Request for Proposal - W912P426RA020 - Barcelona West Breakwater

Awarded on September 22, 2026. Full description on SAM.gov.

Awarded tounder W912P423D0003 (source: SAM.gov award notice)• $7.3M

Description

Request for Proposal for Task Order - W912P426RA020 - Barcelona West Breakwater for Marine MATOC Contractors.

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST BUFFALO.W072 ENDIST BUFFALO
Posted:September 22, 2026
NAICS:237990: Other Heavy and Civil Engineering Construction
Last Updated:Oct 21, 2026
First published:
Last updated on SAM.gov:
PSC:Y1PZ: CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set-Aside:Not specified
Type:Award Notice
Place of Performance:Not specified
Award Date:Sep 22, 2026
Award Amount (SAM.gov award notice):$7.3M

Award Overview

Award Number

W912P423D0003

Award Amount (SAM.gov award notice)

$7.3M

Award Date

Sep 22, 2026

Awardee

Awardee UEI

ZY58XKDQ4LD7

Awardee CAGE Code

1K2U9

Awardee Address

1800 LAKESHORE DR, MUSKEGON, MI 49441, UNITED STATES

Original Solicitation

Notice ID: 1e871e5b675948fdb6d7c33c2c3f4487

Posted Date: Sep 22, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Solicitation

    Request for Proposal - W912P426RA020 - Barcelona West Breakwater

    Notice 2326cf2d68334c6faf55539fda830159 on SAM.gov

  2. 2
    Version 2Award NoticeCurrent

    Type changed from Solicitation to Award Notice

    Request for Proposal - W912P426RA020 - Barcelona West Breakwater

    Notice 1e871e5b675948fdb6d7c33c2c3f4487 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Solicitation237990No Set-Aside10/20/202610/21/2026Port Monmouth, NJ
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Solicitation237990No Set-Aside10/20/202610/21/2026Port Monmouth, NJ
As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Solicitation237990No Set-Aside10/19/202610/21/2026Port Monmouth, NJ
As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Solicitation237990No Set-Aside10/02/202610/19/2026Port Monmouth, NJ
As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.
Solicitation237990No Set-Aside09/18/202610/19/2026Port Monmouth, NJ

Additional Details

Solicitation Number

W912P426FA039

Archive Date

Sep 22, 2027

Office Address

BUFFALO, NY, 14202-0000