Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
Archived on December 20, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EST
- Posted
- November 13, 2025
- Notice type
- Sources Sought
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.W072 ENDIST LOUISVILLE
- Place of performance
- Jolon, California
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR-25-PWT-FHL
- Notice ID
- 51084af0b04c4852b6fbc930d65a1ee5
Description
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately.
Project Location: Fort Hunter Liggett, CA
Project Description: This is a Design Build project to Modernize the Fort Hunter Liggett (FHL) Potable Water Transmission and Storage Infrastructure by:
1) Installation of a new dedicated 5.25 mile 20-inch transmission line of high-density polyethylene (HDPE) from potable water well field parallel to the existing failing 12-inch pipeline. The new transmission line will be installed adjacent to the gravel road, with required separation to prevent accidental damage to the existing potable water main during construction and future repairs. The new HDPE transmission line will provide increased resiliency via increased flow and pressure criteria as well as fusion welded joints that are inherently restrained from thrust forces that can cause pipe joints to separate.
2) Installation of two new Storage Tanks (2.06 Mgal total capacity) along a ridge above FHL at an elevation of 1,250 ft (with provisions for future expansion). The new Storage Tank site design is based on the recommendations per the Jacobs Engineering Design Analysis Report (May 30, 2024). The new Storage Tanks will modernize the existing 1.2 Mgal to provide the required volume to meet current National Fire Protection Association (NFPA) and California Fire Suppression standards of 2.0 Mgal.
3) Construction of a 4,500 ft access road to access the new Storage Tank site. The 35% design recommended by the Geotechnical Engineer recommends the Storage Tank site's access road grade not exceed 10% to avoid issues with vehicle traction in wet weather. This site constraint is reflected in the cost estimate.
4) Upgrades to existing antiquated Potable Water Source Well facilities including ancillary equipment and building repairs including: chemical feed equipment, HVAC, life safety, security, SCADA-controls, and backup power systems.
Contract duration is estimated at 540 calendar days. The estimated cost range is between $25,000,000 and $100,000,000. NAICS code is 237110. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business contractors should respond to this survey via the link below by Friday, 05 December 2025 by 3:00 PM Eastern Standard Time.
Responses should include:
- Identification and verification of the company’s small business status.
- Contractor’s Unique Entity Identifier (UEI).
- Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
- Description of Experience – Provide descriptions on up to three (3) projects completed by you as the prime contractor or if the offeror is a Small Business, they can provide Past Performance of affiliates in accordance with DFARS 215.305(a)(2)(C). To be relevant, the projects submitted should be greater than 90% construction complete or completed within the last five (5) years and are similar to this project in scope and complexity. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance.
Projects similar in Scope to this project include: Replacement of existing self-contained water supply systems to include water transmission lines, water tanks, upgrades/replacement to existing pumps, wells, ancillary facilities and access roads.
Projects similar in size to this project include: Projects with a minimum of 4 miles of 18-inch or larger potable water transmission line and a storage tank of at least 1.5 Mgal capacity.
Based on definitions above, for each project submitted include:- Current percentage of construction complete and the date when it was or will be completed.
- Size of the project (include lineal footage of waterline replaced, tank sizes and building sizes at a minimum)
- Scope of the project
- The dollar value of the construction contract
- The percentage of work that was self-performed.
- Whether the project was design build or design/bid/build
- Identify the number of subcontractors by construction trade utilized for each project
- Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement.
Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Survey Form can be accessed at https://forms.osi.apps.mil/r/WMxJ4gi0Lf or via the QR Code provided in the attachments on this SAM.gov posting.This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey.
NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
QR Code.pdf
18 KBAdded in Sources Sought version 1Posted
Lifecycle
- 1Version 1Sources SoughtArchived
Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
- 2Version 2Sources SoughtArchived
Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
- 4Version 4Sources SoughtArchivedCurrent
Fort Hunter Liggett (FHL) - Modernize Potable Water Transmission and Storage Infrastructure
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction (Note: While Other Transaction Authority is not subject to FAR-based small businesIntells regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to restore and modernize the potable water system and wastewater collection system throughout the Fort Hunter Liggett Installation. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional and modernized potable water and wastewater systems on the Installation. The Fort Hunter Liggett water distribution system dates back to the 1950’s with a few areas believed to be even older and includes a three (3) well configuration that has sufficient pumping capacity to serve current supply demands, however, the water transmission system is undersized to satisfy the demand of the system. While the current water system storage may be sufficient for normal operation, it cannot sustain the system for more than one day in the event of a pump outage and/or fire flow event during maximum day conditions; therefore, additional system storage is necessary. A new Tank Farm with adequate storage capacity (estimated to be a minimum of 2 million gallons) to be determined and validated in accordance with NSPC, UFC, and NFPA criteria, should be in vicinity of security fence gate 10 (Lat: 35.997638° , Long: -121.224355°). Currently the primary storage tank for the potable water system is on the opposite side of the cantonment from the wells and the transmission main and distribution are combined causing significant pressure variations far in excess of industry standard, causing accelerated deterioration of system components. Many pipelines, valves, and hydrants within the distribution system have currently exceeded their useful life expectancy and have failed or failing. High operating pressures place additional strain on this aging system, requiring operational improvements as well as rehabilitation/replacement of existing assets. Modernizing SCADA components are necessary to increase efficiency and updated to cover any system revisions and future improvements. SCADA infrastructure improvements shall integrate into the existing SCADA infrastructure. Fort Hunter Liggett’s wastewater collection system was installed around the same time as the water potable system. Due to the age of the system and deterioration, replacement and rehabilitation of sanitary sewer lines, manholes, and the waste treatment plant lagoon are needed to return the system to be fully functional and code compliant. The wastewater treatment plant relies on a series of lagoons to treat sewage. There are lagoons that have operational deficiencies and require the replacement of the impermeable liner. In addition, the lagoon currently lacks baffles, which are essential for directing the flow of wastewater in a way that maximizes treatment time and prevents "short circuiting". Estimated Acquisition Magnitude: $70-$80M PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. Currently, the Government has advanced a conceptual design for the following potable water system features below. New transmission main to connect the existing well field to the main distribution system within the cantonment area. New storage infrastructure as required to satisfy requirements for fire safety, emergency needs, and operational storage. Upgrades to existing water supply wells to enhance water-supply reliability and redundancy. A Technical Assessment Report of the condition of Fort Hunter Liggett’s utilities systems and modernization recommendations of the water and sanitary sewer systems was completed in June 2024. The onsite assessments used in developing the Technical Assessment Report were conducted November 28-December 7, 2023. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. The PDB Course of Action (10 U.S.C. § 2808a): The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. Most highly qualified firm following pitch meetings would be selected to enter into negotiations. The OT Award would be two phases: Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Hunter Liggett Waterline Q12. Describe your experience/expertise with water and wastewater utility construction. Q13. What are the greatest supply chain, scheduling, or technical risks you foresee on a project of this type at Fort Hunter Liggett, and how could the PDB delivery method help mitigate? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/Lmjbdft8rU or via the QR Code provided in the attachment. Please submit your responses by 03 November 2026 at 1:00 PM Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | 82% | Market Research | 11/03/2026 |
Login at https://piee.eb.mil and search for 'W90VN726QA007' to obtain more details.* | 69% | Combined Synopsis | 07/13/2026 |
USACE Rock Island hereby awards contract W912EL26CA034 from solicitation W912EK26BA017. | 66% | Awarded | Open |
This announcement constitutes a Pre-Solicitation notice (SYNOPSIS) in accordance with Revolutionary FAR Overhaul (RFO) Subpart 5.2. The U.S. Army Corps of Engineers (USACE), Honolulu District hereby announces its intent to issue a solicitation entitled, Elevated Water Storage Tanks, Kolekole and East Range, Schofield Barracks, Oahu, Hawaii as described within this announcement.See attached Pre-Solicitation Notice for more information. | 65% | Pre-Solicitation | Open |
The U. S. Army Corps of Engineers, St. Louis District proposes to provide Federal construction assistance to Metropolitan St. Louis Sewer District for the rehabilitation of combined sewers. The subject project consists of sewer rehabilitation utilizing Cured-In-Place Pipe (CIPP) methods. The rehabilitation work is generally described within of the Metropolitan St. Louis Sewer District specifications as follows: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform sewer rehabilitation of approximately 2,675 lineal feet of sewers, sized at 21 inches in diameter to 24 inches in diameter utilizing CIPP methods. The project is within the MSD Boundaries, which includes the City of St. Louis and St. Louis County, Missouri. The work will be performed in various quantities at various sites. The initial work identified is in MSDs Service Area 1. Refer to W912P926BA008 for Pre-Solicitation Notice. | 63% | Awarded | Open |
Additional Details
Solicitation Number
W912QR-25-PWT-FHL
Archive Date
Dec 20, 2025
Office Address
LOUISVILLE, KY, 40202-2230