GovChime
Notice ID: f4ec296539ab45f68c3730fe0b33e24dSolicitation

CHICAGO HARBOR LOCK CHAMBER FLOOR AND WALL REPAIR, CHICAGO, COOK COUNTY, ILLINOIS

Archived on September 22, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:59 PM UTC−05:00
Posted
September 1, 2021
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST CHICAGO
Place of performance
Chicago
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912P621R0010
Notice ID
f4ec296539ab45f68c3730fe0b33e24d

Description

******************************************AMENDMENT 0004***************************** EFFECTIVE SEPTEMBER 1, 2021: The Chicago District has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ******************************************AMENDMENT 0004***************************** ******************************************AMENDMENT 0003***************************** EFFECTIVE AUGUST 27, 2021: The Chicago District has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ******************************************AMENDMENT 0003***************************** ******************************************AMENDMENT 0002***************************** EFFECTIVE AUGUST 24, 2021: The Chicago District has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ******************************************AMENDMENT 0002***************************** EFFECTIVE AUGUST 17, 2021: The government has attached the attendance sheets from the Pre-Proposal Meeting and Site Visit held on Augsut 10, 2021 (please refer to the "Attachments" Section of this Notice). ******************************************AMENDMENT 0001***************************** EFFECTIVE AUGUST 10, 2021: The Chicago District has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ******************************************AMENDMENT 0001***************************** ATTENTION TO OFFERORS ******************************************PRE-PROPOSAL MEETING/SITE VISIT***************************** Instructions to Proposers: a. Only two person per Offeror may be in attendance b. Offerors to arrive between 9:00 a.m.-9:15 a.m. (Central Time) to be escorted to the meeting location c. Personnel must travel through an active construction site to reach meeting location, therefore, ALL personnel must bring their own proper PPE to include hard hat, vest and construction boots to attend d. All attendees should register in advance with the name of company, attendee name and contact information-Register with LYNN EWING- phone (312) 860-0078 e. Offerors are expected to park off site The Pre-Proposal Meeting/Site Visit is scheduled for 10 August 2021. Due to COVID-19, Social Distancing Guidelines will be implemented and only two (2) representatives from each contractor will be able to attend the site visit. Parking is limited, and so please car pool, to ensure one vehicle/contractor. All attendees are required to meet in the parking lot at the Navy Pier at 10:00 a.m. (Central Time). Schedule: 10:00 a.m.-11:30 a.m. (Central Time): Pre-Proposal Meeting and Site Visit at site location No inquiries will be allowed during the site visit. All inquiries must be submitted via email to Ericka Hillard at ericka.d.hillard@usace.army.mil. Please RSVP the following information: 1. Name of Attendee 2. Company 3. Phone Number and Email Address Send RSVP to Lynn Ewing at lynn.ewing@usace.army.mil, USACE must receive the email by 10:00 a.m. (Central Time) on 09 August 2021. No additional attendees will be registered after this date or time. A Confirmation email will be sent out by 09 August 2021, to confirm each registration. It will include driving instructions to the Navy Pier, and any other pertinent information. Face Masks – 100% required. ******************************************PRE-PROPOSAL MEETING/SITE VISIT***************************** Under this Solicitation Notice, the United States Army Corps of Engineers - Chicago District issues Solicitation No. W912P621R0010 for the purposes of receiving technical and price proposals. Therefore, provided hereunder is the relevant Request for Proposals solicitation package for the construction project entitled, "CHICAGO HARBOR LOCK CHAMBER FLOOR AND WALL REPAIR, CHICAGO, COOK COUNTY, ILLINOIS." PROJECT INFORMATION: Under the contract, the contractor will be required to repair the chamber floor and wall at the Chicago Harbor Lock, Chicago, Illinois. The United States Army Corp of Engineers, Chicago District is preparing to conduct maintenance work on the floor and walls of the Chicago Lock Harbor. The purpose of the required maintenance work is to create a secure and durable floor and ensure the north and south walls will withstand forces from extreme weather and passing vessels. The floor and walls of the Chicago Harbor need rehabilitation to prevent further deterioration. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $39.5M. The magnitude of cost for construction is estimated between $25,000,000.00 and $100,000,000.00. The Solicitation package (Request for Proposal - "RFP") is downloadable from this INTERNET SITE ONLY. The package is a Portable Document Format (PDF) file and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Request for Proposals) are due prior to 1:00 p.m. (Central Time) on September 7, 2021. N THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE RFP DOCUMENT, THE DATES IN THE RFP DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE RFP ISSUANCE DATE AND THE DUE DATE FOR PROPOSALS. IMPORTANT POLICY: Offerors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ms. Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P621R0010 on all correspondence. **

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Ericka D. Hillard
Fax: 3128865475

Documents

No documents available.

Lifecycle

Solicitation:W912P621R0010
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 23, 2021

    CHICAGO HARBOR LOCK CHAMBER FLOOR AND WALL REPAIR, CHICAGO, COOK COUNTY, ILLINOIS

    Notice 9655cb92103a4c9193be33694778a2f7 on SAM.gov

  2. 8×
    SolicitationCurrentJul 30, 2021

    CHICAGO HARBOR LOCK CHAMBER FLOOR AND WALL REPAIR, CHICAGO, COOK COUNTY, ILLINOIS

    Notice f4ec296539ab45f68c3730fe0b33e24d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFP, if any is issued. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the proposed Contract, the contractor will be required to provide the following construction services: The Dutch Gap Aquatic Complex, IL - Sec. 206 project spans 785-acres in Antioch, Lake County, Illinois, on land owned by Lake County Forest Preserves. Intensive agriculture has led to the installation of drain tile networks, excavation of drainage ditches, and stream channelization, impacting natural hydrologic and other processes. Such impacts have enhanced flooding risks, minimized the amount of open space available for native plant and wildlife communities, diminished recreational opportunities, and disturbed natural processes and soils in the project area. The project area is further dominated by non-native and invasive plant species. The principal goal of the project is to restore stream, riparian, wetland, and buffering plant communities to provide habitat for migratory birds and local fish and wildlife. Restoration of aquatic ecosystems within the project area will reestablish hydroperiods and other hydrologic and hydraulic parameters to rehydrate former hydric soils to support critical wetland and riparian habitats. It will also reestablish native plant communities that will further diversify over time, resulting in greater quantity (acres) and quality of native plant communities. Estimated Performance Period: 5 years under NAICS 237990 Other Heavy and Civil Engineering Construction Estimated Cost: Between $5,000,000.00 and $10,000,000.00 All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, March 21, 2025, at 3:30 p.m. Central Time. REQUESTED INFORMATION: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience –Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope/size to this project include: Aquatic ecosystem restoration which includes but is not limited to earthwork and excavation for 2450 feet of re-meandered stream channel, hydrologic restoration through disablement of 70,000 feet of drain tile, and native plant restoration of stream, wetland, prairie, and oak savanna communities over 700 acres. b. Based on the information above, for each project submitted, include: Current percentage of construction complete and the date when it was or will be completed. Scope of the project. Size of the project. The dollar value of the construction contract and whether it was design-bid build or design-build. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. SUBMISSION OF RESPONSES: Respondents interested in providing a response to this Notice shall provide their submittals to Ericka Hillard prior to 3:30 p.m. (Central Time) on March 21, 2025, via email to: ericka.d.hillard@usace.army.mil (ensure that the number & title of the Sources Sought Notice of "W912P625S0003, Dutch Gap Aquatic Ecosystem Restoration,” is included in the subject line of the email). Any electronic files (EMAIL) CANNOT EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to Ms. Hillard's email inbox. NEGATIVE REPLIES ARE WELCOMED.
-Market Research03/21/2025
By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Honey Creek Aquatic Ecosystem Restoration, Milwaukee, Milwaukee County, Wisconsin. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFP, if any is issued. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the proposed Contract, the contractor will be required to provide the following construction services: The Honey Creek Aquatic Ecosystem Restoration project is an ecosystem restoration project focused around the removal of a concrete channel and construction of a natural stream course (i.e., concrete channel removal and geomorphic contouring), installation of in-water habitat features (i.e., channel restoration), and invasive species eradication & native plant establishment. Estimated Performance Period: 730 calendar days under NAICS 237990 Other Heavy and Civil Engineering Construction Estimated Cost: Between $10,000,000.00 and $25,000,000.00 All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, December 15, 2023 at 3:30 p.m. Central Time. REQUESTED INFORMATION: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience –Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope/size to this project include: Concrete demolition and removal, earthwork grading, sizing and shaping of aquatic environments, removal and planting of vegetation. b. Based on the information above, for each project submitted, include: Current percentage of construction complete and the date when it was or will be completed. Scope of the project. Size of the project. The dollar value of the construction contract and whether it was design-bid build or design-build. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. SUBMISSION OF RESPONSES: Respondents interested in providing a response to this Notice shall provide their submittals to Ericka Hillard prior to 3:30 p.m. (Central Time) on December 15, 2023, via email to: (ensure that the number & title of the Sources Sought Notice of "W912P624S0002, Honey Creek Aquatic Ecosystem Restoration,” is included in the subject line of the email). Any electronic files (EMAIL) CANNOT EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to Ms. Hillard's email inbox. NEGATIVE REPLIES ARE WELCOMED.
-Market Research12/15/2023
EFFECTIVE NOVEMBER 17, 2023: The government seeks responses to Market Survey/Sources Sought for DePere Dam West Spillway Walkway Installation. Interested respondents shall provide their submittals prior to 3:30 p.m. (Central Time) on December 1, 2023. Negative replies are welcome. See below for complete details. ***************************************************************************************************************************************************** EFFECTIVE SEPTEMBER 1, 2023: The government extends the response date of the Market Survey/Sources Sought for DePere Dam West Spillway Walkway Installation to Wednesday, September 6, 2023. Respondents interested in providing a response to this Notice shall provide their submittals prior to 3:30 p.m. (Central Time) on September 6, 2023. ***************************************************************************************************************************************************** By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the DePere Dam West Spillway Walkway Installation, De Pere, Brown County, Wisconsin. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Ntoice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFP, if any is issued. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the planned contract, the contractor will be required to remove and replace the left spillway walkways and piers at DePere Dam, located in De Pere, Wisconsin. The work consists of removal and replacement of the seven steel walkway spans including superstructure and six reinforced concrete piers. Total walkway with railings length is approximately 350 feet. All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, September 1, 2023 at 3:30 p.m. Central Time. Estimated Performance Period: 720 calendar days under NAICS 237990 Other Heavy and Civil Engineering Construction Estimated Cost: Between $1,000,000.00 and $5,000,000.00 REQUESTED INFORMATION: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Description of Experience – Provide descriptions your firm’s past experience up to three (3) projects with greater than 95% construction complete or those projects completed within the last five years which are similar to this project in size, and scope. Provide documentation demonstrating experience for construction of similar type structures and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. a. Projects similar in Scope to this project included: Fabrication and installation of steel and concrete structures in a marine environment; coffer dam or other water control measures. b. Projects similar in size to this project include: Demolition, fabrication and installation of steel and concrete structures in a marine environment; use of water control methods. Construction contract greater than $1 million in total cost. c. Based on definitions above, for each project submitted include: i. Current percentage of construction complete and the date when it was or will be completed. ii. Size of the project iii. Scope of the project iv. The dollar value of the construction contract v. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Must be at least 15% self-performed. vi. Whether the project was design build or design/bid/build vii. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. SUBMISSION OF RESPONSES: Respondents interested in providing a response to this Notice shall provide their submittals to Ericka Hillard prior to 3:30 p.m. (Central Time) on September 1, 2023, via email to: (ensure that the number & title of the Sources Sought Notice of "W912P623S0011, Depere West Walkway,” is included in the subject line of the email). Any electronic files (EMAIL) CANNOT EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to Ms. Hillard's email inbox. NEGATIVE REPLIES ARE WELCOMED.
-Market Research12/01/2023
EFFECTIVE APRIL 4, 2023: The government has attached the Bid Opening Results (please refer to the"Attachments" Section of this Notice). ****************************************************************************************************************************************************** VIRTUAL BID OPENING INFORMATION: THE VIRTUAL BID OPENING WILL BE CONDUCTED ON APRIL 4, 2023 AT 2:00 P.M. (CENTRAL TIME). AT THE DESIGNATED DAY AND TIME, PLEASE JOIN BY: MEETING LINK: https://usace1.webex.com/usace1/j.php?MTID=m5562782dd074c15ee45044deb827dad5 Meeting number (access code): 2761 926 4942 Meeting password: HypVGR2Z@67 OR, JOIN BY PHONE: 1-844-800-2712 US Toll Free 1-669-234-1177 US Toll Access code: 2761 926 4942 Conf ID: press the # sign TIME OF SUBMISSION: Bids are required one hour prior the time specified on Page 1 of this Solicitation, Block #13a. Please note, FAR Subpart 14.302 Bid submission; “Bids shall be submitted so that they will be received in the office designated in the invitation for bids not later than the exact time set for opening of bids.” ************************************************************************************************************************************************** EFFECTIVE MARCH 30, 2023: The government has posted Amendment No. 0005 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE MARCH 28, 2023: The government has attached the attendance sheet from the Pre-Bid Meeting held on March 23, 2023 (please refer to the "Attachments" Section of this Notice). ************************************************************************************************************************************************** EFFECTIVE MARCH 20, 2023: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE MARCH 20, 2023: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** ATTENTION TO BIDDERS ****************************************PRE-BID MEETING & PROJECT SITE VISIT MARCH 23, 2023************************************ A pre?bid meeting and project site visit is scheduled for Thursday, March 23, 2023 at 1:00 p.m. (Central Time). Interested contractors are to meet at location: E. Banta Court (Cul de Sac, under College Ave. Bridge), Appleton, Wisconsin 54915. ****************************************PRE-BID MEETING & PROJECT SITE VISIT MARCH 23, 2023************************************ EFFECTIVE MARCH 1, 2023: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** EFFECTIVE FEBRUARY 22, 2023: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ************************************************************************************************************************************************** NOTICE TO BIDDERS (FEBRUARY 21, 2023): Please be advised an amendment is forthcoming to provide a new ProjNet bidder inquiry key, which is planned for issuance on February 22, 2023. ***************************************************************************************************************************************************** Under this Solicitation Notice, the United States Army Corps of Engineers - Chicago District issues Solicitation No. W912P623B0004 for bidding purposes. Therefore, provided hereunder is the relevant bid package for the construction project entitled, "Appleton Lower Dam Gates 1-5 Replacement in Outagamie County, Appleton, Wisconsin on the Fox River." PROJECT INFORMATION: This project will include the replacement of tainter gates 1-5 at Appleton Lower Dam. The exisiting will be removed and newly fabricated gates installed. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $39.5 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The Solicitation (Invitation for Bids –“IFB”) is downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Invitation for Bids) are due by 2:00 p.m. (Central Time) on March 14, 2023. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. IMPORTANT POLICY: Bidders are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P623B0004 on all correspondence
-Solicitation04/04/2023
This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested/potential contractors of the District's imminent issue of an Invitation for Bid Package for its construction project entitled, "Appleton Lower Dam Gates 1-5 Replacement in Outagamie County, Appleton, Wisconsin on the Fox River." PROJECT INFORMATION: This project will include the replacement of tainter gates 1-5 at Appleton Lower Dam. The exisiting will be removed and newly fabricated gates installed. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $39.5 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The Solicitation (Invitation for Bids –“IFB”) will be downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website ("System for Award Management"), interested bidders may download the full package, includes: specification and drawings files. The Solicitation package is planned for advertisement on or about February 10, 2023, with bids due on or about March 14, 2023. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. IMPORTANT POLICY: Bidders are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P623B0004 on all correspondence. **
-Pre-Solicitation03/14/2023

Additional Details

Solicitation Number

W912P621R0010

Archive Date

Sep 22, 2021

Office Address

CHICAGO, IL, 60604-1437