Notice ID: fbb96dc43c194423946ff69a199904b7Solicitation
Blue Heron Mine 18 Sanitary – New Onsite Wastewater Disposal System
Archived on January 28, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−06:00
- Posted
- January 5, 2022
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST NASHVILLE
- Place of performance
- Stearns, 42647
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912P522B0001
- Notice ID
- fbb96dc43c194423946ff69a199904b7
Description
***UPDATE ***Amendment 0001 for Solicitation W912P522B0001 is hereby modified with the following changes 1. Revise the Bid Schedule as a separate attachment. 2. Provide the Site Visit sign-in Sheet as a separate attachment. 3. Extend the bid opening due date from Thursday, January 06, 2022 at 1:00 p.m. Central Time to Thursday, January 13, 2022 at 1:00 p.m. Central Time. 4. Incorporate the current wage determination dated 24 Dec 2021; Modification #75. Revise 52.252-3 Alterations in Solicitation, is upda Please acknowledge receipt of this amendment when submitting your bid. PROJECT Title : Blue Heron Mine 18 Sanitary- New Onsite Wastewater Disposal System TYPE OF CONTRACT: Firm Fixed Price Construction DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: Between $500,000 and $1,000,000 NAICS: 237110 - Water and Sewer Line and Related Structures Construction SIZE STANDARD: $39.5 million TYPE OF SET ASIDE: Total Small Business Central Contractor Registration and OCRA are now available through the System for Award Management (SAM), available at www.sam.gov.Offerors must comply with the requirements of 52.204-7; 52.204-8; 52.232-33 and any other CCR/ORCA requirements in this solicitation through SAM. PLEASE NOTE SAM is completely free of charge for both registrants and users. Bids recieved by Email or Facsimile will not be considered. NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder". The work consists of constructing a new onsite wastewater disposal system to serve the visitor’s center, restrooms, and concessions building at the Blue Heron Mine 18 National Park. The project will remove approximately 750 cubic yards of the shale material and 44 inches of unstable soil and replace it with high quality sandy lateral field soil. The project will install an addition 10 feet of sand material on either side of the lateral fields, new piping, pumping station, holding tanks, and site restoration. Location : Blue Heron Mine 18, Big South Fork River and Recreation Area Period of Performance (POP) : 270 calendar days See drawings and specs attached to solicitation W912P522B0001 in https://sam.gov Pre-Bid Site Visit: An organized site visit has been scheduled for Thursday, December 09, 2021 at 1000 Central Time at Stearns Ranger Station, 300 Wilburn K. Ross Highway, Stearns, KY 42647. Question and Answers- Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet . As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation. Project: Blue Heron Mine 18 Sanitary – New Onsite Wastewater Disposal System The Solicitation Number is: W912P522B0001 The Bidder Quick Add Key is: FQ7GHT-CN6C6X Bids- The Bidder’s bid shall be submitted electronically, as described below. The Bidder’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited. Bidders shall submit their bids using the following link: https://safe.apps.mil/ The following documents will be attached in https://sam.gov PRICE BREAKOUT SCHEDULE – CERTIFIED FINAL - RTA SUBMISSION Technical Specifications for Blue Heron Mine 18 Wastewater Sewer Replacement - W912P522B0001 Tspecs RTA.pdf Drawings for Blue Heron Mine 18 Wastewater Sewer Replacement – Pages 24 W912P522B0001 Drawings RTA.pdf
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912P522B0001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationNov 4, 2021
Blue Heron Mine 18 Sanitary – New Onsite Wastewater Disposal System
- 3×SolicitationCurrentDec 6, 2021
Blue Heron Mine 18 Sanitary – New Onsite Wastewater Disposal System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912P522B0001
Archive Date
Jan 28, 2022
Office Address
NASHVILLE, TN, 37203-1070