Notice ID: d5fa1866446f4cd89a82da7d56eb9991Solicitation
Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance Dredging, Assumption, St. Mary and Terrebonne Parishes, Louisiana ED 24-024
Archived on October 3, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM UTC−05:00
- Posted
- September 19, 2024
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST NEW ORLEANS
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912P824B0053
- Notice ID
- d5fa1866446f4cd89a82da7d56eb9991
Description
Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance Dredging, Assumption, St. Mary and Terrebonne Parishes, Louisiana ED 24-024 The work consists of satisfactory removal and disposal of all shoal material within the limits of work including dike construction as described and as shown on the contract drawings. The estimated time of completion for Base Work is 371 calendar days and 39 additional calendar days for Optional Work, if exercised, after receipt of notice to proceed. The solicitation includes 34 drawings and specifications. Any questions regarding this solicitation must be received via email by 12:00 pm CT Tuesday, September 3, 2024.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Michelle Dalmado
Documents
No documents available.
Lifecycle
Solicitation:
W912P824B0053- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 26, 2024
Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance Dredging, Assumption, St. Mary and Terrebonne Parishes, Louisiana ED 24-024
- 6×SolicitationCurrentAug 12, 2024
Atchafalaya River, Bayous Chene, Boeuf and Black, Bayou Chene and Avoca Island Cutoff, Maintenance Dredging, Assumption, St. Mary and Terrebonne Parishes, Louisiana ED 24-024
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Bayou Teche, East and West Calumet Floodgate Approach Channels, Maintenance Dredging, St. Mary Parish, Louisiana (ED 26-005) NOTICE: THIS IS A PRE-SOLICITATION NOTICE ONLY. THIS IS NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME. NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS SYNOPSIS IS SUBJECT TO CHANGE. This procurement is anticipated to be issued as a Total Small Business Set-Aside. The applicable North American Industry Classification System (NAICS) code is 237990. The magnitude of construction is between $500,000 and $1,000,000. DESCRIPTION AND MAGNITUDE OF WORK: The U.S. Army Corps of Engineers (USACE), New Orleans District, is preparing to issue a solicitation for maintenance dredging of the East and West Calumet Floodgate approach channels located in St. Mary Parish, Louisiana. The work consists of the removal of shoal material from within the Wax Lake Outlet approach channels to the East and West Calumet Floodgates and the satisfactory disposal of dredged material into the Wax Lake Outlet channel beyond the -35-foot contour. No dike construction is anticipated. The estimated period of performance is approximately 40 calendar days after receipt of Notice to Proceed. The solicitation will include approximately five (5) drawings and specifications. ACQUISITION INFORMATION: This solicitation will be issued as an Invitation for Bids (IFB) in accordance with FAR Part 14. The resulting contract will be Firm-Fixed-Price (FFP). The solicitation is anticipated to be issued on or about Wednesday, 13 May 2026. SOLICITATION AVAILABILITY: When posted, the solicitation will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF} files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Bidders must check the website periodically for any amendments to the solicitation. REGISTRATION REQUIREMENTS: Bidders shall maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov to be eligible for a Government contract award. If a bidder is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective bidder. Bidders are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration's Subnet, at http://web.sba.gov/subnet. The Contract Specialist for this solicitation is Francesca deBoer who may be reached via email below. POINT OF CONTACT: Contract Specialist: Francesca DeBoer Email: Francesca.E.DeBoer@usace.army.mil | 92% | Pre-Solicitation | 05/13/2026 |
Amendment 0001 issued on July 20, 2022 Amendment 0002 issued on August 09, 2022 Amendment 0003 issued on August 22, 2022 Amendment 0004 issued on August 26, 2022 Abstract of Bids issued on August 30, 2022 Lower Wicomico River Maintenance Dredging at Wicomico County, MD This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00. Total 100% Small Business Set-aside. This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated. | 78% | Solicitation | 08/30/2022 |
75% | Awarded | Open | |
Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011) The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approximately 2.25 million cubic yards of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The work consists of the dredging and disposal of material from the Tiger Pass Ship Channel. Approximately 2.25 million cubic yards of material will be dredged from the channel to restore navigation. The dredged material will be disposed of via pipeline into disposal sites specified in the Plans and Specifications. All disposal sites will be single point discharge. The magnitude of construction is between $10,000,000 and $20,000,000. This requirement is Unrestricted. The solicitation will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF} files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the abovereferenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Bidders must check the website periodically for any amendments to the solicitation. Bidders shall maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov to be eligible for a Government contract award. If a bidder is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective bidder. Bidders are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration's Subnet, at http://web.sba.gov/subnet. Bid date will be established via amendment. | 73% | Solicitation | 07/16/2027 |
Bid Abstract for W912P826BA011 Original Bid Abstract HUBZONE Preference Amendment 0003 for Solicitaion W912P826BA011- Bid opening date has been changed to 27 April 2026 at 11:00 CST. Amendment 0002 for Solicitation W912P826BA011 - Site Visit Amendment 0001 for Solicitation W912P826BA011 Bid opening has been changed to 31 March 2026 at 11:00 A.M. CST QUESTIONS ARE DUE NO LATER THAN 27 FEBRUARY 2026 AT 2:00 P.M. (CST) Solicitation package for W912P826BA011 Drawing for solicitation W912P826BA011 | 72% | Solicitation | 04/27/2026 |
Additional Details
Solicitation Number
W912P824B0053
Archive Date
Oct 3, 2024
Office Address
NEW ORLEANS, LA, 70118-3651