Notice ID: 33d0f197e84f47f591f722f092de058cSolicitation
Alcoa Aluminum Plant Dike Phase II
Archived on August 27, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−07:00
- Posted
- August 13, 2021
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST LOS ANGELES
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912PL21B0004
- Notice ID
- 33d0f197e84f47f591f722f092de058c
Description
Amendment 0001 Issued on 7/19/2021 - Solicitation due date updated to 30 July 2021 - FIO 2 DDR Addendum 2021 updated Amendment 0002 iussed on 7/27/2021 - Soliciation Due date updated to 5 August 2021 Amendemnt 0003 issued on 7/29/2021 - Soliciation Due date remains 5 August 2021 Amendment 0004 issued on 8/3/2021 - Solicitation Due date Updated to 12 August 2021 Amendment 0005 Issued on 8/6/2021 - Soliciation due date remains 12 August 2021 Bid Abstract : Posted on 8/13/2021 Alcoa Dike Phase 2, Corona, Riverside County, CA The project is approximately 3,000 linear feet earthen filled dike flood control structure. The elevation of the top of the dike varies between elevations 569.50 and 573.50. The dike will have the following basic characteristics: average height of 22 feet above existing ground, width of crest is 15 feet, 2.25 horizontal to 1 vertical (2.25H:1V) side slopes, upstream slope will be protected with 15-inch layer of riprap over a 12-inch layer of bedding, downstream slope will be hydroseeded. Butterfield Drive, W. Rincon Street, and Auburndale Street will be impacted by the construction of the dike. A concrete floodwall and floodgate will be constructed across Auburndale Street. Butterfield Drive will be modified and a new connector road constructed to connect to Rincon Street. Total Period of Performance is 1095 Calendar Days. Completion of Bid Item’s 0001 through 0032, 0034, and 0036 through 0038 will be within the first 730 Calendar Days. Completion of Bid Item 0033 and 0035 Landscape Establishment and 0034 Borrow Area Closure will be 365 Calendar Days and be completed prior to the end of the Total Period of Performance period.” The Estimate cost range for this procurement is $10,000,000 - $25,000,000. This procurement is a 100% total Small Business Set Aside. The NAICS Code is 237990 "Other Heavy and Civil Engineering Construction. The size Standard is $39,500,000.00. Be advised this project may delayed, postponed, canceled or revised at any time prior to award.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Suntok McGuinness
Documents
No documents available.
Lifecycle
Solicitation:
W912PL21B0004- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationMay 21, 2021
Alcoa Aluminum Plant Dike Phase II
- 11×SolicitationCurrentJun 25, 2021
Alcoa Aluminum Plant Dike Phase II
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912PL21B0004
Archive Date
Aug 27, 2021
Office Address
LOS ANGELES, CA, 90017-3409