GovChime
Notice ID: 5a19c1df78884a77b7e04f9c7223ad96Award NoticeAwardedArchived

GIWW Corpus Christi Bay to Port Isabel and Channel toHarlingen Pipeline Dredging, Nueces, Kleberg, Kenedy, Willacy, and Cameron Counties, Texas

Awarded on July 7, 2026. Full description on SAM.gov.

Awarded tounder W912HY26CA023 (source: SAM.gov award notice)• $18.4M

Overview

Posted
August 3, 2026
Notice type
Award Notice
Set-aside
No Set aside used
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W076 ENDIST GALVESTON
Place of performance
Kenedy
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Jul 7, 2026
Award amount (SAM.gov award notice)
$18.4M

Identifiers

Solicitation number
W912HY26BA016
Notice ID
5a19c1df78884a77b7e04f9c7223ad96
Award number (PIID)
W912HY26CA023

Description

THIS SOLICITATION IS BEING ISSUED AS AN UNRESTRICTED PROCUREMENT FOR FY26 USACE GALVESTON DISTRICT, GULF INTRACOASTAL WATERWAY, CORPUS CHRISTI BAY TO PORT ISABEL W/ CHANNEL TO HARLINGEN, PIPELINE DREDGING, NUECES, KLEBERG, KENEDY, WILLACY, AND CAMERON COUNTIES, TEXAS.

Bid Abstract-5/22/2026

Full description on SAM.gov

Award Overview

Award Number

W912HY26CA023

Award Amount (SAM.gov award notice)

$18.4M

Award Date

Jul 7, 2026

Awardee

Awardee UEI

NPJLGH6HJDD5

Awardee CAGE Code

093F7

Original Solicitation

Notice ID: 5a19c1df78884a77b7e04f9c7223ad96

Posted Date: Aug 3, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W9127826FA032
    INLAND DREDGING COMPANY, L.L.C.
    Department of DefenseNAICS 237990
    $4.1MSigned Aug 14, 2026
  • W9127826FA144
    INLAND DREDGING COMPANY, L.L.C.
    Department of DefenseNAICS 237990
    —Signed Aug 13, 2026
  • W912HY26CA004
    INLAND DREDGING COMPANY, L.L.C.
    Department of DefenseNAICS 237990
    $10.2MSigned Aug 13, 2026
  • W912HY26FA044
    INLAND DREDGING COMPANY, L.L.C.
    Department of DefenseNAICS 237990
    $3.0KSigned Aug 3, 2026
  • W912HY26DA025
    INLAND DREDGING COMPANY, L.L.C.
    Department of DefenseNAICS 237990
    —Signed Aug 3, 2026

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationDEPT OF THE ARMYAug 3, 2026561.47 KB

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    GIWW Corpus Christi Bay to Port Isabel and Channel toHarlingen Pipeline Dredging, Nueces, Kleberg, Kenedy, Willacy, and Cameron Counties, Texas

    Notice 5a19c1df78884a77b7e04f9c7223ad96 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SOURCES SOUGHT SYNOPSIS TITLE: FY27 Texas City Ship Channel, Texas Main Channel and Turning Basin Notice Type: SOURCES SOUGHT SYNOPSIS Source Sought Number: W912HY27X1CT1 Response Date (10 days): November 07, 2026 The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS ANNOUNCEMENT SEEKS INFORMATION FROM INDUSTRY, WHICH WILL BE USED FOR PRELIMINARY PLANNING PURPOSES. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. RESPONDENTS WILL NOT BE NOTIFIED OF THE RESULTS OF THE EVALUATION. The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) and Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition of responsible firms. Project Information: FY26 Texas City Ship Channel (TCSC) Main Channel and Turning Basin Maintenance Dredging. The scope of this contract is to perform maintenance dredging with a pipeline or hopper dredge of the Texas City Ship Channel Main Channel and Main Turning Basin. Contractor may be familiar with the traffic conditions in the TCSC. Contractor may provide experience as a prime contractor dredging deep draft navigation channels utilizing a pipeline or mechanical dredge and be able to provide production rates. The completion time of the work is 240 calendar days. The estimated construction price range for this project is: Between $10,000,000 and $25,000,000. All construction performance must comply with the USACE Safety and Health Requirements Manual (EM 385-1-1, and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations. The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 million. The Product Service Code is Z1KB. Small Businesses are reminded under FAR 52.219-14, (Deviation 2021-O0008), Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85% subcontract amount that cannot be exceeded. Prior Government contract work is not required for submitting a response to this announcement. Contractor may demonstrate any construction experience as a prime contractor working on Dredged Material Placement Areas. Bonding Requirements: Performance and Payment Bonds are required within 5 calendar days after award, and the contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the estimated amount of $4,328.00 for each calendar day of delay until the work is completed or accepted. FIRMS RESPONSE SHALL INCLUDE THE FOLLOWING INFORMATION: 1. Unique Entity Identifier (UEI) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ). 2. Name of firm w/ address, phone, fax, e-mail address, and point of contact. 3. Indicate whether your firm will submit a bid for this project if set-aside for Small Business (SB), 8(a) Small Business Development Program, Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran Owned Small Business (SDVOSB), Economically Disadvantaged (ED/Woman Owned (WO), Woman Owned (WO) Woman-Owned Small Business (WOSB). 4. Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable. Qualifications: Responses to this source sought announcement shall indicate specialized experience and technical competence in: a. Demonstrate experience in completing work outlined under the paragraph above for “Project Information.” Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above or comparable work performed within the past 5 years): Brief description of each project, customer name, and dollar value of the project)– provide at least 3 examples. Firm’s Bonding Capacity (Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount) bonding level per contract and aggregate construction bonding level, both expressed in dollars. Firms responding to this announcement, who fail to provide ALL required information requested and outlined above, may be excluded from further consideration in the review and analysis for acquisition strategy determination. Anticipated solicitation issuance date is on or about June 2027, and the estimated proposal/bid due date will be on or about July 2027. Estimated award on or about date is August 2027. The official synopsis citing the solicitation number will be issued on Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil/ inviting firms to register electronically to receive a copy of the solicitation when it is issued. Interested Firm’s shall respond to this announcement no later than, November 07, 2026 at 10:00 AM (CDT). All interested firms must be registered in SAM.gov to be eligible for award of Government contracts. Email your response to Ms. Sarah Eisele at Sarah.M.Eisele@usace.army.mil and Jeremy Babb at Jeremy.Babb@usace.army.mil
-Market Research11/07/2026
W912PM27RA006 The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC) requires a contract to provide maintenance dredging for the Galveston District. The U.S. Army Corps of Engineers, EDDC is planning to issue a firm fixed price (FFP), Scope-Dredge-to-Budget (SDtB) contract to provide maintenance dredging for Galveston District channels with disposal of material at Dredged Material Placement Areas (DMPA), Ocean Dredged Material Disposal Sites (ODMDS), beneficial use site locations and ocean disposal within the Galveston District. The project will encompass Houston Ship Channel, Galveston Harbor and Channel, Texas City Ship Channel, Freeport Harbor Channel, Corpus Christi Ship Channel, Brazos Island Harbor Channel, and Matagorda Ship Channel located in Texas. This solicitation is unrestricted. The contract issued will be Firm Fixed Price. This solicitation will be issued in electronic format only and will be available on or about 19 November 2026. The bid opening date will be specified in the solicitation when it is issued. No additional media (CD-ROM, floppy disks, facsimiles, etc.) will be provided. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. The North American Industry Classification System (NAICS) code is 237990 – Other Heavy and Civil Engineering Construction and the size standard is $37,000,000.00. Offerors must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from any Government solicitation. Call 1-866-606-8220 for more information or visit the SAM website at www.sam.gov. After completing SAM, in order to download documents contractors and their subcontractors must register at www.sam.gov. In order to locate solicitation, Contractors can go to www. sam.gov and search for the solicitation number. Contractors can register to be put on a plan holders list that others can access through the www.sam.gov website. It is the Offeror's responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. For additional information or assistance, please contact Terri Adams, Contract Specialist, email terri.m.adams@usace.army.mil or Rosalind Shoemaker, Contracting Officer, phone (910) 251-4436, email rosalind.m.shoemaker@usace.army.mil.
-Pre-Solicitation11/19/2026
Dashboard link: https://geo-essayons.egis.usace.army.mil/portal/apps/experiencebuilder/experience/?id=1b5c149b77d04afa8aa97160476258d4 DRAFT RFP ADDED Special Notice: W912PM27RA006 Title: Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center Scope Dredge to Budget The Virtual Industry Day Meeting for the USACE Enterprise Dredge Delivery Center Scope Dredge to Budget will occur on 16 October 2026 from 0900ET to 13:00ET via Teams. All interested dredging companies are encouraged to attend. During the meeting, we will be discussing Scope Dredge to Budget acquisition strategy. Scope Dredge to Budget: Optimize the Budget in terms of quality, scope, durability with innovative betterments and betterments within the budget. The goal of the scope-dredge to budget is maximizing achievable scope within a target budget that will be provided in the solicitation. The Enterprise Dredge Delivery Center intends to issue 1 solicitation for the Galveston/Houston Area of Responsibility. Phase One -A technical qualifications-based evaluation of initial proposals -RFP that defines the project with functional and performance requirements, budget cap, and schedule/delivery requirements -A statement of the maximum number of offerors that will be selected to submit Phase 2 proposals. -RFO FAR 36.101-2(b)(4) states maximum number of offerors shall not exceed five (5) Phase One proposals from vendors do not include: -Detailed design information -Cost or price information Down-select Decision for most highly qualified offerors in accordance with the solicitation. Proposed Phase 1 Qualifications -Proof of bonding capacity -Past Performance -Proposed Plant Proprietary Meetings (RFO FAR 15.101 Exchanges with Industry before receipt of proposals) Phase Two in accordance with FAR 15 Source Selection Procedures to determine best value. Official Phase Two RFP issued by amendment for most highly qualified offerors to submit phase-two competitive proposals that include technical proposals and cost or price information. Proposed Phase 2 Evaluation Factors -Maximum amount of time to maintain the channels at authorized dimensions -Maximum use of beneficial use -Schedule -Management Approach The harbors to be dredged include the Sabine-Neches Waterway, Galveston Harbor & Channel, Houston Ship Channel, Texas City Ship Channel, Freeport Harbor, Matagorda Ship Channel, Corpus Christi Ship Channel, Brazos Island Harbor, Gulf Intracoastal Waterway & Tributaries, Channel to Victoria, and Channel to Harlington. See Attachment 1 for project descriptions and map. Please RSVP no later than 10AM ET 15 October 2026 to both Ros Shoemaker and Terri Adams at Rosalind.m.shoemaker@usace.army.mil and terri.m.adams@usace.army.mil if you plan to attend the Industry Day. A Teams calendar invite will be sent out to all RSVP’s. Industry is also encouraged to provide any feedback on the proposed acquisition strategies or contract pairings. Feedback can be provided via email to the contracting officer and contract specialist listed above. If you would like to provide any questions in advance of the meeting, please provide them no later than 10AM ET, 08 September 2026. There will also be a face-to-face meeting with individual contractors that have the required equipment and intend to propose on this future solicitation. The face-to-face meetings will be on 03-04 November in Galveston, TX. Please respond to to both Ros Shoemaker and Terri Adams at Rosalind.m.shoemaker@usace.army.mil and terri.m.adams@usace.army.mil of your interest in a face-to-face meeting no later than 24 September 2026 at 1PM ET.
-Special Notice11/09/2026
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING Amendment 0001
-Solicitation11/10/2026
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
-Solicitation11/03/2026

Additional Details

Solicitation Number

W912HY26BA016

Archive Date

Aug 21, 2026

Office Address

GALVESTON, TX, 77550-1229