GovChime
Notice ID: ce321dad9c9971ef534c7aeb705fe0b3Special Notice

99--Purchase and Delivery of Pins, Rollers Bushings and Side Bars For L27 Lift Gate Chains Replacement Parts.

Archived on June 10, 2012. Full description on SAM.gov.

Overview

Posted
March 12, 2012
Notice type
Special Notice
NAICS
332312: Fabricated Structural Metal Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ST LOUIS
Place of performance
USACE District St. Louis ATTN: CEMVS-CT, 1222 Spruce Street St. Louis MO 63103-2833 US
PSC
99: MISCELLANEOUS
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912P912B0201
Notice ID
ce321dad9c9971ef534c7aeb705fe0b3

Description

*******THIS COMBINED SYNOPSIS/SOLICITATION HAS BEEN EXTENEDED TIL 26 MARCH 2012***** An amendment will be posted this week pertaining to this Invitation for Bid. Please contact Twila Hopkins at 314-331-8124 for any questions or concerns.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Twila A. Hopkins, 314-331-8124 USACE District St. Louis

Documents

No documents available.

Lifecycle

Solicitation:W912P912B0201
  1. Combined Synopsis
  1. 3×
    Combined SynopsisFeb 8, 2012

    99--Purchase and Delivery of Pins, Rollers Bushings and Side Bars For L27 Lift Gate Chains Replacement Parts

    Notice 5848bf5a9c343b91d28d0bb9c4612e84 on SAM.gov

  2. Special NoticeCurrentMar 12, 2012

    99--Purchase and Delivery of Pins, Rollers Bushings and Side Bars For L27 Lift Gate Chains Replacement Parts.

    Notice ce321dad9c9971ef534c7aeb705fe0b3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted. Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height. This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted. An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am.
-Combined Synopsis11/02/2026
11/10/2026: SOLICITATION AMENDMENT 0004 POSTED Solicitation amendment W912EF27QA011-0004 has been added. See amendment 0004 attachments for details _____________________________________________ 11/9/2026: SOLICITATION AMENDMENT 0003 POSTED Solicitation amendment W912EF27QA011-0003 has been added. See amendment 0003 attachments for details __________________________________________ 11/5/2026: SOLICITATION AMENDMENT 0002 POSTED: Solicitation amendment W912EF27QA011-0002 has been added to correct measurement in CLIN 0003 and clarify delivery location address. See attached for details ____________________________ SOLICITATION AMENDMENT POSTED: 11/2/2026: Solicitation amendment W912EF27QA011-0001 has been added to correct measurement in CLIN 0001 See attached for details _______________ LMA Diffuser Grating See attachments for Soliciation package requirements.
-Combined Synopsis11/13/2026
This solicitation provides for the purchase of materials outlined below in the attached Scope of Work.
-Solicitation11/16/2026
This solicitation provides for the purchase of materials outlined below. Material must be delivered within 8 weeks of the award date.
-Solicitation11/16/2026
Firm Fixed Priced Competive Contract Awarded
-AwardedOpen

Additional Details

Solicitation Number

W912P912B0201

Archive Date

Jun 10, 2012