Y--Opportunity to Review Draft Technical Plans and Specifications and Announcement of Industry Day with Site Visit - Center Hill Dam Safety Project - Auxiliary Dam Reinforcing Berm and Left Rim Stabilization

Archived on December 23, 2015. Full description on SAM.gov.

Overview

Posted
December 23, 2014
Notice type
Special Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST NASHVILLE
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912P514R0003
Notice ID
5fd5fc899c51cf9640f4180318be97ff

Description

December 23, 2014 Note: A list of the attendees from Industry Day has now been posted. If you wish to receive a copy of the Powerpoint Presentation from Industry Day, please provide an email to Heather Turner at heather.d.turner@usace.army.mil. NOTE: Please disregard attachments 'Draft Plans 5 of 6' and 'Draft Plans 6 of 6'. These are duplicate attachments. PROJECT TITLE: CENTER HILL DAM SAFETY PROJECT- Auxiliary Dam Reinforcing Berm and Left Rim Stabilization Solicitation Number: W912P5-14-R-0003 Agency: U.S. Army Corps of Engineers, Nashville District Subject: Opportunity to Review Draft Technical Plans and Specifications and Announcement of Industry Day with Site Visit. Purpose: In order to most effectively construct the final phase of the Center Hill Dam Safety Project, the Nashville District U.S. Army Corps of Engineers (USACE) is publishing the draft technical plans and specifications (Draft Documents) for the proposed construction of the Auxiliary Dam Reinforcing Berm and Left Rim Stabilization. Industry is encouraged to review the Draft Documents and submit questions and comments to the Government for further consideration. The Government is not responsible for any costs associated with: reviewing the Draft Documents, preparing and submitting comments, or participating in Industry Day. Furthermore, the Government is not obligated to compensate respondents for any information received, even if the Draft Documents are revised as a result of a respondent's comment or question. Respondents should refrain from providing proprietary information in response to this Notice because any information received by the Government will not be treated as proprietary information. Lastly, while the Government is seeking comments and questions concerning the draft technical plans and specifications, at this time the Government does not intend to publish such questions and comments and does not intend to publish the Government's responses or comments thereto. This notice is not a solicitation, nor should it be construed as a commitment by the Government, implied or otherwise, to issue a solicitation. This not a request for proposals and the Government will not accept unsolicited proposals for this project. General Project Description: The USACE requirement is a roller compacted concrete reinforcing berm (RCC Berm) downstream of the Center Hill Auxiliary Dam. The purpose is dam safety. The work consists of controlled blasting and excavation of foundation rock, consolidation grouting, and construction of the RCC Berm. The Berm foundation excavation is estimated at 50,000 CY and approximate maximum depth of excavation is 40 feet. Dental concrete and a concrete leveling pad will be accomplished prior to RCC construction. The RCC Berm is approximately 100 feet high and 1,000 feet long and contains about 130,000 CY of roller-compacted concrete. The scope of work also contains drilling, blasting, scaling and stabilization of rock slopes in the Left Rim just west of the main dam embankment. The work may also include stabilization of rock with rock bolts to reshape each side to a stable 1.5:1 slope. Rock bolts would be used where blasting methods are inadequate to stabilize individual large blocks of rock. Blasting methods may include presplit, production blasting, blast scaling and carefully controlled vibration criteria. Total excavated material is approximately 250,000 CY. This description is not intended to be all encompassing and is subject to change. Disclosure of the Magnitude of the Construction Project: The disclosure of magnitude range is between $25,000,000 and $100,000,000. Industry Day and Site Visit: An Industry Day event and site visit will be held on December 16, 2014 at 10:00 am CST at the Center Hill Resource Manager's Shop Conference Room. Contractors are encouraged to register for the conference and site visit by email or facsimile to the below listed Point of Contact (POC) by 4:00 pm CST on December 12, 2014. Please provide the name of the individual(s) planning to attend, the entity the individual(s) will be representing, and the contact information for the individual(s). The agenda for the Industry Day and site visit is generally as follows: 9:30 to 10:00 am: Registration 10:00 to 11:00 am: Presentation of General Scope of Work 11: 30 am to 1:30 pm: Construction Project Site Visit USACE encourages industry comments be submitted no later than January12, 2015. Any communications regarding this announcement must be made in writing via e-mail to the POC listed below. POC: Heather Turner, Contract Specialist, telephone: 615-736-7939, e-mail: Heather.D.Turner@usace.army.mil. Directions to the Industry Day and Site Visit: From North of Center Hill Lake: Travel I-40 to Exit 268; head south on Highway 96. Travel about 5 miles to the stop sign at the intersection of Highways 96 and 141 (Big Rock Market will be on the right, Edgar Evins State Park ahead). Turn right at the stop sign. About mile on the right, veer right at the quote mark Resource Manager's Office quote mark sign. Take the first road to the right. Pass the stone Resource Mgrs office on the right and continue through the gate. The SHOP Facility is the metal building on the right. Enter at the glass doors along the end. From South of Center Hill Lake: From TN State Highway 70, travel Highway 56 to I-40 and follow directions above OR take TN State Highway 96 north about 25 miles over Center Hill Dam. Take the first left on the north side of the dam, at the quote mark Resource Manager's Office quote mark sign. Take the first road to the right. Pass the stone Resource Mgrs office on the right and continue through the gate. The SHOP Facility is the metal building on the right. Enter at the glass doors along the end.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Heather D. Turner, 615-736-7939 USACE District, Nashville

Documents

No documents available.

Lifecycle

Solicitation:W912P514R0003
  1. 4×
    Special NoticeCurrentNov 25, 2014

    Y--Opportunity to Review Draft Technical Plans and Specifications and Announcement of Industry Day with Site Visit - Center Hill Dam Safety Project - Auxiliary Dam Reinforcing Berm and Left Rim Stabilization

    Notice 5fd5fc899c51cf9640f4180318be97ff on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This update provides the following: 1. Program slidedeck presented at general session. 2. Industry Day Attendance Sheet 10/28/2026. The U.S. Army Corps of Engineers, Mobile District, extends its appreciation to all industry partners who attended the recent Selma AL Flood Management Risk and Bank Industry Day. The Industry Day briefing charts and attendee list contain Controlled Unclassified Information (CUI).Access is restricted to verified U.S. DoD contractors. New interested parties wishing to obtain the briefing materials must contact the Contracting Office directly to verify eligibility and fulfill CUI access requirements.
69%
Special Notice12/11/2026
EVENT DETAILS: Date: 3 December 2026 Time: 0930-1430 PT Format: Presentation & Site walk Registration Due Date: 23 November 2026, 1200 PT; Please register by returning completed Request for Visit Authority (RVA) by email to: Sarah Malowicki, Project Manager, at sarah.m.malowicki@usace.army.mil, AND Londres Medranda, Contract Specialist, at londres.medranda@usace.army.mil. Confirmation email will be sent upon receipt of completed RVA. Who Should Attend: Interested vendors, including small businesses, large businesses, and other industry partners. Attendance is limited to 2 personnel per company. Attendance is limited to United States Citizens. Attendance at this event is not mandatory. Pre-registration is required. DESCRIPTION: In accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.101(a) Early exchanges with industry, the United States Army Corps of Engineers (USACE), Seattle District (NWS) is hosting an Industry Day on 3 December 2026 at Chief Joseph Dam in Bridgeport, Washington. This Industry Day provides an opportunity for interested parties to inspect the existing 15.5KV Main Unit XJ Breaker disconnects first-hand. By hosting this first-hand inspection, the government aims to gather technical feedback and explore industry alternatives for modernizing this equipment. We are seeking input from qualified, experienced sources, capable of performing this modernization work. PROJECT BACKGROUND: At Chief Joseph Dam the current Unit 1-16 XJ Breaker disconnects are original BBC (Brown Boveri Corporation) equipment and rated 6000A according to the BBC shop drawings. The switch operators are pneumatically driven, and are actuated by operation of a complex key interlocking scheme with the circuit breaker. The load side and source side disconnects are mechanically linked and simultaneously operated by a single shared pneumatic actuating system. The current Units 17-27 breaker disconnects are original GE equipment. The load side and source side disconnects are mechanically linked and simultaneously controlled by mechanically operated hand crank. USACE is evaluating options to improve reliability, maintainability, remote-operating capability, and overall generating-unit availability. • Option 1: Refurbish and restore existing disconnect switches to an approved condition equivalent to original design intent, as technically feasible. Integrate motorized mechanisms on the switch arms to enable remote operation, and comprehensively overhaul and test the existing main unit breakers to ensure optimal system protection. • Option 2: Replace the disconnect switches with new electrically operated units and refurbish the existing breakers. • Option 3: Replace both the disconnect switches (with new electrically operated units) and the main unit circuit breakers. • Option 4: Replace the entire switchgear assembly with new enclosures, modern electrically operated disconnect switches, and new circuit breakers (includes associated controls, protection, buswork and new enclosure). Chief Joseph Dam has several critical limitations that affect this project, primarily related to space constraints. This Industry day will present the options under consideration, obtain industry feedback on technical feasibility and constructability, and identify potential risks, constraints and cost drivers. USACE is requesting feedback on the following questions and relevant, non-binding information: Does your company have the ability, capacity, interest and willingness to perform the proposed options? Does your company have experience with comparable medium-voltage/high-current generation-station disconnect and breaker modernization projects? We are not currently requiring quotes or bids, however rough estimates would be greatly appreciated. Recommended technical approaches or alternatives Major schedule outage, access, safety, supply-chain or constructability risks. Do you believe all aspects of this requirement could be successfully performed by the small business sector under NAICS 237990 (Size standard $45M)? (Yes/No). If No, what estimated percentage do you think can be subcontracted out to small business? Small Business (SB) ______% Small Disadvantaged Business (SDB) ________% Woman-Owned SB (WOSB) _______% Veteran Owned SB (VOSB) _______% Service Disabled VOSB (SDVOSB) _______% Historically Underutilized Business Zone (HUBZone) _______% Important Notice: Attendance and participation is not required for consideration on future contracts related to this work. The U.S. Government is not obligated to pay for any information, documentation, demonstrations, or data provided, nor will it reimburse any costs incurred by your organization in preparing responses, traveling to, or participating in this Industry Day and physical equipment inspection. All costs associated with attending this event and participating in this information exchange are solely at the responding party’s expense. Small Business Program Inquiries: Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/ Thank you for your interest in this USACE project.
68%
Special Notice11/23/2026
Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center National Small Business MATOC The Virtual Industry Day Meeting for the USACE Enterprise Dredge Delivery Center National Small Business MATOC will occur on 12 January 2027 from 1300ET to 16:00ET via Teams. All interested dredging companies are encouraged to attend. If you would like to provide comments or questions prior to the Industry day, please do so on wwww.projnet.org. All questions or comments are due by 04 January 2027 at 1100 ET. Solicitation Number: W912PM27RA007 Bidder Inquiry Key: PV63ES-IJ49PU National Small Business Multiple Award Task Order Contract (MATOC): The United States Army Corps of Engineers (USACE) executes construction contracts for regular, reoccurring, and emergency National Enterprise Dredging requirements at various coastal harbors, inland rivers, canals, and connecting channels throughout the United States. Individual projects are typically annual requirements and may utilize mechanical, hydraulic, or a combination of dredging equipment and techniques with activities to include but not limited to maintenance and new work dredging, dredged material placement, and other activities such as Confined Disposal Facility (CDF), Dredged Material Disposal Facility (DMDF), or upland placement site maintenance, groundskeeping, other earthwork at placement sites, surveying, or other work connected with dredging and placement requirements. Task orders issued under this MATOC will require the contractor to mobilize dredge plant and support vessels to the project location, perform dredging as shown on the respective plan(s), place dredged material—which may include beach nourishment, open-water placement, CDFs, DMDFs, beneficial use, or alternative placement strategies as indicated in individual task orders—, provide for any necessary environmental required protected species observers (PSOs) or environmental surveys, and demobilize once complete. The maximum ordering capacity for the 5-year ordering period of the MATOC and maximum task order amounts are TBD. Below are the draft source selection criteria proposed: FACTOR 1: Technical Capability a. Submission Requirements: Dredge Information: The offeror shall provide documentation for any dredges being proposed for use under this solicitation/contract, and any subsequent task orders. If the proposal does not include at least one of the identified dredges below, then Factor 1 will be rated “Unacceptable”. Proposed dredges must include a minimum of at least one of the following: Cutter Suction Dredge - employs a mechanical cutter to break up material which is then excavated hydraulically and transported to the placement site through a pipeline. Minimum Requirement: 10-inch discharge diameter or larger Mechanical Dredge - uses of some form of bucket to excavate and raise submerged material. Minimum Requirement: 5 cubic yard bucket or larger Offeror can submit more than one dredge(s) that meets the minimum requirements above in responding to this evaluation factor. Dredges that are still under construction or are in the process of undergoing major reconstruction will not be considered. The dredge documentation must include the following information: dredge type; certify that the dredge meets minimum requirements stated above; proof offeror owns the dredges submitted (leased dredges are not acceptable). FACTOR 2: Past Performance Submission Requirements: Offerors will be required to provide three (3) past performance examples of recent and relevant maintenance dredging projects for the type of dredge submitted under Factor 1 – Technical Capability, which demonstrate that they have experience accomplishing the following: dredging of Navigation Channels, Rivers, Harbors, Inland Waterways with depths ranging from 6 feet to 50 feet. The past performance examples must include dredging that has been performed within the last six (6) years from the date of the solicitation. In addition to submitted examples, the Government may review any other sources of information for evaluation of past performance. If the Offeror is proposing as a Joint Venture (JV), Partnership and/or Teaming Arrangement and past performance cannot be provided as such, each partner shall submit past performance information but shall not exceed the three (3) projects total for this factor. Note 1: NAA: The Offeror will be required to provide documentation related to EM 385-1-1 requirements such as Floating Service Naval Architecture Analysis (NAA) with either MATOC or Task Order proposal. 2. Note 2: The Offeror may be required to submit a letter of commitment with their proposal from a surety that confirms that the offeror's bonding capacity meets a specified minimum amount. Please RSVP no later than 9AM ET 11 January 2027 to both Ros Shoemaker and Elizabeth (Lisa) Trimble at Rosalind.m.shoemaker@usace.army.mil and Elizabeth.M.Trimble@usace.army.mil if you plan to attend the Industry Day. A Teams calendar invite will be sent out to all RSVP’s.
68%
Special Notice01/12/2027
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 18 November 2026 at 9:00AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, and to also provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2028 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $37 million Magnitude of Construction: $100 - $500 million Project Title: Tampa Harbor Improvements Industry Day. Purpose: The purpose of this scheduled Industry Day is to provide the latest information regarding the future advertisement and award of Contract 1 for the Tampa Harbor Deepening Project. The scheduled event will include a detailed presentation by the Jacksonville District US Army Corps of Engineers, Tampa Harbor Project Delivery Team (PDT) followed by open Q&A and 1-1 meeting opportunities with contracts to ask more in-depth questions and get feedback as the design and permitting moves forward. Project Description: The project includes construction dredging to deepen and widen specified areas within the federal navigation channel of Tampa Harbor. The project is planned for six (6) contracts over an estimated 8–10-year period. The Scope of Work for this Industry Day will be focused on Contract 1. Contract 1 work includes deepening of Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel and Cut-D (HB) to a depth of 49 feet MLLW, deepening the Port Sutton Terminal Channel to a depth of 44 feet MLLW, and deepening the East Bay Channel Extensions 1 and 2 to a depth of 41 feet MLLW. The Contract 1 work also includes widening of Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All dredged material from the project will be disposed of in the East Bay Placement Area, DMMA 2-D and DMMA 3-D. Estimated quantities to be dredged are roughly 4.4 million cubic yards. Link to the Tampa Harbor Improvements USACE website: https://www.saj.usace.army.mil/Tampa-Harbor/-30-/ Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: 1. Company/Contractor name, address, point of contact, phone number and e-mail address. 2. Does the Contractor plan to submit a proposal for this contract? 3. Describe the proposed construction methods and sequencing and equipment needed to complete the project. At a minimum, address pre-dredging, side-casting of pre-dredging material, and placement into the East Bay Placement Area including constructing the containment perimeter and filling within the area. The contract will include geologic data of the dredge and placement areas as well as the geotechnical requirements for materials considered suitable for constructing the containment perimeter. The contractor will propose the dredging sequence to accomplish constructing the containment perimeter that meets required geotechnical specifications. Describe the factors considered in determining the dredging sequence, such as the material type, proposed equipment, proximity to the placement area, etc.? 4. Describe any constructability, stability, safety concerns with East Bay Placement Area. Describe additional equipment or methods required to place infill above water and/or above the proposed crest of the containment perimeter. Describe any concerns for drainage of the placement area. 5. Describe how filling the East Bay Placement Area will not result in material migrating out of the placement area and into the federal channel. At a minimum, address how existing soft material at the placement area will be contained when disturbed. 6. Will the proposed East Bay Placement Area construction methods require equipment to be located within the federal channel for extended periods of time acting as obstructions for vessel traffic, or obstruct Port Tampa Bay Berth 150? 7. For East Bay Placement Area, describe any temporal facilities, staging and laydown areas, and utilities that would be required or preferred in adjacent upland areas. 8. Dredging and placement of material will be conducted in a manner to minimize turbidity. Describe the turbidity control measures, such as turbidity curtains, that would be incorporated into the proposed construction methodology. If hydraulic placement of infill is proposed for the East Bay Placement Area, describe how affluent will be managed. 9. Based on prior dredging construction experience either in Tampa Bay or other locations in Florida, what are some of the challenges USACE could streamline to improve contract execution? 10. Describe any concerns with execution of the environmental species monitoring and reporting. Event Date: Wednesday, 18 November 2026 at 9:00 AM EST. Event Location: Port of Tampa – Cruise Terminal 6 1331 McKay Street Tampa, Florida 33602 *Parking available onsite For more information, please see the Industry Day Agenda copy under the Attachments. Contact Info: Manny Vianzon, Project Manager (904) 232-3292 Emmanuel.A.Vianzon@usace.army.mil If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 212 869 457 Passcode: tG6Ff3Gt Join by phone: 604-262-2433 Phone conference ID: 972 118 411# NOTES: NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE VIRTUAL INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
66%
Special Notice11/18/2026
W912PM27RA008 Intent to Consolidate Notice The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center requires a contract to perform maintenance dredging of three (3) dredging projects. The areas of consideration for these dredging services are Gulf Intracoastal Waterway, Channel to Victoria, and Channel to Harlingen located in Texas. In accordance with Revolutionary FAR Overhaul (RFO) 7.107-3, the Government intends to consolidate three (3) contracts for maintenance dredging of Gulf Intracoastal Waterway, Channel to Victoria, and Channel to Harlingen performed by a small business. The consolidated effort will be solicited as a small business set-aside. The consolidation of the three (3) identified projects is in the best interest of the Government. This consolidation meets the requirements of RFO 7.107 and the benefits of the consolidated acquisition would substantially exceed the benefits that would be derived from an alternative approach. Therefore, the Government found that consolidation is necessary and justified and shall be available for seven days prior to the release of the solicitation for this requirement. The solicitation is anticipated for release on or around 19 November 2026.
65%
OtherOpen

Additional Details

Solicitation Number

W912P514R0003

Archive Date