Notice ID: 1e871e5b675948fdb6d7c33c2c3f4487Award NoticeAwarded
Request for Proposal - W912P426RA020 - Barcelona West Breakwater
Awarded on September 22, 2026. Full description on SAM.gov.
Awarded tounder W912P423D0003 (source: SAM.gov award notice)• $7.3M
Description
Request for Proposal for Task Order - W912P426RA020 - Barcelona West Breakwater for Marine MATOC Contractors.
Overview
Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST BUFFALO.W072 ENDIST BUFFALO
Posted:September 22, 2026
NAICS:237990: Other Heavy and Civil Engineering Construction
Last Updated:Oct 21, 2026
First published:
Last updated on SAM.gov:
PSC:Y1PZ: CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set-Aside:Not specified
Type:Award Notice
Place of Performance:Not specified
Award Date:Sep 22, 2026
Award Amount (SAM.gov award notice):$7.3M
Award Overview
Award Number
W912P423D0003
Award Amount (SAM.gov award notice)
$7.3M
Award Date
Sep 22, 2026
Awardee
Awardee UEI
ZY58XKDQ4LD7
Awardee CAGE Code
1K2U9
Awardee Address
1800 LAKESHORE DR, MUSKEGON, MI 49441, UNITED STATES
Original Solicitation
Notice ID: 1e871e5b675948fdb6d7c33c2c3f4487
Posted Date: Sep 22, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Links (7)
- PIEE Solicitation Module Link for W912P426FA039piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Solicitation
Request for Proposal - W912P426RA020 - Barcelona West Breakwater
- 2Version 2Award NoticeCurrent
Type changed from Solicitation to Award Notice
Request for Proposal - W912P426RA020 - Barcelona West Breakwater
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | Solicitation | 237990 | No Set-Aside | 10/20/2026 | 10/21/2026 | Port Monmouth, NJ | |
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | Solicitation | 237990 | No Set-Aside | 10/20/2026 | 10/21/2026 | Port Monmouth, NJ | |
As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | Solicitation | 237990 | No Set-Aside | 10/19/2026 | 10/21/2026 | Port Monmouth, NJ | |
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | Solicitation | 237990 | No Set-Aside | 10/02/2026 | 10/19/2026 | Port Monmouth, NJ | |
As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | Solicitation | 237990 | No Set-Aside | 09/18/2026 | 10/19/2026 | Port Monmouth, NJ |
Additional Details
Solicitation Number
W912P426FA039
Archive Date
Sep 22, 2027
Office Address
BUFFALO, NY, 14202-0000