Notice ID: 66b411bf9282b7e5ee4266323264dd19Award NoticeAwarded
Y--Construct Alert Crew Quarters for the 117th Air Refueling Wing, Birmingham ANG, Alabama
Awarded on November 3, 2009. Full description on SAM.gov.
Awarded tounder W912JA-09-C-0017_P0001 (source: SAM.gov award notice)• $1.2M
Overview
- Posted
- November 5, 2009
- Notice type
- Award Notice
- NAICS
- 236210: Industrial Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7MT USPFO ACTIVITY AL ARNG
- Place of performance
- USPFO for Alabama P.O. Box 3715, Montgomery AL 36109-0715 US
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Nov 3, 2009
- Award amount (SAM.gov award notice)
- $1.2M
Identifiers
- Solicitation number
- W912JA09B0005
- Notice ID
- 66b411bf9282b7e5ee4266323264dd19
- Award number (PIID)
- W912JA-09-C-0017_P0001
Description
Construct new facility to meet LEED Silver Certification in accordance with plans and specifications. NOTE: Awardee is moving office to Miami, FL - office phone is 305-620-8747
Award Overview
Award Number
W912JA-09-C-0017_P0001
Award Amount (SAM.gov award notice)
$1.2M
Award Date
Nov 3, 2009
Awardee
Original Solicitation
Notice ID: 66b411bf9282b7e5ee4266323264dd19
Posted Date: Nov 5, 2009
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Tonja Nummy, 334-271-7334 USPFO for Alabama
Documents
No documents available.
Lifecycle
Solicitation:
W912JA09B0005- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationAug 24, 2009
Y--Construct KC-135 Alert Crew Quarters, 117th Air Refueling Wing ANG, Birmingham IAP ANG, Birmingham, AL
- SolicitationSep 23, 2009
Y--Construct KC-135 Alert Crew Quarters, 117th Air Refueling Wing ANG, Birmingham IAP ANG, Birmingham, AL
- AwardedCurrentNov 5, 2009
Y--Construct Alert Crew Quarters for the 117th Air Refueling Wing, Birmingham ANG, Alabama
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
USACE - Rock Island District has awarded contract W912EK26CA030 from solicitation W912EK26BA016. | 66% | Awarded | Open |
09/09/2026 The bids were opened and read timely for this IFB today. The verified signed Bid Abstract is available below in the downloads section. 9/2/2026 Subject IFB is amended. All bidder inquiries received timely have been answered in ProjNet as described in MVR.02 QUESTION AND ANSWER VIA PROJNET paragraph of SF 1442. NO CHANGE TO DUE DATE and TIME for bid submission. See attached amendment (SF 30) and revised specifications (it is just a single PDF with both). The original IFB (SF 1442) and its attachments are still located in the original notice use link near bottom left of PIEE Solicitation module page to open that original notice and see those files. USACE - Rock Island District has a requirement to Construct a Tactical Operation Center (TOC) Pad at 88th USARC in Arlington Heights, IL. This is a competitive 8(a) set aside Invitation for Bid. Please download all three files to complete your solicitation package prior to reviewing and submitting bids for this. All bids MUST BE SUBMITTED in PIEE. This requires a PIEE account if your company does not already have one you will need to do that. The work includes, but is not limited to, excavation and storage of spoils, demolition and installation of electrical power distribution, directional boring of telecom lines, and installation and leveling of gravel. | 66% | Solicitation | 09/09/2026 |
The U.S. Army Corps of Engineers (USACE) issues this special notice to announce an upcoming competition for a design and construction solicitation for F35 Composite Repair and Training Facility / F35 Maintenance Facility issued under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. The U.S. Army Corps of Engineers intends to conduct an Industry Day on 17 November 2026 at 1:00 PM Pacific Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the anticipated Progressive Design-Build (PDB) or Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the Program Solicitation. This Industry Day will be conducted virtually, please use the following link, https://forms.osi.apps.mil/Pages/ResponsePage.aspx?id=unZN_HzxUEy5p48xY9J1gi8JCtDtBtdNhw_4_id_LMZUMzVXWTFTU0tCRUwxVVAwVlhUWlJXNFpRUi4u, to sign up to attend this industry day by 12 November 2026 4:00PM Pacific Time. Virtual link will be provided two days prior to the Virtual event. Project Overview Project Title: F-35 Composite Repair and Training Facility / F3-5 Maintenance Facility Location: HAFB, UT Agency: USACE, District Sacramento (SPK) NAICS Code: 236210 – Industrial Building Construction Total Program Funding: F-35 Composite Repair and Training Facility - $157,886,000 and F-35 Maintenance Facility - $213,716,000.00 Project Description F-35 Composite Repair and Training Facility: Construct a medium bay F-35 training facility for personnel assigned to repair composite components for F-35 fighter aircraft. There will also be an attached, medium-bay industrial facility to perform the composite repairs. The scope of the repair area includes a covered loading dock, clean rooms, cryogenic tanks, walk-in freezer, overhead cranes, offices, break areas, restrooms, and conference rooms. The training area will be operationally separated from the repair area. The scope of the training area includes clean rooms, sanding areas, autoclave areas, virtual spray booth rooms, spray paint booths, soldering labs, classrooms, testing center, administration area, conference rooms, instructor's offices, and a common area including restrooms and a break room. The construction will consist of reinforced concrete footings, foundation, floor slab, structural steel frame, insulated masonry walls, and insulated roof. Sensitive Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. The immediate area surrounding the anechoic chambers and the associated security office has been determined to be a SAPF level security area and will require ICD 705 protection. The project will include heating, ventilation, air conditioning, industrial ventilation, compressed air, emergency back-up power generators, intrusion detection, fire detection/suppression, utilities, site improvements, communication support, and all other interior and exterior features for a complete and usable F-35 composite repair and training facility. Generators are authorized in accordance with Air Force Manual 32-1062, Electrical Systems, Power Plants, and Generators. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. F-35 Maintenance Facility: Construct a multi-dock medium bay fighter aircraft maintenance hangar with parts storage/equipment areas, back shop, and administrative areas. Project scope includes composite aircraft corrosion control capability to include one paint bay and one de-paint bay. The proposed facility will have reinforced concrete footings, foundation, floor slab, structural steel frame, insulated walls, insulated roof, lightning protection, fire detection/suppression, and intrusion detection. The project will include pavements, site improvements, communication support, utilities and all required supporting facilities for a complete and usable facility to fulfill mission requirements. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Acquisition Strategy (Pre-Award) The USACE will use a streamlined competitive selection process: Step 1 –White Papers: Interested parties will submit a Statement of Qualifications. The government intends to down-select up to three Companies to proceed to Step 2. Step 2 – Pitches: Selected Companies will participate in pitch meetings. One company will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award. Award The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes Design and Pre-construction services and Post-award Phase 2 includes the final design and construction. Key Security Requirements General Requirement and Authority Required Level: The Government has determined that this project requires a Cybersecurity Maturity Model Certification (CMMC) Status of Level 1 (Self-Assessment). Performance under the resulting Agreement will require the handling of Federal Contract Information (FCI). Interested parties must have achieved a Final Level 1 (Self-Assessment) Status and, at the time of award, affirm completion of the required self-assessment and attestation. All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Program Solicitation. | 63% | Special Notice | 11/12/2026 |
1. GENERAL INFORMATIONThe U.S. Army Corps of Engineers, Sacramento District (USACE SPK), intends to solicit proposals for a Single Award Task Order Contract (SATOC) to support the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This notice is issued for planning and information purposes only and does not constitute a solicitation.The SATOC will be structured as a four (4) phase phased SATOC, with task order execution sequenced to align with operational constraints, funding availability, and mission continuity requirements. The SATOC will have an ordering period of 1,825 calendar days (five (5) years) from the date of contract award. The first task order awarded under the SATOC will satisfy the minimum guarantee.This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bids (IFB), or a promise to issue solicitation in the future. This notice does not commit the Government to contract for any supply or service whatsoever. The information provided in this notice is subject to change and is not binding on the Government.2. SCOPE OF WORK (OVERVIEW)The SATOC will support design-bid-build construction task orders for renovation and modernization of plating shop facilities, including but not limited to Buildings 505 and 507 and associated infrastructure at HAFB. Anticipated work includes:? Demolition and replacement of existing plating line tanks and process equipment? Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines? Installation of chemical distribution and storage systems? Mechanical, electrical, and control system upgrades supporting plating operations? Ventilation, air quality management, and environmental control systems? Fire suppression and life safety system upgrades? Structural modifications to support new process equipment? Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment? Utility upgrades including process piping, compressed air, gases, power distribution, and controls? Phased construction to ensure continuous mission operations during renovation? Compliance with environmental, safety, and regulatory requirements applicable to plating operationsIndividual task orders may vary in size, complexity, and duration. Task orders are expected to range from $2,500 to $40 million, with multiple task orders issued over the life of the contract.3. TECHNICAL COMPLEXITY AND RISKThe work involves highly specialized industrial construction within an active operational environment. Successful performance requires demonstrated experience with:? Industrial process facility renovation? Plating shop or similar hazardous material process environments? Precision installation and alignment of tanks and process equipment? Integration of mechanical, electrical, instrumentation, and control systems? Phased construction in occupied facilities? Coordination with facility operators to maintain uninterrupted operations4. PROCUREMENT STRATEGYUSACE SPK anticipates awarding one (1) SATOC under this solicitation. The SATOC will be a pre-priced contract, with pricing established at the base contract level and applied to future task orders.The SATOC will be structured as a four (4) phase phased contract, and work will be executed through the issuance of firm-fixed-price task orders (TOs) aligned with each phase. Individual task orders are anticipated to have a maximum value not to exceed approximately $50,000,000 per task order, consistent with phased execution, operational risk management, and bonding considerations. Each phase may be executed through the issuance of one or more task orders aligned with defined scope, sequencing, and operational constraints.Task orders will be issued to the SATOC awardee only. The first task order awarded under the SATOC will satisfy the minimum guarantee.The procurement will utilize best-value tradeoff procedures in accordance with FAR Part 15. Evaluation factors are anticipated to include, but are not limited to Factor 1 ? Past Performance? Relevancy Scale. ? Highly Relevant: greater than or equal to $25M contract value or scope/scale clearly comparable to this requirement (multi-trade integration in an operational industrial facility).? Relevant: $10M?$25M with comparable core systems/risks.? Somewhat Relevant: less than $10M or limited specialty systems but shows transferable complexity.(Projects of lesser value can still be credited if they clearly reflect comparable scope/complexity.)Factor 2 ? Technical and Management ApproachFactor 3 ? Network Analysis Schedule (NAS)Factor 4 ? Small Business Participation Commitment Document (Goals: SB 23%; SDB 5%; WOSB 5%; HUBZone 3%; SDVOSB 3%.)PRICING: The SATOC pricing will be pre-priced within the separate line items of the schedule. This ensures that all proposals for this SATOC are using competitive procedures to provide the Government with their price for line items 1 - 6 Line item 7 reflects the stated capacity. This SATOC has a one-thousand twenty-five (1,825) calendar day ordering period which equates to approximately five (5) years. Price reasonableness will be established through evaluation of the pre-priced SATOC, Price List Description Estimated Amount0001 Plating Shop Renovation - PHASE 1 $0002 Plating Shop Renovation - PHASE 2 $0003 Plating Shop Renovation - PHASE 3 $0004 Plating Shop Renovation - PHASE 4 $0005 Chemical Addition Systems $0006 Contaminated Soil Disposal up to $1,500 CY $0007 Construction Activities ? any other work needed will be a negotiated under this CLIN. Specification/Drawings/Design Package for DBB will be provided with a Request for Task Order Proposal. The Capacity for this ELIN is $TBD Capacity is $40MThe Government anticipates issuing a Request for Proposals (RFP) following completion of market research and acquisition planning.5. SMALL BUSINESS CONSIDERATIONSWhile this acquisition is anticipated to be solicited on a full and open basis, the Government strongly encourages participation by small businesses as subcontractors and suppliers. Offerors will be expected to demonstrate meaningful small business utilization consistent with FAR Part 19 goals. 6. MAGNITUDE OF CONSTRUCTIONBonding and Risk Management Clarification: Performance and payment bonds will be required at the individual task order level only, in accordance with FAR Part 28. Limiting individual task order values to approximately $50,000,000 per task order supports manageable bonding requirements, enhances price realism, and enables effective risk allocation for complex, phased industrial construction in an active operational environment.The total SATOC contract capacity is approximately $114,000,000 over the five (5) year ordering period. The SATOC capacity represents the cumulative ceiling for all task orders issued across the four (4) phases and does not reflect the value of any single task order.In accordance with FAR 236.204 (iii), the magnitude of construction for this project is estimated to be between $100,000,000 and $250,000,000.7. ANTICIPATED SOLICITATION INFORMATION? Solicitation Type: Request for Proposals (RFP)? Anticipated Solicitation Issue Date: March 2026? Anticipated Award Date: Aug 2026? Contract Duration: Five (5) years8. SITE VISIT / INDUSTRY ENGAGEMENTThe Government anticipates conducting a site visit following release of the solicitation. Details will be provided in the RFP.9. DISCLAIMERThis is a presolicitation notice and is issued for informational and planning purposes only. This is not a solicitation. This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bids (IFB), or a promise to issue solicitation in the future. This notice does not commit the Government to contract for any supply or service whatsoever. The information provided in this notice is subject to change and is not binding on the Government.10. Related Notices? Notice ID W9123825X19FL Plating Shop Renovation, Sources Sought and Project Labor Agreement Survey? Notice ID W9123825X19FL, Plating Shop Renovation Industry Day? Notice ID W9123825RA003, Plating Shop Solicitation? Notice ID W9123824R0032, Pre-solicitation Notice----------Amendment 0001 - Revise Section 00 20 00----------Amendment 0002 - Extend Proposal due date, Replace Drawings/Specs----------Amendment 0003 - Include ProjNet Bidder Inquiries/Government Response----------Amendment 0004 - Include an additional ProjNet Bidder Inquiry/Government Response in updated Attachment 24. | 63% | Solicitation | 06/11/2026 |
1. GENERAL INFORMATIONThe U.S. Army Corps of Engineers, Sacramento District (USACE SPK), intends to solicit proposals for a Single Award Task Order Contract (SATOC) to support the renovation, modernization, and phased replacement of plating shop facilities at Hill Air Force Base (HAFB), Utah. This notice is issued for planning and information purposes only and does not constitute a solicitation.The SATOC will be structured as a four (4) phase phased SATOC, with task order execution sequenced to align with operational constraints, funding availability, and mission continuity requirements. The SATOC will have an ordering period of 1,825 calendar days (five (5) years) from the date of contract award. The first task order awarded under the SATOC will satisfy the minimum guarantee.This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bids (IFB), or a promise to issue solicitation in the future. This notice does not commit the Government to contract for any supply or service whatsoever. The information provided in this notice is subject to change and is not binding on the Government.2. SCOPE OF WORK (OVERVIEW)The SATOC will support design-bid-build construction task orders for renovation and modernization of plating shop facilities, including but not limited to Buildings 505 and 507 and associated infrastructure at HAFB. Anticipated work includes:? Demolition and replacement of existing plating line tanks and process equipment? Installation and commissioning of new electroplating, anodizing, cleaning, stripping, and surface treatment process lines? Installation of chemical distribution and storage systems? Mechanical, electrical, and control system upgrades supporting plating operations? Ventilation, air quality management, and environmental control systems? Fire suppression and life safety system upgrades? Structural modifications to support new process equipment? Construction of a new approximately 2,800-square-foot Pre-Engineered Metal Building (PEMB) to house relocated ovens and supporting equipment? Utility upgrades including process piping, compressed air, gases, power distribution, and controls? Phased construction to ensure continuous mission operations during renovation? Compliance with environmental, safety, and regulatory requirements applicable to plating operationsIndividual task orders may vary in size, complexity, and duration. Task orders are expected to range from $2,500 to $40 million, with multiple task orders issued over the life of the contract.3. TECHNICAL COMPLEXITY AND RISKThe work involves highly specialized industrial construction within an active operational environment. Successful performance requires demonstrated experience with:? Industrial process facility renovation? Plating shop or similar hazardous material process environments? Precision installation and alignment of tanks and process equipment? Integration of mechanical, electrical, instrumentation, and control systems? Phased construction in occupied facilities? Coordination with facility operators to maintain uninterrupted operations4. PROCUREMENT STRATEGYUSACE SPK anticipates awarding one (1) SATOC under this solicitation. The SATOC will be a pre-priced contract, with pricing established at the base contract level and applied to future task orders.The SATOC will be structured as a four (4) phase phased contract, and work will be executed through the issuance of firm-fixed-price task orders (TOs) aligned with each phase. Individual task orders are anticipated to have a maximum value not to exceed approximately $50,000,000 per task order, consistent with phased execution, operational risk management, and bonding considerations. Each phase may be executed through the issuance of one or more task orders aligned with defined scope, sequencing, and operational constraints.Task orders will be issued to the SATOC awardee only. The first task order awarded under the SATOC will satisfy the minimum guarantee.The procurement will utilize best-value tradeoff procedures in accordance with FAR Part 15. Evaluation factors are anticipated to include, but are not limited to Factor 1 ? Past Performance? Relevancy Scale. ? Highly Relevant: greater than or equal to $25M contract value or scope/scale clearly comparable to this requirement (multi-trade integration in an operational industrial facility).? Relevant: $10M?$25M with comparable core systems/risks.? Somewhat Relevant: less than $10M or limited specialty systems but shows transferable complexity.(Projects of lesser value can still be credited if they clearly reflect comparable scope/complexity.)Factor 2 ? Technical and Management ApproachFactor 3 ? Network Analysis Schedule (NAS)Factor 4 ? Small Business Participation Commitment Document (Goals: SB 23%; SDB 5%; WOSB 5%; HUBZone 3%; SDVOSB 3%.)PRICING: The SATOC pricing will be pre-priced within the separate line items of the schedule. This ensures that all proposals for this SATOC are using competitive procedures to provide the Government with their price for line items 1 - 6 Line item 7 reflects the stated capacity. This SATOC has a one-thousand twenty-five (1,825) calendar day ordering period which equates to approximately five (5) years. Price reasonableness will be established through evaluation of the pre-priced SATOC, Price List Description Estimated Amount0001 Plating Shop Renovation - PHASE 1 $0002 Plating Shop Renovation - PHASE 2 $0003 Plating Shop Renovation - PHASE 3 $0004 Plating Shop Renovation - PHASE 4 $0005 Chemical Addition Systems $0006 Contaminated Soil Disposal up to $1,500 CY $0007 Construction Activities ? any other work needed will be a negotiated under this CLIN. Specification/Drawings/Design Package for DBB will be provided with a Request for Task Order Proposal. The Capacity for this ELIN is $TBD Capacity is $40MThe Government anticipates issuing a Request for Proposals (RFP) following completion of market research and acquisition planning.5. SMALL BUSINESS CONSIDERATIONSWhile this acquisition is anticipated to be solicited on a full and open basis, the Government strongly encourages participation by small businesses as subcontractors and suppliers. Offerors will be expected to demonstrate meaningful small business utilization consistent with FAR Part 19 goals. 6. MAGNITUDE OF CONSTRUCTIONBonding and Risk Management Clarification: Performance and payment bonds will be required at the individual task order level only, in accordance with FAR Part 28. Limiting individual task order values to approximately $50,000,000 per task order supports manageable bonding requirements, enhances price realism, and enables effective risk allocation for complex, phased industrial construction in an active operational environment.The total SATOC contract capacity is approximately $114,000,000 over the five (5) year ordering period. The SATOC capacity represents the cumulative ceiling for all task orders issued across the four (4) phases and does not reflect the value of any single task order.In accordance with FAR 236.204 (iii), the magnitude of construction for this project is estimated to be between $100,000,000 and $250,000,000.7. ANTICIPATED SOLICITATION INFORMATION? Solicitation Type: Request for Proposals (RFP)? Anticipated Solicitation Issue Date: March 2026? Anticipated Award Date: Aug 2026? Contract Duration: Five (5) years8. SITE VISIT / INDUSTRY ENGAGEMENTThe Government anticipates conducting a site visit following release of the solicitation. Details will be provided in the RFP.9. DISCLAIMERThis is a presolicitation notice and is issued for informational and planning purposes only. This is not a solicitation. This notice does not constitute a Request for Proposal (RFP), Request for Quotation (RFQ), Invitation for Bids (IFB), or a promise to issue solicitation in the future. This notice does not commit the Government to contract for any supply or service whatsoever. The information provided in this notice is subject to change and is not binding on the Government.10. Related Notices? Notice ID W9123825X19FL Plating Shop Renovation, Sources Sought and Project Labor Agreement Survey? Notice ID W9123825X19FL, Plating Shop Renovation Industry Day? Notice ID W9123825RA003, Plating Shop Solicitation? Notice ID W9123824R0032, Pre-solicitation Notice | 63% | Pre-Solicitation | 03/20/2026 |
Additional Details
Solicitation Number
W912JA09B0005
Archive Date
Dec 5, 2009