GovChime
Notice ID: 33d0f197e84f47f591f722f092de058cSolicitation

Alcoa Aluminum Plant Dike Phase II

Archived on August 27, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−07:00
Posted
August 13, 2021
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W075 ENDIST LOS ANGELES
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912PL21B0004
Notice ID
33d0f197e84f47f591f722f092de058c

Description

Amendment 0001 Issued on 7/19/2021 - Solicitation due date updated to 30 July 2021 - FIO 2 DDR Addendum 2021 updated Amendment 0002 iussed on 7/27/2021 - Soliciation Due date updated to 5 August 2021 Amendemnt 0003 issued on 7/29/2021 - Soliciation Due date remains 5 August 2021 Amendment 0004 issued on 8/3/2021 - Solicitation Due date Updated to 12 August 2021 Amendment 0005 Issued on 8/6/2021 - Soliciation due date remains 12 August 2021 Bid Abstract : Posted on 8/13/2021 Alcoa Dike Phase 2, Corona, Riverside County, CA The project is approximately 3,000 linear feet earthen filled dike flood control structure. The elevation of the top of the dike varies between elevations 569.50 and 573.50. The dike will have the following basic characteristics: average height of 22 feet above existing ground, width of crest is 15 feet, 2.25 horizontal to 1 vertical (2.25H:1V) side slopes, upstream slope will be protected with 15-inch layer of riprap over a 12-inch layer of bedding, downstream slope will be hydroseeded. Butterfield Drive, W. Rincon Street, and Auburndale Street will be impacted by the construction of the dike. A concrete floodwall and floodgate will be constructed across Auburndale Street. Butterfield Drive will be modified and a new connector road constructed to connect to Rincon Street. Total Period of Performance is 1095 Calendar Days. Completion of Bid Item’s 0001 through 0032, 0034, and 0036 through 0038 will be within the first 730 Calendar Days. Completion of Bid Item 0033 and 0035 Landscape Establishment and 0034 Borrow Area Closure will be 365 Calendar Days and be completed prior to the end of the Total Period of Performance period.” The Estimate cost range for this procurement is $10,000,000 - $25,000,000. This procurement is a 100% total Small Business Set Aside. The NAICS Code is 237990 "Other Heavy and Civil Engineering Construction. The size Standard is $39,500,000.00. Be advised this project may delayed, postponed, canceled or revised at any time prior to award.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912PL21B0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMay 21, 2021

    Alcoa Aluminum Plant Dike Phase II

    Notice e5eae10f89f847fb8251d73d9bedc4f8 on SAM.gov

  2. 11×
    SolicitationCurrentJun 25, 2021

    Alcoa Aluminum Plant Dike Phase II

    Notice 33d0f197e84f47f591f722f092de058c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912PL21B0004

Archive Date

Aug 27, 2021

Office Address

LOS ANGELES, CA, 90017-3409