Notice ID: 9802c5d3b77f4c7c8bf98474fe16f897Special Notice
SPIRE MISSOURI INC. GAS LINE RELOCATION
Archived on July 22, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−05:00
- Posted
- July 13, 2023
- Notice type
- Special Notice
- NAICS
- 237120: Oil and Gas Pipeline and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST ST LOUIS
- Place of performance
- Hazelwood, MO, 63042
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912P923R0016
- Notice ID
- 9802c5d3b77f4c7c8bf98474fe16f897
Description
USACE St Louis District intends to sole source the following action, in accordance with FAR 6.302-1. Relocate a 16 in. diameter SF natural gas line main from the North side of McDonnell Blvd. to the South side of McDonnell Blvd. Remediation will be performed at the McDonnell Bridge over Coldwater Creek and at McDonnell Blvd. from the east end parking lot entrance of the Guest, Keen & Nettlefolds (GKN) Aerospace North America Inc. to the intersection of Eva Road and McDonnell Blvd. The St. Louis County, Missouri, agreed to provide a road closure to facilitate the remediation effort at and around the bridge over Coldwater Creek and along this alignment of McDonnell Blvd. This natural gas line is owned and controlled by SPIRE Missouri, Inc. A more concise description on the relocation of the 16-inch diameter steel main will be as follows: Install 4,410 linear feet of 16 in. Steel (ST) SF Main on the South side of James S. McDonnell Blvd. Install 110 linear feet of 8 in. ST SF Main and Install 180 linear feet of 2 in. ST SF Main along the south side of James S. McDonnell Blvd. Abandon 3,910 linear feet of 16 in. ST SF Main and 95 linear feet of 8 in. ST SF Main along the north side of James S. McDonnell Blvd. SPIRE Missouri Inc. has indicated that it will require a seven-month duration. It includes but is not limited to procurement of material, site preparation, field work, installation, and abandonment of pipe.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912P923R0016- Pre-Solicitation
- Pre-SolicitationMar 29, 2023
SPIRE MISSOURI INC. GAS LINE RELOCATION
- 2×Special NoticeCurrentMay 18, 2023
SPIRE MISSOURI INC. GAS LINE RELOCATION
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks. | - | Solicitation | 01/25/2027 |
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection. | - | Solicitation | 10/20/2026 |
*24 September 2026: This amendment publishes a change in the Scope of Work and updated CLIN Schedule due to funding. Updated proposals are due on 30 September 2026, no later than 02:00 PM CDT._______________________*...... *8 September 2026: This amendment publishes a change in the Scope of Work, provides an additional drawing for the temporary tanks, and extends the due date for the proposal to 22 September 2026. ______________________*.....*21 August 2026: This amendment is to extend the due date for the proposal to 4 September 2026 and post the sign in sheet for the Site Visit._________________* This project includes performing repairs and maintenance to one vertical aboveground storage tank at Los Alamitos AFB, in California. The contractor shall phase their work to minimize disruption to existing fuels operations. The repairs and maintenance items shall be performed to comply with API 653 and all applicable design criteria and standards. | - | Solicitation | 09/30/2026 |
********************************************************************************** This amendment is to update the response date to 10:00 AM (AST) Thursday, 8 October 2026. ********************************************************************************** SOURCES SOUGHT - REQUEST FOR INFORMATION FREEDOM CONNECTION NATURAL GAS PIPELINE THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL (RFP) OR INVITATION FOR BID. This announcement seeks information from industry which will be used for preliminary planning purposes. This is not a solicitation for proposals, and no contract will be awarded from this synopsis. No solicitation, specifications or drawings are available at this time. 1.0 Introduction and Purpose The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA) is conducting market research for the construction of the Freedom Connection Natural Gas Pipeline in Puerto Rico. The results of this market research will help determine the final procurement strategy. USACE-SAA is issuing this follow up Request for Information due to changes in the design, scope of work and acquisition strategy. This request is to gain knowledge of interest, capabilities, and qualifications of Small Business concerns, certified HUBZone, 8(a), Woman-Owned Small Businesses, Economically Disadvantaged Woman-Owned Small Business, Service-Disabled Veteran Owned Business or Veteran-Owned Small Business. The responses or submissions will be used for informational and planning purposes only and do not constitute a commitment by the Government. The Government will not pay for any information submitted, and respondents will not be notified of the results. Submission or responses to this request for information is not a prerequisite for any potential future offerings. 2.0 Background The U.S. Department of Energy (DOE) is funding the Freedom Connection Project. The objective is to enhance the resilience of Puerto Rico’s northern power grid by improving fuel infrastructure. This project involves constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the existing San Juan liquid natural gas (LNG) terminal. SAA anticipates soliciting and awarding one (1) design-bid-build solicitation in accordance with Federal Acquisition Regulation (FAR) Parts 15 and 36. The North American Industry Classification System (NAICS) Code is 237120 - Oil and Gas Pipeline and Related Structures Construction. The small business size standard for this NAICS code is US $45 million. The estimated magnitude of construction is between $25,000,000 and $100,000,000. Anticipated award date is in the second quarter of Fiscal Year 2027. Performance Period is 365 calendar days from NTP. 3.0 Scope of Work The scope of work includes all integrated procurement, labor, equipment, and services required to construct and commission the new pipeline based on a forthcoming final engineering design. Core responsibilities include: • Materials Procurement: Procure all necessary items, including long-lead items such as 20” steel pipe, valves, fittings, and instrumentation, ensuring compliance with the final design and industry standards. • Site Work: Prepare access roads and rights-of-way, and perform site clearing, grading, and stabilization. • Pipeline Installation: Execute all installation activities, including: Trenchless methods (e.g., Horizontal Directional Drilling - HDD). Open trench cut-and-cover installation. Pre-fabrication of materials. Pipeline welding, non-destructive testing (NDT), and inspection. Application of protective external coatings. Above-grade pipeline installation, potentially requiring more than 50 feet deep concrete piles. • Facilities Construction: Build all standalone facilities, including mainline block-valve stations and pig launcher/receiver stations, including electrical and instrumentation. • Delegated Design: Manage and execute any potentially delegated design elements (e.g., temporary works, trench shoring, specialized HDD drill profiles, or structural supports), including coordination with and sealing by licensed Professional Engineers. • Testing and Commissioning: Perform hydrostatic pressure testing, leak detection, and all pre-startup commissioning protocols. • Restoration and Handover: Restore all disturbed areas and formally transfer the completed pipeline and facilities to the owner/operator. 4.0 Requested Information for Capability Statement Interested firms must submit a capability statement (limited to 10 pages) that addresses the following. Responses should be tailored to demonstrate the firm's ability to successfully manage and execute this integrated procurement and construction project. Corporate Information & Experience 1. Company Profile: Provide your firm's name, address, point of contact (POC), CAGE Code, and Unique Entity Identifier (UEI). 2. Business Category: Specify your firm's socioeconomic status (e.g., Small Business, Service-Disabled Veteran-Owned Small Business (SDVOSB), HUBZone, 8(a), Woman-Owned Small Business). 3. Bonding Capacity: Include documentation from your bonding company showing current single and aggregate performance and payment bond limits. 4. Project Experience: Interested construction firms may provide no more than three (3) example projects where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. Projects similar in scope to this project include: Natural gas pipeline project of similar magnitude and complexity where your firm was responsible for both materials’ procurement and construction. Civil projects involving trenchless technologies like HDD, and work in dense urban or environmentally sensitive areas. Each project must comprise of detailed scope of the work, performance timeline, dollar value, customer name. Construction of pipelines of more than 1 mile in length including trenchless pipeline installation, including horizontal directional drilling, jack and bore, and other trenchless technologies. 5.0 Submission Instructions • Deadline: Responses must be submitted via email no later than 10:00 AM (AST), Tuesday, 24 September 2026. • Email To: Angel.J.Martinez@usace.army.mil and Meranda.R.Booth@usace.army.mil. • Format: No hardcopy or facsimile submissions will be accepted. The capability statement shall be limited to ten (10) pages. Any commercial brochures or currently existing marketing material may also be submitted. | - | Special Notice | 10/08/2026 |
This acquisition includes repairs and maintenance of three vertical above ground tanks located at Fort Hood, Texas. | - | Pre-Solicitation | 10/01/2026 |
Additional Details
Solicitation Number
W912P923R0016
Archive Date
Jul 22, 2023
Office Address
SAINT LOUIS, MO, 63103-2833