GovChime
Notice ID: f0af5f8f15184d49b32b21a1891e0c41SolicitationArchived

Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

Archived on September 19, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CDT
Posted
September 4, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST NEW ORLEANS
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912P825BA025
Notice ID
f0af5f8f15184d49b32b21a1891e0c41

Description

The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility pipeline removal, construction of access road, drainage, culverts, construction unwatering, and traffic control and coordination. The Magnitude of construction is between $ 25,000,000 and $100,000,000. The solicitation will be available free of charge by electronic posting only and may be found on the System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF} files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://www.sam.gov to download the solicitation for this project. If/when issued, Amendments will be posted to the abovereferenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Bidders must check the website periodically for any amendments to the solicitation. Bidders shall maintain an active registration in the System for Award Management (SAM) database at https://www.sam.gov to be eligible for a Government contract award. If a bidder is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective bidder. Bidders are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration's Subnet, at http://web.sba.gov/subnet. The Contract Specialist for this solicitation is Evan Woitha who may be reached via e-mail at evan.g.woitha@usace.army.mil. -------------------------------------------------------------------------------------------------------------------- 01 August 2025 Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana (ED 21-001), has been amended as follows: 1) Provides time and location for site visit. 2) Establish the deadline of 2:00pm local time, 8 August 2025 for the submission of bidder questions related to this solicitation. Note: The Government intends to provide all responses to bidder questions received by their respectivedeadline on a forthcoming amendment. ***PLEASE ACKNOWLEDGE THIS AMENDMENT AND SUBMIT WITH YOUR BID*** --------------------------------------------------------------------------------------------------------------------- 07 August 2025 Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana (ED 21-001), has been amended as follows: 1. Update Specifications: Section 01 45 00.15 10 - 1.3 CONTRACT ADMINISTRATION. Note: The Government intends to provide all responses to bidder questions received by their respectivedeadline on a forthcoming amendment. ***PLEASE ACKNOWLEDGE THIS AMENDMENT AND SUBMIT WITH YOUR BID*** ------------------------------------------------------------------------------------------------------ 14 August 2025 Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana (ED 21-001), has been amended as follows: 1. THE VIRTUAL BID OPENING, IS NOW SCHEDULED FOR THURSDAY, AUGUST 28, 2025 AT 12:00 PM LOCAL TIME. THE CONTRACTING OFFICER AND CONTRACT SPECIALIST WILL BEGIN DOWNLOADING BIDS AT 10:00 AM LOCAL TIME, WHICH IS THE BID RECEIPT CUTOFF TIME. ALL BIDS RECEIVED AFTER 10:00 AM LOCAL TIME ON THURSDAY, 28 AUGUST 2025 WILL BE CONSIDERED LATE. Note: The Government intends to provide all responses to bidder questions received by their respectivedeadline on a forthcoming amendment. ------------------------------------------------------------------------------------------------------ 27 August 2025 Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana (ED 21-001), has been amended as follows: 1. THE VIRTUAL BID OPENING, IS NOW SCHEDULED FOR THURSDAY, 4 SEPTEMBER 2025 AT 1:00 PM LOCAL TIME. THE CONTRACTING OFFICER AND CONTRACT SPECIALIST WILL BEGIN DOWNLOADING BIDS AT 10:00 AM LOCAL TIME, WHICH IS THE BID RECEIPT CUTOFF TIME. ALL BIDS RECEIVED AFTER 10:00 AM LOCALTIME ON THURSDAY, 4 SEPTEMBER 2025 WILL BE CONSIDERED LATE. 2. To provide answers to contractor questions. 3. Updates and revisions as shown on the attached continuation pages. NOTE: Please be sure to acknowledge all amendments on the SF1442 form as part of your bid submission. --------------------------------------------------------------------------------------------------- 04 September 2025 Bid Opening held on 04 September 2025. Bid Abstract attached.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (7)

  • B01 - W912P825BA025 Bid Abstract.pdf

    234 KBAdded in Solicitation version 12Posted
    Download
  • Solicitation Amendment W912P825BA0250004 SF 30.pdf

    38 MBAdded in Solicitation version 9Posted
    Download
  • Solicitation Amendment W912P825BA0250003 SF 30.pdf

    3.2 MBAdded in Solicitation version 8Posted
    Download
  • A21 - Comite Channel 2B Signed Plans Set.pdf

    54 MBAdded in Solicitation version 6Posted
    Download
  • Solicitation Amendment W912P825BA0250002 SF 30.pdf

    3.2 MBAdded in Solicitation version 6Posted
    Download
  • Solicitation Amendment W912P825BA0250001 SF 30.pdf

    3.2 MBAdded in Solicitation version 5Posted
    Download
  • A21 - W912P825BA025 Solicitation Package.pdf

    6.8 MBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 4
    Version 4PresolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 81d00df616574131ad6c5460acfcb1bc on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 30bb0d8a1883405490afe901d7db7a50 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 1c638900e21e4d78a16aa818ab8b75d9 on SAM.gov

  4. 5
    Version 5SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice abc9da41b0544c02b78b84cbec0c08e9 on SAM.gov

  5. 6
    Version 6SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice c2f5cee7e6924f9dbf6e3aaf88229a42 on SAM.gov

  6. 7
    Version 7SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice d6d786e49d134701a53739c5c7683fa3 on SAM.gov

  7. 8
    Version 8SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 880dcb31a67a41b1835ac3238a9fe761 on SAM.gov

  8. 9
    Version 9SolicitationArchived

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 2f9a8b227d754dc588adedc334180629 on SAM.gov

  9. 12
    Version 12SolicitationArchivedCurrent

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice f0af5f8f15184d49b32b21a1891e0c41 on SAM.gov

  10. 13
    Version 13Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Flood Control, Amite River and Tributaries, LA, Comite River Basin, Comite River Diversion Project, Channel Reach 2B, East Baton Rouge Parish, Louisiana ED 21-001

    Notice 4ac97073fbfb40f4a20eb60a8423f755 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912P825BA025

Archive Date

Sep 19, 2025