FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
Archived on February 19, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM CST
- Posted
- January 20, 2026
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.ENDIST GALVESTON.W076 ENDIST GALVESTON
- Place of performance
- Texas, 78597
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912HY26X1B38
- Notice ID
- 153c06c654c24ddcb37d5c148fdfa10f
Description
The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.
Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.
Placement Area: Near Shore Feeder Berm 1A/1B
Options 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.
Option 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.
Option 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded.
Dredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.
Period of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
Attachment 1 - Sources Sought Notice_BIH_W912HY26X1B38_20 Jan 2026.pdf
114 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
- 6Version 6PresolicitationArchived
Type changed from Sources Sought to Presolicitation
FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Brazos Island Harbor Entrance and Jetty Channels Maintenance Dredging, Cameron County, Texas Amendment 0002 | 97% | Solicitation | 08/03/2026 |
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING Amendment 0001 | 93% | Solicitation | 11/10/2026 |
THIS IS AN UNRESTRICTED SOLICITATION FOR HOUSTON SHIP CHANNEL, TEXAS, REDFISH TO MORGANS POINT, HOPPER DREDGING, IN HARRIS, CHAMBERS AND GALVESTON COUNTIES, TEXAS IN HARRIS, CHAMBERS AND GALVESTON COUNTIES, TEXAS | 88% | Solicitation | 02/24/2026 |
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging | 83% | Solicitation | 11/03/2026 |
The primary objective of Package #8 Segment 4 East E2 Clinton (E2C) consists of constructing an upland dredged material confined placement area (DMPA) to receive maintenance dredging material from future dredging Project 11 - Segment 4, located within the Houston Ship Channel near the Washburn Tunnel Crossing in Houston, Texas.The specific items in the scope of work include clearing, grubbing and stripping; grading; construction of outfall channels, drainage channels, perimeter ditching and other drainage features; perimeter embankment construction; drop outlet structure construction; erosion control measures; site security measures; geotechnical construction testing; topographic surveys before the start of construction, and during and after construction activities; placement of topsoil, and hydromulch seeding; demobilization and site cleanup; and related ancillary work. | 83% | Solicitation | 01/08/2026 |
Additional Details
Solicitation Number
W912HY26X1B38
Archive Date
Feb 19, 2026
Office Address
GALVESTON, TX, 77550-1229