RECOVERY--Z--PROJECT NUMBER FAKZ042000(A), Repair Roof Engine Shop, Bldg 1407
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- June 3, 2010
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7MT USPFO ACTIVITY ALANG 187
- Place of performance
- 187 FW/MSC 5187 Selma Highway, Montgomery AL 36108-4824 US
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W912JA10B0006
- Notice ID
- ebc844e4f1e0ca5249fa01eaa92f0f79
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): N/A Remove entire existing roof and drainage system on Building 1407 to include coping caps, vents, exhaust fans, gutters, downspouts and any other roof equipment necessary to install a 20-year NDL (No Dollar Limit) warranty. The new roof installed is to be a Modified Bitumen Roofing System. The Modified Bitumen Roofing System must adhere to the roof decking. The new roofing system is to include a new drainage system. The exterior drainage system should be installed with the gutters highest vertical section at least one inch below roof height. Provide overflow scuppers in parapets at a maximum height of two inches above the primary roof drains. This project will use new metal in reroofing work (i.e., cap flashing, edge metal, drains, etc.). All roof-mounted equipment will be reset to their original positions, so take care in their removal and storage. Damaged equipment will be replaced with equal materials at no additional cost to owner. It is to the benefit of the contractor to do a pre-construction inspection to note any damaged equipment prior to work beginning.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Dorothy W. Brown, (334) 394-7294 187 FW/MSC
Documents
No documents available.
Lifecycle
Solicitation:
W912JA10B0006- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 2, 2010
RECOVERY--Z--PROJECT NUMBER FAKZ042000(A), Repair Roof Engine Shop, Bldg 1407
- SolicitationCurrentJun 3, 2010
RECOVERY--Z--PROJECT NUMBER FAKZ042000(A), Repair Roof Engine Shop, Bldg 1407
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912JA10B0006
Archive Date
Aug 23, 2010