GovChime
Notice ID: 74b1389e9ab61aedef94929bbf0ee70dJustification and Approval (J&A)Awarded

Z--Navigation Channel Rock and Sediment Dredging Mississippi River, River Miles 47-39

Awarded on December 7, 2012. Full description on SAM.gov.

Overview

Posted
January 24, 2013
Notice type
Justification and Approval (J&A)
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST ST LOUIS
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Dec 7, 2012
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
W912P913R0707
Notice ID
74b1389e9ab61aedef94929bbf0ee70d

Description

Removal of Rock Pinnacle at the Thebes Reach located at river miles 47-39 on the Middle Mississi River.

Full description on SAM.gov

Award Overview

Award Number

W912P913C0402 W912P913C0403

Award Amount (SAM.gov award notice)

Not specified

Award Date

Dec 7, 2012

Awardee

Not specified

Original Solicitation

Notice ID: 74b1389e9ab61aedef94929bbf0ee70d

Posted Date: Jan 24, 2013

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Treniece Stith, 314-331-8520 USACE District St. Louis

Documents

No documents available.

Lifecycle

Solicitation:W912P913R0707
  1. Awarded

This opportunity has been awarded.

  1. OtherCurrentJan 24, 2013

    Z--Navigation Channel Rock and Sediment Dredging Mississippi River, River Miles 47-39

    Notice 74b1389e9ab61aedef94929bbf0ee70d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach.
88%
Solicitation11/20/2026
***Amendment 0001 The purpose of this amendment is to provide Government answers to Bidder Inquiries and a revision to Section 3.3.2 No Work Stages of the specifications. Also, this amendment will remove DFARS Clause 252.215-7009 and add FAR Clause 52.222-34 as a full text. Response deadline of 01 June 2026 at 10am CST will not be extended. All other Terms and Conditions will remain unchanged. The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane.
79%
Special Notice06/01/2026
***Amendment 0001 The purpose of this amendment is to provide Government answers to Bidder Inquiries and a revision to Section 3.3.2 No Work Stages of the specifications. Also, this amendment will remove DFARS Clause 252.215-7009 and add FAR Clause 52.222-34 as a full text. Response deadline of 01 June 2026 at 10am CST will not be extended. All other Terms and Conditions will remain unchanged. The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane.
79%
Solicitation06/01/2026
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane.
79%
Pre-Solicitation05/18/2026
The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC) requires a contract to provide maintenance dredging for (3) dredging projects. The areas of consideration for these dredging services are: Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor.Calcasieu River Bar Channel: Work for the Calcasieu River Bar Channel will require one fully crewed and equipped self-propelled trailing suction type hopper dredge. The dredge must have the capability to dredge maintenance material up to a depth of -45ft MLLW and place dredged material into the Ocean Dredge Material Disposal Sites (ODMDS).Pascagoula Harbor: Work for the Pascagoula Harbor maintenance dredging will require a hopper dredge. The dredge must have the capability to dredge maintenance material up to a depth of -46 ft MLLW and place dredged material in the Ocean Dredge Material Disposal Site (ODMDS). Dredged material shall be placed within Pascagoula ODMDS. The transport distance to the designated placement area varies depending on dredge assignment but typically is within 3-5 miles of the dredge cut.Panama City Harbor: Work for the Panama City Harbor maintenance dredging will require a medium to small hopper. The dredge must have the capability to dredge maintenance material up to a depth of -40 ft MLLW and place dredged material within channel adjacent to the entrance jetty. Dredged material shall be placed within the channel adjacent to the jetty. The transport distance to the designated placement area varies depending on dredge assignment but typically is within one mile of the dredge cut. The following will be the performance periods:Calcasieu River Bar Channel: 15 January 2027 to TBDPascagoula Harbor: 01 April 2027 to 30 September 2027Panama City Harbor: 01 August 2027 to 30 September 2027This solicitation is unrestricted. The contract issued will be Firm Fixed Price. This solicitation will be issued in electronic format only and will be available on or about 23 October 2026. The bid opening date will be specified in the solicitation when it is issued. No additional media (CD-ROM, floppy disks, facsimiles, etc.) will be provided. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. The North American Industry Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction and the size standard is $37,000,000.00. Offerors must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from any Government solicitation. Call 1-866-606-8220 for more information or visit the SAM website at www.sam.gov. After completing SAM, in order to download documents contractors and their subcontractors must register at www.sam.gov. In order to locate solicitation, Contractors can go to www. sam.gov and search for the solicitation number.Contractors can register to be put on a plan holders list that others can access through the www.sam.gov website. It is the Offerors responsibility to check the Internet address provided as necessary for any posted changes to this solicitation and all amendments. For additional information or assistance, please contact Cori Caimi, Contract Specialist, email cori.a.caimi@usace.army.mil or Rosalind Shoemaker, Contracting Officer, phone (910) 251-4436, email rosalind.m.shoemaker@usace.army.mil.
78%
Solicitation12/07/2026

Additional Details

Solicitation Number

W912P913R0707

Archive Date

Feb 23, 2013