Notice ID: b3dff7357a114592a56175582a09dbe8Solicitation
Lockport Hydraulic Power Unit
Archived on June 30, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- May 3, 2024
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST CHICAGO
- Place of performance
- Lockport, IL, 60441
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912P624Q0010
- Notice ID
- b3dff7357a114592a56175582a09dbe8
Description
The new HPU will be used on the upstream lift gates to move the hydraulic cylinder during maintenance operations to disconnect the crosshead from the piston or move the piston without the crosshead connected, which supports the gate cables while the main hydraulic pump/system is not in use. The necessary components and setup for the HPU will be installed to the hydraulics system at both sides of the upstream lift gates. Hydraulic operating pressure 1500-2000 psi, ~250 gallon hydraulic cylinder, bore 20.86 in diameter, rod 8.66 in diameter, stroke 170 in., cycle time 90-120 seconds (per the operators), 100 HP pump, 750 gallon reservoir. This hydraulic system is the same on both sides of the Lock (East and West) for both sets of gates.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912P624Q0010- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationFeb 14, 2024
W912P624Q0010 Lockport Lock Portable Hydraulic Power Unit
- SolicitationCurrentMay 3, 2024
Lockport Hydraulic Power Unit
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912P624Q0010
Archive Date
Jun 30, 2024
Office Address
CHICAGO, IL, 60604-1437