Fort Knox Vo-Tech Enabling Project - Sources Sought Notice

Archived on April 7, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
March 6, 2026
Notice type
Sources Sought
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
Place of performance
Fort Knox, Kentucky, 40121
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Notice ID
6ef9f0ddb9534a3895a20aa125b95f05

Description

****** THIS SOURCES SOUGHT NOTICE IS UTILIZING MICROSOFT FORMS FOR RESPONSE SUBMISSION. REFER TO ELECTRONIC SUBMISSION INSTRUCTION BELOW.  

Description:
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately.

Project Location: Fort Knox, Kentucky 40121

Project Description:

Scott Middle School Enabling Project Renovate VoTech Building

Design-Bid-Build (DBB) construction project.  

This project is for the renovation of the Vo-TECH building and associated restrooms for the relocation of the existing Community Superintendent Office (CSO) at Ft. Knox, KY. Total renovation is approximately 9,594 SF. The project also includes all renovation of available spaces in the Ft. Knox MHS Gymnasium to accommodate the relocation of the Weight Room, Storage Space and Wrestling Room from Vo-TECH Building. The project includes the construction of approximately 75-foot-long, 24-foot-wide access road that will connect from the existing parking lot to the rear of the Vo-TECH building.

The CSO is currently located within the MacDonald Elementary School (ES) Building. MacDonald will need to be demolished as part of the upcoming Military Construction project – Scott Middle School. The CSO administrative and storage functions are included in the CSO relocation to the Vo-TECH building on the Ft. Knox campus. These functions include offices for administrative functions as well as storage. The priorities for DoDEA in this enabling project are to get the CSO functions out of MacDonald ES to enable the Scott MS MILCON (FY27) and the site demolition to prevent project delay. The Vo-TECH building is currently being used by the Ft Knox MHS.

Anticipated Period of Performance: 365 calendar days

NAICS code: 236220 Commercial and Institutional Building Construction. Size Determination is $45M.

Disclosure of the Magnitude of Construction Projects: The estimated price range is between $1,000,000 and $5,000,000.

Responses should include:

  1. Identification and verification of the company’s small business status.
  2. Contractor’s Unique Entity Identifier Number and CAGE Code(s).
  3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
  4. Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference.  References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope.

  1. Projects similar in scope shall include: renovation of single or multi-story administrative office buildings.

  1. b. Projects similar in size to this project include: projects with single or multi-story buildings with combined total square footage of 6,500 SF.

c. Based on the information above, for each project submitted, include:

    1. Current percentage of construction complete and the date when it was or will be completed.
    2. Scope of the project. 
    3. Size of the project.
    4. The dollar value of the construction contract and whether it was design/bid/build or design-build.
    5. The percentage of work that was self-performed as project and/or construction management services or physical construction type work.
    6. Identify the number of subcontractors by construction trade utilized for each project.

5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.

NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.

Provide responses or any questions to Jacob Pridemore at Jacob.S.Pridemore@usace.army.mil.  

Please note this is NOT a Request for Proposal and does not constitute any commitment by the Government.

Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.

Electronic Submission Instructions:

Provide responses via Microsoft forms using the link below- 

https://forms.osi.apps.mil/r/XJC21dKv5y

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Fort Knox Vo-Tech Enabling Project - Sources Sought Notice

    Notice 6ef9f0ddb9534a3895a20aa125b95f05 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Design-Build-to-Budget for the Construction of a Staging and Marshalling Area located at Fort Campbell Ky. Estimated Construction cost is between $5,000,000 and $10,000,000 in accordance with DFARS 236.204 NAICS Code is 236220. Size Determination is $45M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM, the business will be considered other than a small business. This is a Small Business Set Aside procurement. Offerors must comply with the requirements of RFO 52.204-7, 52.204-8, 52.232-33, and any other contractor registration and online representations and certification requirements in this solicitation through the System for Award Management (SAM), available at https://sam.gov/. PLEASE NOTE: SAM is completely free of charge for both registrants and users. Amendments will be available from the w website by download only. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
78%
Solicitation09/01/2026
Pre-Solicitation Notice Construct Central Energy Plant, Fort Hood, TX
76%
Pre-Solicitation04/10/2026
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for the design and construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA using Progressive Design-Build (PDB) under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 17 November 2026 at 0900 Pacific Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design-Build (PDB) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. To access Fort Hunter Liggett, please proceed directly to the Main Gate / Access Control Point. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not have a REAL ID, provide your valid State ID/Driver’s License plus a current U.S. Passport. Please state your business intention “attending the U.S. Army Corps of Engineer’s Industry Day at Bldg. 3300”. Individuals with a valid CAC, should be able to access the installation directly. Fort Hunter Liggett Access Control Point Address: 2Q26+W3C Fort Hunter Liggett, CA 93928; or 36°00'08.3"N 121°14'23.5"W II. LOCATION/LOGISTICS Industry Day Presentation location: Building 3300, Classrooms 118 & 119. Parking is at the rear of the building. Overflow parking is located at Longbow St. and Blackhawk St. Fort Hunter Liggett Building 3300 Address: XQX8+V2, Fort Hunter Liggett, CA 93928; or 36°00'00.0"N 121°14'05.9"W USACE Agency Representative Mr. Robert “Bob” Roy – USACE Project Engineer, Sacramento District (831)710-7154 III. PROJECT OVERVIEW Project Title: Design and Construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks Location: Fort Hunter Liggett, California Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 IV. PROJECT DESCRIPTION This acquisition will deliver four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to demolish and dispose of five (5) existing Barracks and replacing with four (4) CTE Barracks and one (1) AST Barracks. Key features of the project may include: Design and construct four (4) multi-story CTE Barracks (approximately 46,000 total SF each), which will feature open bays, along with integrated officers sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Design and construct one (1) multi-story AST Barracks (approximately 45,000 total SF), which will feature sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Demolish and dispose of five (5) existing multi-story Barracks (approximately 39,000 total SF each). V. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District will use a streamlined competitive selection process: Step 1 – White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected to enter exclusive negotiations. The Agreements Officer will request a detailed price proposal for Phase 1 (100% design) and negotiate the design fee, payment milestones, and Agreement Articles. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction, which will be added as a bilateral modification at a later date. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Design/Builder to provide design, preconstruction services, and construction. Phase 1 of the Progressive Design Build agreement will include design development and pre-construction services. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VII. Virtual Participation Opportunity: For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams meeting Join: https://dod.teams.microsoft.us/meet/993167156182?p=0xzCpAMCfJMOR4Ixl1 Meeting ID: 993 167 156 182 Passcode: dd2oQ7zN
75%
Special Notice11/17/2026
Update 0006 is to issue Amendment 0005. // Update 0005 is to issue Amendment 0004. // Update 0004 is to issue Amendment 0003. // Update 0003 is to issue Amendment 0002. // Update 0002 is to issue Amendment 0001. // Update 0001 is to add the Site Visit Sign-in Sheet. // The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for a Military Working Dog Kennel Facility, Fort Hood, Texas. For details, see attached Solicitation located in the PIEE Solicitation Module.
74%
Solicitation07/30/2026
Amendment 0003 // Design-Bid-Build RFP for Construct Central Energy Plant, Fort Hood, TX
73%
Solicitation06/22/2026

Additional Details

Solicitation Number

W912QR_26_MARKETSURVEY_FTK_ENABLING_VOTECH

Archive Date

Apr 7, 2026

Office Address

LOUISVILLE, KY, 40202-2230