training, or command-and-control facilities. Include experience with hazardous material abatement (asbestos, lead-based paint), major mechanical/electrical/plumbing systems replacement, building envelope and roof rehabilitation, ADA upgrades, fire/life safety improvements, and telecommunications infrastructure modernization to current UFC/ARNEC standards. Q13. What are the greatest supply chain, scheduling, technical, and/or operational risks you foresee on a project of this type at Fort Hood, Texas (including potential constraints of an occupied or partially occupied facility, swing space coordination, mission continuity for Army Reserve units, or Texas climate/weather impacts), and how could the PDB delivery method help mitigate those risks? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery experience, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/rU5Rsi9Qmg or via the QR Code provided in the attachment. Please submit your responses by 20 November 2026 at 1000 Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | - | Market Research | 11/24/2026 |
UPDATE 01 - Solicitation amendment 01 (updates solicitation closing date, and period of performance) - Contractor Access Form is attached - Note that CLIN 0003 work is an option END OF UPDATE 01 ***************************** The 179th Cyberspace Wing, Mansfield Ohio ANG Contracting Office is issuing this Solicitation notice for Project No's: PBXP 272018 – B422 Breakroom, and PBXP 272019 - B300 BDOC. Bids will be evaluated in accordance with RFO FAR 14.306. Bids will be evaluated without discussions. Award will be made in accordance with RFO FAR 14.307(b). This project is solicited as SET ASIDE FOR SMALL BUSINESSES, 100%. All responsible bidders are encouraged to participate. The North American Industry Classification (NAICS) Code is 236220, with a size standard of $45,000,000 average annual revenue for the previous three (3) years. The magnitude is between $0.00 and $150,000.00. See Sec 00 21 00 - Instructions, for pertinent details and instructions related to site visit. Interested contractors are highly encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. The bid opening date is currently scheduled for 10 December 2026, at 1:00pm (EST). Please ensure Request for Information template/outline is utitilized for all questions related to this project; template is located within Section 00 21 00 - Instructions. Interested bidders shall be registered in System for Award Management (SAM). To register go to: https://www.sam.gov. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only through Contract Opportunities located within SAM.gov website online at https://www.sam.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. The project site is located at the 179th Cyberspace Wing,Mansfield, Ohio 44903. Any questions should be emailed to the following:Gordon Strom, gordon.strom.1@us.af.mil. DISCLAIMER: The official plans and specifications are located on the official government web page and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to https://www.beta.sam.gov for electronic downloading. This will normally be theonly method of distributing amendments prior to closing; therefore, it is the bidder’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons.The Government is not responsible for any loss of Internet connectivity or for a bidders’ inability to access the documents posted on the referenced web pages.The Government will not issue paper copies. | - | Solicitation | 12/10/2026 |
Additional Details
Solicitation Number
W912HV22R0013
Archive Date
Sep 30, 2023
Place of Performance Country
JPN
Office Address
APO, AP, 96338-5010