GovChime
Notice ID: a49694edbb45497cb6852b8dfba4b4e9Special Notice

Notice of Intent to Sole Source- Metasys Building Automation System - Johnson Controls

Archived. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−07:00
Posted
March 8, 2022
Notice type
Special Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST SAN FRAN
Place of performance
San Francisco, CA, 94102
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912P722R0004
Notice ID
a49694edbb45497cb6852b8dfba4b4e9

Description

Notice of Intent to Sole Source Solicitation Number W912P7-22-R-0004 Soul Source Title: Metasys Building Automation System - Johnson Controls Medical Unit Facility, Building No 8, San Francisco Veterans Affairs Medical Center, San Francisco, California Description: The San Francisco District and the San Francisco Veterans Affairs Medical Center intends to place a brand name specified product, Metasys Access Control System by Johnson Controls, into the solicitation for the construction of proposed Building No 8 at the SFVA San Francisco Campus. 5. Description of Product, Supplies or Services: Brand Name: A justification is being prepared for the use of Metasys Building Automation System by Johnson Controls. Metasys is a building access control system, what is currently in use by the station; has proprietary considerations, is related to specifications or other design requirements; security/safety considerations; ease of integration; and compatibility with existing system. Metasys Access Control System by Johnson Controls is the preferred building control system for the vendor to install at the SF VA site. As a result, the proposed brand name items must be compatible with the existing equipment at the SF VA Medical Center Campus, Building 8. The Government will not purchase the Metasys system directly but will require the construction contractor to provide and install. 6. Statement of actions, if any to remove barriers to competition in the future. The current Access Control System at the SFVA campus utilizes Metasys Access Control System by Johnson Controls. The VA does not consider changing the system due to incompatibility with another manufacturer systems. However, future acquisitions can mitigate and possibly eliminate the effects of such a J&A by allowing the replacement of the system in its entirety as opposed to seeking integration. 7. Scope and Purpose: The overall Objective of this agreement is to provide technical services to support the US Army Corps of Engineers (USACE) and the San Francisco Veterans Medical Center with Seismic Retrofit and Renovation of an existing 30,347 SF facility, Building 8, with estimated 24 months Period of Performance. Construction work includes remediation of asbestos containing materials and lead-based paint present to include the following: fully demolish all existing interior finishes, partitions, and MEP systems. The base scheme for retrofit is to introduce new shear walls and install a series of micropiles. All new mechanical, electrical, telephone, data, life safety, vertical transportation systems, and public toilet facilities will be introduced into the building. An existing exterior fire escape will be removed, and 2 new external enclosed exit stairs will be added to the east side of the building All new partitions, hardware and finishes will be introduced to accommodate the final program. At the roof level, new mechanical equipment will be enclosed in a penthouse enclosure. However, the visual presence of this enclosure requires the final approval of the State Historic Preservation Officer (SHPO). No Major Medical Equipment (e.g., linear accelerator, imaging, laundry, or food service), to be included in the renovated building. 8. North American Industry Classification System (NAICS) Code: The NAICS Code for this requirement is 236220- Commercial and Institutional Building Construction 9. Anticipated period of Performance: Anticipated period of performance is 24 months from day of contract award. 10. Information to industry: This is a Notice of Intent to Sole Source for Information purposes only in accordance with (IAW) Federal Acquisition Regulation (FAR) 5.201 and not a request for competitive proposals. Therefore, no solicitation documents exist for this requirement. Interested parties should submit a Capability Statement and pricing information for this requirement within fifteen (15) days of public notice to be considered by the Government. A determination to compete the proposed contract based upon responses to this notice is solely within the discretion of the Government. Responses received will be considered solely for the purpose of determining whether to conduct a competitive requirement. 11. Response Due Date: Interested vendors should submit the Capability Statement in response to the Notice of Intent to Sole Source electronically by 12:00PM (PST), March 23, 2022 via email to the contract specialist, Erica Miller at Erica.B.Miller@usace.army.mil and Contracting Officer Mary Fronck, mary.fronck@usace.army.mil No phone calls will be accepted. 12. Notice Closes: This Notice of Intent to Sole Source closes on 12:00PM (PST), March 23, 2022. 13. Confidentiality: No proprietary, classified, confidential, or sensitive information should be included in response to this notice. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s).

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912P722R0004
  1. Special NoticeCurrentMar 8, 2022

    Notice of Intent to Sole Source- Metasys Building Automation System - Johnson Controls

    Notice a49694edbb45497cb6852b8dfba4b4e9 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Update - PLEASE BE ADVISED THAT THE SOLICITATION NUMBER HAS BEEN UPDATED TO W912QR27BA004. The anticipated posting date has been changed to on or about 6 November 2026. DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bid (IFB), Solicitation No. W912QR27BA001, for the repair of building 1203 located at March Air Reserve Base, CA. A description of the construction project is as follows: This project will address the mechanical system deficiencies and the sprinkled water supply line into Building 1203 (34,281 SF) at March Air Reserve Base, CA. The scope of work shall include replacement of the entire mechanical systems, including ductwork, sensors, air handling units 1 and 2, and associated controls including fire alarm controls. In addition, the project scope will include replacement of the existing main fire water supply line from the street main to the riser room. The PIV (post indicator valve) shall be replaced as part of the project scope. Testing and balancing, and commissioning, of the complete mechanical system and fire suppression systems shall be completed following the installation work. The Contract Duration is expected to be 350 days from Notice to Proceed. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 -Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be a General Small Business Set-Aside procurement. SELECTION PROCESS: This is a Design/Bid/Build procurement, Invitation for Bid, sealed bid. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $1,000,000 and $5,000,000. ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 21 September 2026. Additional details can be found in the solicitation when it is posted to www.SAM.gov SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at the Contracting Opportunities website, www.SAM.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities website at www.SAM.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist Rachael McClellan at Rachael.L.Mcclellan@usace.army.mil. Responses to this synopsis are not required. This announcement serves as the Advance Notice for this project.
76%
Pre-Solicitation11/15/2026
This solicitation is for construction services required for HVAC and Fire Suppression systems repair of Building 1203 at March Air Reserve Base, CA. This is an Invitation For Bid, sealed bid procurement. The solicitation notice will be posted to SAM.gov 4 November 2026 by Close of Business.The U.S. Army Corps of Engineers (USACE) Louisville District hereby issues an Invitation for Bid (IFB), Solicitation No. W912QR27BA004, to renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California. A description of the construction project is as follows:This work consists of, but is not limited to, installing a new Dedicated Outside Air System (DOAS) air handling unit, the replacement of Air Handling Unit (AHU-02) and the replacement of the existing waterline that ties the main waterline to Building 1203. The distance of waterline to be replaced is estimated to be 100-ft. Additional site-work will include a larger housekeeping pad, larger equipment access platform, and larger landscaped enclosure to accommodate the additional DOAS air handling unit. New outside air supply and return ductwork will be incorporated leading from the DOAS unit to the rooms served by AHU-02 providing direct-to-room ventilation. The Contract Duration is 500 calendar days from Administrative Notice to Proceed.TYPE OF CONTRACT AND NAICS: This IFB is intended to result in the award of one Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction.TYPE OF SET-ASIDE: This acquisition is a Total Small Business Set-Aside.DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussion should it be deemed in the be interest of the Government.CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $1 million and $5 million.REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Rachael McClellan, Rachael.L.McClellan@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve defeminization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ and then clicking on: View FFP Contract Changes Playbook Here.
68%
Solicitation12/10/2026
This is a SOURCES SOUGHT NOTICE for information only. Replies by interested parties will be used by this agency for preliminary planning purposes. No proposal or contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow-up information requests. The U. S. Army Corps of Engineers has been tasked to solicit and award a firm fixed price for Renovation of Community Living Center (CLC), Building 60 (B60) at the Southern Arizona VA Healthcare System at Tucson, Arizona.This is a SOURCES SOUGHT NOTICE for information only. Replies by interested parties will be used by this agency for preliminary planning purposes. No proposal or contract will be awarded from this notice. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow-up information requests. The U. S. Army Corps of Engineers has been tasked to solicit and award a firm fixed price for Renovation of Community Living Center (CLC), Building 60 (B60) at the Southern Arizona VA Healthcare System at Tucson, Arizona.PROJECT SCOPE: The project includes the renovation of the CLC, which consists of eight main components listed below by priority. Priority of components was coordinated with VA staff. a. HVAC Partial Upgrade b. Hospice Wing Refresh c. Hospice Wing Family Room Remodel d. Dining Area Patio Renovate and Repair e. Neighborhood Kitchen Construction f. Dining Area Refresh g. Hospice Wing Exterior Room Doors (Patio Access) h. Hospice Wing Patio Landscaping The project location is CLC B60 on the northeast corner of the Southern Arizona VA Health Care System (SAVAHCS) in Tucson, Arizona. B60 is a 73,000-square-foot, one-story without basement, fully sprinklered building with an upper-level penthouse. The original building was constructed under the provisions of NFPA 101 ? 1985 Edition.The objective of this project will be to correct safety deficiencies of B60, modernize, and refresh all finishes, and complete systems repair/improvements in the specific areas identified to ensure a more home-like feel for the patients, thus improving patient care and overall satisfaction. The main areas of focus are the Neighborhood Kitchen, Dining Room, two exterior Patios, and Hospice areas along with the HVAC and mechanical systems supporting B60. The areas will be refreshed and will at a minimal be comprised of floor replacement, wall finishes, handrails/bumper/corner guards, select doors/ hardware, ceilings, lighting, and casework will be refreshed. A general look of the areas is below.Dietetics Storage Area Approximately 147 square feet, is too small to adequately provide nutrition services to patients. A re-work and expansion of this is area is required to accommodate a cook to order service, associated equipment, and storage.Dining Room A complete refresh of the Dining Room area, approximately 2,100 square feet, is needed. An acoustical engineering review of this space will be required. The adjacent exterior patio area will be renovated to provide a more residential feel to the patients and visitors. The space shall be shaded from the elements and incorporate lighting that will allow the space to be used during all hours. The dining room patio will also require structural and drainage corrections to render the space usable. An engineering review of this area will be needed with all reports required to determine the cause of concretes and pavers failure, provided to the VA.Hospice Living Area Approximately 5,222 square feet, is split between administration, communal, and resident room spaces. Select administration spaces within the Hospice wing will require a refresh. The Hospice Living Area and Kitchenette (communal spaces) will be renovated to co-locate current functional areas, which will include removal of the existing toilet room and replacement and relocation and co-location of the kitchenette, living space, and associated utilities.Resident Bedrooms Renovation of the resident bedrooms will include an investigation and of the showers such as drainage issue is causing water to pool when the showers are in use. This may entail reconstruction of the shower floor with new finishes.HVAC The HVAC and supporting mechanical systems need to be updated. A review of all the HVAC components and chilled water system is needed to determine what needs to be replaced so that the area can be properly conditioned.MINIMUM CAPABILITIES REQUIRED INCLUDE THE FOLLOWING: Building renovation, electrical, HVAC and heating, fencing/ access gates, roofing, and chillers/cooling towers. Minimum capabilities required, include previous experience of projects similar in magnitude and complexity.The type of socioeconomic set-aside, if any, will depend upon the responses to this source sought notice.The purpose of this notice is to gain knowledge of the experience and capabilities of both small and large business concerns in the construction industry, in performing similar projects in magnitude and complexity of this requirement.The Government is seeking to identify qualified sources either singularly or as part of an assembled team under North American Industry Classification System (NAICS) code 236220 Commercial and Institutional Building Construction, which has a small business size standard of $45,000,000.00.The estimated construction price range for this project is between $10,000,000 and $25,000,000.In accordance with Federal Acquisition Regulation (FAR) 52.219-14, Limitations on Subcontracting, small business prime contractors will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the 85 percent subcontract amount of the prime contractor that cannot be exceeded. Prior Government contract work is not required for submitting a response under this source sought synopsis. Minimum capabilities required, include previous experience of projects similar in magnitude and complexity. Interested sources shall submit a capability statement demonstrating their ability to perform the work as described above. Responses should include the following information, which shall not exceed a total of seven pages. 1.Offeror name, address, point of contact, with telephone numbers, and email addresses. 2.Business size/classification, to include any designations as a Small Business, HUBZone, Service Disabled, Veteran Owned, Women-Owned, Disadvantaged Small Business, 8(a), in addition to others, and NAICS code designations.3.Bonding capability (construction bonding level per single contract, expressed in dollars; along with current available bonding capacity). 4.Interest in proposing on the solicitation when it is issued. 5.Description of capability to perform the proposed project. Including, capability to manage subcontractors, manage and provide required reporting of small business subcontracting plan progress in a timely/accurate manner, advancing the socio- economic goals of the Federal Government, prepare and comply with various environmental and construction permits, and capacity to execute this project with other ongoing construction contracts.6. Past experience on individual projects of similar scope and magnitude , as described above in the project scope, and describing no more than four (4) projects within the past five years. Response MUST demonstrate experience in building renovation, electrical, HVAC and heating, fencing/ access gates, roofing, and chillers/cooling towers. Examples of Department of Veterans Affairs and SPL footprint is a plus. Sample projects over $4M is preferred. The projects should be similar in nature to what is described above in the Project Scope. The project title, location, general description to demonstrate relevance to the proposed project, the Offeror role, dollar value of contract, and name of the company, agency, or Government entity for which the work was performed with contact information (reference name, phone number and e-mail address) should be included for each project. Responses should be submitted to Tiffany Chang, Contract Specialist, by email at Tiffany.Chang@usace.army.mil. Responses are due no later than June 24, 2026 at 1400 PDT. Submittals will not be returned. This is not a Request for Proposals, only a Request for Information. No award will result from this Sources Sought Notice. This notice does not constitute any commitment by the Government.
65%
Market Research06/24/2026
The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the Chesapeake and Delaware (C and D) Canal Building Replacement Project. The Chesapeake and Delaware or Canal connects the Delaware River to the Chesapeake Bay and Port of Baltimore. The canal is maintained from a field office located in Chesapeake City Maryland. This office consists of multiple buildings and shops that are essential to the continued operation of the canal. Several of these building have reached the end of their lifecycle and need to be replaced. This project will include the demolition and consolidation of the mechanics shop, bridge shop and storage buildings. A new building will be constructed to sever as a replacement of the buildings that are being removed. The building will be located along the east side of the project site. The building dimensions will be 60 feet x 150 feet with a clear ceiling height of 20 feet. The building will have a gable roof with the ridge running parallel to the length of the building. A pre- engineered metal building with tapered columns will be used. The columns will be enclosed with steel stud framing and gypsum board in the office areas. Vehicle and workshop areas will have propane fired heating. Office areas will be provided with air conditioning. The electrical service will be upgraded if necessary to provide power to the new building. The building will be connected into backup power from the existing diesel generator. Work will consist of the following activities: A.) The project scope includes all work required to design and construct a 9,000 square foot maintenance building in accordance with the Request for Proposal documents including the demolition of the four existing buildings and propane storage tank currently located at the site. Utilities serving each of the buildings being demolished must be demolished to the extents defined in section 02 41 00 Demolition. Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the Offeror is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods must reflect this by choosing the most economical type of construction allowed by code for this occupancy/project. B.) The maintenance building must be provided with Heating, Ventilation, and Air Conditioning (HVAC), electrical, communications, fire protection, life safety, plumbing systems, waste oil storage, and compressed air systems. C.) A 3,000 square foot storage shed must be designed and constructed at the location identified on the site plan. The shed design must include power and lighting. D.) The scope of work also includes civil site work consisting of site paving, installation of stormwater drainage, connection into the domestic water utility, sanitary sewer utility connection for the new maintenance building, connection of existing sanitary sewer lines into the towns sanitary sewer utility, a vehicle wash area and fire hydrants. Site work is shown in Appendix A. Site electrical work must be completed to provide the maintenance building and storage shed with power fed from the existing switch gear shed. Site telecommunications work must be completed to provide the maintenance building with connection into the existing telecommunications utilities. E.) A propane storage tank must be provided onsite and be connected to the new maintenance building and the existing propane fired generator. The estimated period of performance will be 730 calendar days. The estimated magnitude of this project is between $5,000,000 and $15,000,000. The North American Industrial Classification System (NAICS) code is 236220 Commercial and Institutional Building Construction, with an SBA Size standard of $45.0M.
63%
Pre-Solicitation11/25/2026
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a solicitation of a requirement for Design-Bid-Build (DBB) construction services to build a new single-story, 5,000 square-foot (SF) Headquarters (HQ) building and a new single-story, 4,200 SF maintenance shop w/ storage mezzanine to support USACE administrative, ranger, and maintenance staff at H.L. Englebright Dam and Lake in Smartsville, California (CA).The HQ building is anticipated to be metal-stud construction and will include management offices, open cubicle work areas, conference room, information center, communication, mechanical and electrical rooms, restrooms, nursing room, kitchen, storage room, and copy room. The maintenance shop is anticipated to be a pre-engineered metal building and will include maintenance bays, management office, open cubicle work areas, electrical room, restroom, locker room, kitchen, tool room, and storage mezzanine. Also located at the maintenance shop will be new pre-engineered metal buildings for the equipment and hazardous material sheds. The project is also anticipated to include the demolition and removal of two (2) existing buildings and three (3) shed structures, as well as new building construction, grading, utilities, oxidation pond relining, asphaltic concrete paving, sidewalks, curbs, fencing, and landscaping.The Government estimates that construction of the anticipated requirement can be completed within seven hundred and twenty (720) calendar days from receipt of Notice to Proceed (NTP).The anticipated requirement will be awarded as a firm-fixed-price contract by approximately March 2026.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204-5(i), the Government currently estimates the magnitude of construction for this project to be between $10,000,000.00 and $25,000,000.00.The North American Industry Classification System (NAICS) code for the potential requirement is anticipated to be 236220, Commercial and Institutional Building Construction. The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $45 million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1JZ, Construction of Miscellaneous Buildings. It is currently anticipated that the Government will conduct a site visit in mid-January 2026. The specific date, time, location, and access requirements will be identified in forthcoming solicitation. Please DO NOT request an updated schedule if estimated dates are surpassed; the Government will release all information publicly through PIEE and SAM when updates are available. Requests for schedule updates may be ignored. A DRAFT copy of the requirement specifications are included as an attachment to this Notice. Changes may be made to this document prior to any subsequent solicitation. Questions related to the draft specifications will NOT be entertained; instructions for submitting questions related to any future solicited specifications will be included in any forthcoming solicitation. Any available technical data will be furnished with any forthcoming solicitation. Following solicitation release, all responsible sources may submit a bid that shall be considered by the agency. This project and/or the anticipated solicitation may be changed, delayed, or canceled at any time. The anticipated solicitation and attachments may be posted in Portable Document Format (.pdf) which will require Adobe Acrobat Reader to open and view files. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. All prospective Offerors should be registered in the PIEE system at least one (1) week prior to the anticipated bid due date. Registration is not required to download any forthcoming solicitation documents, plans, and/or specifications, but IS required to submit a bid. Copies of the solicitation and attachments will be made available for inspection without charge after the solicitation is released, when accessed through PIEE. Failure to register in PIEE will prevent submission of bids as the Government will not accept them by any other means. See linked PIEE registration instructions and web-based training for information about how to access the PIEE Solicitation Module and submit bids. All prospective Offerors must be registered in SAM before the anticipated solicitation closing date. Please see the SAM website for information about SAM registration requirements and approval timelines. It is anticipated that any future solicitation and/or resulting contract will be subject to the E-Verify Employment Eligibility Verification Program (http://www.uscis.gov/e-verify), sustainable acquisition requirements and/or high-performance sustainable building design and construction practices (https://www.epa.gov/greeningepa/guiding-principles-federal-leadership-high performance-and-sustainable-buildings). Further, one or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. USACE will not notify prospective Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov; Contractors are responsible for identifying their entity as an interested vendor and contacting other interested vendors. USACE SPK will not review capabilities statements submitted in response to this Synopsis or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.
63%
Pre-SolicitationOpen

Additional Details

Solicitation Number

W912P722R0004

Archive Date

Not specified

Office Address

SAN FRANCISCO, CA, 94102-3406