ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power
Archived on January 21, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EST
- Posted
- December 18, 2025
- Notice type
- Sources Sought
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
- Place of performance
- Independence, Missouri
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR-26-ERCIPLakeCityAAP
- Notice ID
- a9d93109e71d43febba1f4b58fc82814
Description
Market Survey Questionnaire
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business, and you are interested in this project please respond appropriately.
- Project Title: Lake City Army Ammunition Plant Microgrid and Backup Power
- Project Location: Lake City Army Ammo Plant, Missouri
- Project NAICS Code: 237130
- Response Date: 6 January 2026
- Short Project Description: Design-Bid-Build (D-B-B) construction of a microgrid system powered by two 7.5 MW combined heat and power (CHP) combustion turbines with dual-fuel capable natural gas and propane fuel systems that make a 15 MW CHP power/heat production plant. The CHP will include heat recovery steam generators (HRSGs) and supplemental exhaust duct firing along with a black start diesel generator. The project will include all electrical distribution equipment and underground duct bank needed to connect to the existing electrical infrastructure. Microgrid controls will be installed to manage various modes of operation to include parallel mode with existing utility, island mode, and black start mode. The microgrid control system will be state of the art and will be integrated with two existing substations at four points of common coupling for seamless operation and load shed capability with the ability to island during a utility grid outage and leverage load shedding to balance microgrid supply and demand during islanded operation, and resynchronization with the grid upon grid restoration. The project will include both electricity microgrid features and simultaneous heat production and steam distribution features. The project will also include installation of two 500-gallon waste water/oil underground storage tanks with double wall interstitial leak monitoring and overfill alarms.
The project will involve installing all piping and equipment needed to connect the CHP to the installation’s existing natural gas, steam, condensate, and water infrastructure and operate in tandem with the installation’s existing central heating plant. The microgrid will have industrial grade controls with a new control room located in the central heating plant. Environmental controls will be through the use of low NOx turbines and duct burners. The project also includes site improvements, demolition, full air permitting, communications, and full commissioning.
All systems will be designed in in accordance with UFC 4-010-06, Cyber Security of Facility-Related Control Systems, and UFGS 25 05 11, Cybersecurity for Facility-Related Control Systems. This project involves the use of Software Defined Networking (SDN). The use of SDN capable industrial grade equipment throughout the control system will provide a deny by default security posture and will fulfill most if not all network related security controls.
- Type of Action: D-B-B
- Estimated Performance Period: 1014 days
- Estimated Cost: The estimated price range is between $25,000,000 and $100,000,000. Please note that the Government expects this project to be on the upper end of that price range.
- Responses should include:
- Identification and verification of the company’s small business status.
- Contractor’s Unique Entity Identifier Number and CAGE Code(s).
- Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
- Descriptions of Experience: Interested construction firms must provide no more than three (3) example projects that have either been completed in the past five (5) years or are substantially complete, defined as being greater than 95 percent complete, where the interested firm served as the prime contractor. Example projects should demonstrate similarity in scope and size to the requirements outlined. Projects similar in scope (in descending order of importance) shall demonstrate the majority, but not all, of the following elements below.
Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance.
Each feature listed under "Projects similar in scope" directly corresponds to the similarly numbered feature listed under "Projects similar in size." For example, Scope Feature #1 corresponds to Size Feature #1, Scope Feature #2 corresponds to Size Feature #2, and so forth.
- Projects similar in scope (in descending order of importance):
- Construction of Combined Heat and Power (CHP) Turbines with one or more Heat Recovery Steam Generators (HRSG).
- Construction of a new microgrid control system.
- Master systems integrator experience in testing, troubleshooting, controlling, and commissioning complex Microgrid systems.
- Experience with one or more natural gas compressors and/or a system of propane tanks and vaporizers.
- Steam generation, steam distribution, and condensate return piping systems on an installation-wide scale using heat recovery steam generators (HRSGs) or boilers.
- Experience with fiber optic-based SCADA communication systems.
- Site Improvement experience to include installation of site underground electric utility lines, site natural gas utility lines, above ground steam lines, and structural support for pipe bridges and large outdoor equipment.
- Projects similar in size:
- Combined Heat and Power (CHP) Turbines with HRSGs with a capacity of at least 5 MW of electrical power and one or more HRSGs totaling at least 30,000 lbs/hr of minimum 100 PSIG steam.
- Microgrid projects that include a new microgrid control system programmed to operate in multiple modes to include utility paralleling, islanding, and black start; power generation controlled by the new microgrid control system; new medium-voltage paralleling switchgear controlled by the new microgrid control system; and the ability to perform load shedding.
- Microgrid projects that include a new microgrid control system programmed to operate in multiple modes to include utility paralleling, islanding, and black start; power generation controlled by the new microgrid control system; new medium-voltage paralleling switchgear controlled by the new microgrid control system; and the ability to perform load shedding.
- One or more natural gas compressors with a combined capacity of at least 300,000 MMBTU at a minimum output pressure of 300 psig and/or a system of propane tanks and vaporizers with a combined capacity of at least 300,000 MMBTU at a minimum output pressure of 300 psig.
- Steam generation, steam distribution, and condensate return piping systems on an installation-wide scale, above 50,000 lbs./hr of minimum 100 PSIG steam.
- Fiber optic-based SCADA communication systems with at least 5,000 linear feet of new fiber optic cabling (measured as the length of new fiber optic cables installed and not as the length of individual fiber optic stands installed).
- Construction of a minimum of 3,000 linear feet of minimum 4” diameter, new natural gas utility distribution lines and/or a minimum of 200 linear feet of minimum 6” diameter above ground steam lines.
- For each project submitted, include:
- Current percentage of construction complete and the date when it was or will be completed.
- Scope of the project.
- Size of the project.
- The dollar value of the construction contract and whether it was design/bid/build or design-build.
- The total percentage of work that was self-performed and a breakout of what portion was project and/or construction management services and what portion was physical construction type work.
- The number of subcontractors utilized by construction trade.
- Please also answer these questions regarding Cybersecurity Maturity Model Certification (CMMC):
- Do you possess a CMMC and at what level (1, 2, or 3);
- If not, when do you expect to obtain CMMC and at what level (1, 2, or 3); and
- Do you project any changes to your CMMC status in the year following issuance of this market survey?
- Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.
Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Survey Form can be accessed at https://forms.osi.apps.mil/r/Y9bKLfYuuw
This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey.
NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (1)
- Access the Market Survey Form hereforms.osi.apps.milPosted
Lifecycle
- 1Version 1Sources SoughtArchived
ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power
- 3Version 3Sources SoughtArchivedCurrent
ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power
- 8Version 8Special NoticeArchived
Type changed from Sources Sought to Special Notice
PLA Survey - ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power
- 10Version 10Special NoticeArchived
Notice of Intent to Sole Source - ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat & Power
- 6Version 6PresolicitationArchived
Type changed from Special Notice to Presolicitation
Pre-Solicitation Notice: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
- 13Version 13PresolicitationArchived
Presolicitation Notice: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This contract was awarded on November 12, 2026 to Martin Brothers Construction for $26,711,770.00. | 77% | Awarded | Open |
Amendment 0004 and RFI Set #4 Posted July 27, 2026***************************Amendment 0003 and RFI Set #3 has been uploaded on July 17, 2026*****************************************************************************The purpose of Amendment 2 is to extend the proposal due date to July 31, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of Amendment 0002. Responses to RFI - Set #2 has been posted. ***********************************The purpose of Amendment 0001 is to extend the proposal due date to July 13, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of the attached amendment. Due to the number of RFIs received, the USACE is still preparing responses and responses will be posted as soon as they are available. A select number of RFIs have been posted with this Amendment. ***************************************************************************************************************************************************************************************************This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE. SEE FAR CLAUSE 52.232-18 AVAILABILITY OF FUNDS. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | 77% | Solicitation | 07/31/2026 |
This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. The solicitation will be available on/about April 15, 2026, for viewing/downloading. All proposals will be due on/about May 15, 2026, at 12:00PM PDT. The specific date and time will be identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | 77% | Pre-Solicitation | Open |
***AMENDMENT 0006: The purpose of this amendment is to remove Greenland from the geographic scope and place of performance of the Power Construction and Services II MATOC. Attachment 2 is revised to remove the Greenland labor coefficient, and Attachment 7 is revised accordingly. The proposal due date remains unchanged. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below.******AMENDMENT 0005: The purpose of this amendment is to incorporate DFARS provision 252.225-7966 and DFARS clause 252.225-7967 into the solicitation and revise the proposal due date from 03 November 2026 at 4:30 P.M. EDT to 03 November 2026 at 4:30 P.M. EST due to daylight savings. To view the amendment access the PIEE Solicitation Module Link for W912BU26RA032 below.******AMENDMENT 0004: The purpose of this amendment is to: (1) Respond to contractor RFIs. (2) Update solicitation attachments. (3) Add FAR 52.222-56, Certification Regarding Trafficking in Persons Compliance Plan (Deviation 2026-O0038). (4) Incorporate disclosures in accordance with Department of Army policy on the Use of Artificial Intelligence in Source Selection and Acquisition Evaluations. (5) Extend the proposal due date to 03 November 2026 at 4:30 P.M. ET. To view the amendment and all revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0003: The purpose of this amendment is to extend the proposal submission due date to 27 October 2026 4:30 PM ET and provide an update on Requests for Information (RFIs). To view the amendment access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0002: The purpose of this amendment is to provide the Governments consolidated responses to contractor Requests for Information (RFIs), and to distribute the presentation slides and attendee list from the Industry Day held on September 17, 2026. Additionally, Attachment 2 - PCS II MATOC Bid Schedule is revised under the EUCOM Labor Coefficients tab to replace Denmark with Kosovo, as Denmark was previously included in error. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below******AMENDMENT 0001: The purpose of this amendment is to incorporate Attachment 10 - 00 74 00 Supplemental Conditions to establish Host Nation compliance requirements for individual orders performed within Turkey, Romania, and Poland. Attachment 7 and Attachment 8 are revised accordingly. Additionally, this amendment corrects various administrative errors and inconsistencies throughout the solicitation. To view the amendment and revised documents access the PIEE Solicitation Module Link for W912BU26RA032 below*** The US Army Corps of Engineers, Philadelphia District (NAP) has issued a Request for Proposal (RFP) for one firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) contract to provide power construction and services in contingency or austere environments in support of temporary or enduring requirements of the United States Government (USG); USG Coalition Forces/Organizations; and Host-Nation Governments/Forces/Organizations within the United States Central Command Area of Responsibility (CENTCOM AOR) and select United States European Command (EUCOM) countries to include Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. A target of three (3) to seven (7) contracts will be awarded to a pool of contractors that will subsequently compete for individual task orders. This Power Construction and Services II Multiple-Award Task Order Contract (PCS II MATOC) will have total shared contract capacity of $249,000,000.00. A virtual industry day will be hosted by the USACE Philadelphia District on 17 September 2026 at 1000 hrs ET. In order to receive a meeting invitation link, offerors must submit a request in writing to the Points of Contact (POC) listed under Requests for Information (RFI) found in Attachment 8 - 00 22 16 PCS II MATOC Proposal Submission and Evaluation Factors AMD 0001 no later than 24 hours prior to the industry day, 16 September 2026 at 1000 hrs ET. Please access the below PIEE Solicitation Module Link for W912BU26RA032 for the solicitation and all attachments. | 73% | Solicitation | 11/03/2026 |
This is a Pre-solicitation Notice (Synopsis) and is for informational purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS. The US Army Corps of Engineers, Philadelphia District (NAP) intends to issue a Request for Proposal (RFP) for one firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) contract to provide power construction and services in contingency or austere environments in support of temporary or enduring requirements of the United States Government (USG); USG Coalition Forces/Organizations; and Host-Nation Governments/Forces/Organizations within the United States Central Command Area of Responsibility (CENTCOM AOR) and select United States European Command (EUCOM) countries to include Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. A target of three (3) to seven (7) contracts will be awarded to a pool of contractors that will subsequently compete for individual task orders. This Power Construction and Services II Multiple-Award Task Order Contract (PCS II MATOC) will have total shared contract capacity of $249,000,000.00. Please access the below PIEE Solicitation Module Link for W912BU26RA032 for more information. | 73% | Pre-Solicitation | 09/08/2026 |
Additional Details
Solicitation Number
W912QR-26-ERCIPLakeCityAAP
Archive Date
Jan 21, 2026
Office Address