GovChime
Notice ID: 36750db8e53f405e8aa353b4d1794db1Solicitation

W912P522B0016 Mouse Creek 12th St Detention Structure Cleveland, TN

Archived on August 20, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−05:00
Posted
August 11, 2022
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST NASHVILLE
Place of performance
Cleveland, TN, 37311
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912P522B0016
Notice ID
36750db8e53f405e8aa353b4d1794db1

Description

Add Bid Abstract from bid opening. Amendment 0003: The purpose of this amendment is to extend the bid due date from Monday, August 1, 2022 to Friday, August 5, 2022 at 1:00 p.m. Central Time, update Specifications and Plans, provide answers to Questions from Potential offerors, and provide Bid Opening information. Amendment 0002: The purpose of this amendment is to extend the bid due date from Monday, July 25, 2022 at 11:00 a.m. Central Time to Monday, August 1, 2022 at 1:00 p.m. Central Time. Amendment 0001: This solicitation is amended to revise the Site Visit Date to 06 July 2022 at 11:00 am eastern time. FAR 52.236-27 ALT I, SITE VISIT (CONSTRUCTION) is updated. The project will include the following features of work: A concrete spillway for overflow and box culvert (4-foot width) at the base of the structure for underflow, which will restrict the stream that currently runs through the site. An earthen berm of a height not exceeding 10 feet from the existing stream bed that will extend from both sides of the spillway and tie into the proposed top elevation of 860 feet and 859.5 feet on the west and east side of the structure, respectively. The terrain on the upstream side of the proposed detention structure will be graded to have a 2% slope from the edge of the existing stream bank up to allow for sheet flow into the stream. Any excess material acquired from the grading work may be used as fill material for the detention structure if found to meet the criteria for acceptable. A stilling basin is also proposed on the downstream side between the ends of the wingwall to reduce velocities dissipate energy from the water overtopping the spillway. The downstream portion of the spillway will be armored up to 25 feet out with articulated concrete block (ACB) to prevent any erosion, cavitation, or mining of the soil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912P522B0016
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    SolicitationCurrentJun 21, 2022

    W912P522B0016 Mouse Creek 12th St Detention Structure Cleveland, TN

    Notice 36750db8e53f405e8aa353b4d1794db1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912P522B0016

Archive Date

Aug 20, 2022

Office Address

NASHVILLE, TN, 37203-1070