Notice ID: 5b0ae067ee4a46b9b5b7ba3992228bcfSolicitationArchived
Murrieta Creek Phase 2B
Archived on July 2, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PDT
- Posted
- July 7, 2025
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W075 ENDIST LOS ANGELES
- Place of performance
- Murrieta Creek, Riverside County, CA, Temecula, 92590
- Last updated
- Nov 12, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912PL25BA004
- Notice ID
- 5b0ae067ee4a46b9b5b7ba3992228bcf
Description
Be advised that the bid abtract has been uploaded in the attachments section of this announcment. ***BID OPENING PARTICIPATION INSTUCTIONS***see attachment for Meeting instructions and call in number***Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
Bid Abstract_W912PL25BA004_Murrieta Creek-Phase 2B__2July2025-ko Signed.pdf
405 KBAdded in Solicitation version 11Posted
Links (4)
- PIEE Solicitation Module Link for W912PL25BA004piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1SolicitationArchived
Murrieta Creek Phase 2B
- 2Version 2SolicitationArchived
Murrieta Creek Phase 2B
- 3Version 3SolicitationArchived
Murrieta Creek Phase 2B
- 4Version 4SolicitationArchived
Murrieta Creek Phase 2B
- 5Version 5SolicitationArchived
Murrieta Creek Phase 2B
- 6Version 6SolicitationArchived
Murrieta Creek Phase 2B
- 7Version 7SolicitationArchived
Murrieta Creek Phase 2B
- 8Version 8SolicitationArchived
Murrieta Creek Phase 2B
- 9Version 9SolicitationArchived
Murrieta Creek Phase 2B
- 11Version 11SolicitationArchivedCurrent
Murrieta Creek Phase 2B
Other notices for this solicitation
- Pre-SolicitationRelated noticeApr 18, 2025
Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration
- Pre-SolicitationRelated noticeApr 21, 2025
Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912PL25BA004
Archive Date
Jul 2, 2026
Office Address
LOS ANGELES, CA, 90017-3409