Notice ID: 55311040e5944321bf2fd0ec24fdda94Solicitation
Kentucky Lock-Downstream Lock Monolith Construction
Archived on October 15, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- June 3, 2021
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST NASHVILLE
- Place of performance
- Grand Rivers, 42045
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912P520R0004
- Notice ID
- 55311040e5944321bf2fd0ec24fdda94
Description
USACE Nashville District intends to issue a Request for Proposal (RFP) solicitation for this requirement. This is a Solicitation Notice. The Government will not pay for any effort expended in responding to this notice, nor will the Government accept proposals as a result of this Notice. PROJECT DESCRIPTION: The Nashville District of the US Army Corps of Engineers intends to issue a Request for Proposal (RFP), W912P520R0004, for a firm-fixed price construction contract to construct the Downstream Monoliths for the Kentucky Lock, Grand Rivers, KY. No solicitation document exists at this time. The scope of work will be attached with the solicitation announcement. The solicitation is expected to be released on or around 16 April 2021. The intended start date for this project is approximately thirty (30) days after contract award. The estimated performance period for this contract is 2,008 days after Notice to Proceed. POINT-OF-CONTACT: For questions and /or concerns regarding the video conference presentation, please contact Eugenia J. Corder at Eugenia.J.Corder@usace.army.mil. This will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions. Post Amendment W912P520R0004-0001 on 28 April 2021 to replace and add Price Schedule, Technical Specifications, Appendix A and Appendix B. Post Amendment W912P520R0004-0002 on 10 May 2021 to Extend Question due date from 10 May 2021 at 10:00 AM Central time to 17 May 2021 at 10:00 AM Central time; Extend Proposal due date from 4 June 2021 at 10:00 AM Central time to 14 June 2021 at 10:00 AM Central time; revise delivery date for CLIN 0001, 1001, 2001, 3001, 4001, 5001, 6001 and 7001 from “11-OCT-2021 to 30-SEP-2026” TO “11-OCT-2021 to 10-SEP-2026"; Added Virtual Site Visit Attendee List and Presentation; Added Site Visit Attendee list; Update FAR 52.236-4, replace “Lake Superior” with “the Kentucky Lock”; and the Synopsis has been updated from: “The estimated performance period for this contract is 56 months.” TO “The estimated performance period for this contract is 1,795 days after Notice to Proceed.” Post Amendment W912P520R0004-0003 on 3 June 2021 to Answer Questions submitted from 17 May 2021 at 10:00 AM Central time; Extend Proposal due date from 14 June 2021 at 10:00 AM Central time to 23 June 2021 at 10:00 AM Central time; revise delivery date for CLIN 0001, 1001, 2001, 3001, 4001, 5001, 6001 and 7001 from “11-OCT-2021 to 10-SEP-2026” TO “11-OCT-2021 to 11-APR-2027"; Added documents: W912P520R0004-0003 KY Lock Project_Water Testing Data_ Sep2020 Amendment.pdf, W912P520R0004-0003 KYL DS Cofferdam Grouting Amendment.pdf, W912P520R0004-0003 REV Bid Schedule Amendment.pdf, W912P520R0004-0003 TechChanges Amendment.pdf, W912P520R0004-0003 TPlans Amendment.pdf and W912P520R0004-0003 TSpecs Amendment.pdf; addSolicitation Section 00 73 00, SPECIAL CONTRACT REQUIREMENTS; Update FAR 52.236-4 and 52.252-3; Update Contractor access to the pit by 01 November 2022 per revised Specification 01 00 00, paragraph 1.15 and the Synopsis has been updated from: “The estimated performance period for this contract is 1,795 days after Notice to Proceed.” TO “The estimated performance period for this contract is 2,008 days after Notice to Proceed.” This description is not intended to be all encompassing and is subject to change.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912P520R0004- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Special NoticeFeb 22, 2021
Kentucky Lock-Downstream Lock Monolith Construction
- Pre-SolicitationApr 5, 2021
Kentucky Lock-Downstream Lock Monolith Construction
- 4×SolicitationCurrentApr 20, 2021
Kentucky Lock-Downstream Lock Monolith Construction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. THE WORK CONSISTS OF THE REMOVAL AND SATISFACTORY DISPOSAL OF ALL MATERIAL ABOVE ELEVATION -16.0 MLG FROM C/L STATION 70+00 (MILE 1.3) TO C/L STATION -210+00 (MILE -4.0), OF FRESHWATER BAYOU CHANNEL FROM THE LIMITS AS SPECIFIED HEREIN AND SHOWN ON THE CONTRACT DRAWINGS. ALL DREDGED MATERIAL SHALL BE TRANSPORTED AND SUCCESSFULLY DEPOSITED ON THE GULF SHORELINE WEST OF THE FRESHWATER BAYOU CHANNEL, AS SHOWN CONTRACT DRAWINGS. (THE SOLICITATION WILL INCLUDE 5 DRAWINGS AND SPECIFICATIONS). ***BID OPENING TO BE ESTABLISHED BY AMENDMENT*** | 71% | Solicitation | 06/18/2028 |
The purpose of Amendment 0003 to Solicitation W912BU26RA013 is as follows: a.) To provide additional Request for Information (RFI) questions and responses. b.) To provide the Drawings Amendment 0001 document. c.) To provide the Specifications Amendment 0001 document. d.) To update FAR 52.252-3, Alterations in Solicitation. | 67% | Solicitation | 06/03/2026 |
Contract award Webbers Falls Tainter Gate Replacement and Repair. | 66% | Awarded | Open |
** EFFECTIVE MARCH 2, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE FEBRUARY 12, 2026: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** Under this Solicitation, the United States Army Corps of Engineers- Chicago District issues Solicitation No. W912P626BA016 for bidding purposes. PROJECT INFORMATION: The scope primarily includes removing the existing material on the upstream face of a stacked masonry stone wall, shotcrete, applying a waterproofing system, and replacing the material to the east and west of the Upper Appleton hydropower plant. The existing wall is roughly 150 years old and has had increased seepage over the past decade. It is founded on bedrock and +/- 20 feet tall. The rehabilitation includes about 365 feet west of the hydropower plant and 140 feet east of the hydropower plant. ACQUISITION INFORMATION: Competition for this acquisition is FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $45 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000.00. The requirement is for 439 calendar days. The solicitation IS downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Invitation for Bids) are due by 2:00 p.m. (Central Time) on March 3, 2026. IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. The Point of Contacts for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil, and Samantha Stiles at samantha.l.stiles@usace.army.mil. Please include Solicitation number W912P626BA016 on all correspondence. ** | 66% | Awarded | Open |
** EFFECTIVE MARCH 2, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE FEBRUARY 12, 2026: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** Under this Solicitation, the United States Army Corps of Engineers- Chicago District issues Solicitation No. W912P626BA016 for bidding purposes. PROJECT INFORMATION: The scope primarily includes removing the existing material on the upstream face of a stacked masonry stone wall, shotcrete, applying a waterproofing system, and replacing the material to the east and west of the Upper Appleton hydropower plant. The existing wall is roughly 150 years old and has had increased seepage over the past decade. It is founded on bedrock and +/- 20 feet tall. The rehabilitation includes about 365 feet west of the hydropower plant and 140 feet east of the hydropower plant. ACQUISITION INFORMATION: Competition for this acquisition is FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $45 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000.00. The requirement is for 439 calendar days. The solicitation IS downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Invitation for Bids) are due by 2:00 p.m. (Central Time) on March 3, 2026. IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. The Point of Contacts for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil, and Samantha Stiles at samantha.l.stiles@usace.army.mil. Please include Solicitation number W912P626BA016 on all correspondence. ** | 66% | Solicitation | 03/05/2026 |
Additional Details
Solicitation Number
W912P520R0004
Archive Date
Oct 15, 2021
Office Address
NASHVILLE, TN, 37203-1070