Ft. Campbell Rectifier Replacement
Archived on May 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM EDT
- Posted
- May 5, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
- Place of performance
- Fort Campbell, Kentucky
- PSC
- N059: INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR-26-R-A017
- Notice ID
- 75b24e09cafc473f8d40031f55e7ce36
Description
**** Amendment 0003*****
The Solicitation Due date has been extended from 01 MAy 2026 at 1:00pm to 08 May 2026 at 11:00 am Et.
This Amendment also changes the solicitation from Lowest Price Technically Acceptable to just Lowest Price.
**** Amendment 0002*****
The Solicitation Due date has been extended from 24 April 2026 to 01 May 2026 at 1300.
**** Amendment 0001*****
The Solicitation Due date has been extended from 17 April 2026 to 24 April 2026. Site Visit has been added and date is set for 15 April 2026 at 1300 at 95 Bastogne Ave, Fort Campbell, KY 42223.
Please enter through the Visitor Center at Gate 4 and proceed to the building, No forms are needed, just a vilid Real ID/Passport to get on to the base.
________________________________________________________________________________________________________
This requirement is for a complete, turnkey solution to replace obsolete DC power plant systems, including rectifiers and inverters, which are past their useful service life. The selected contractor will be responsible for providing all necessary personnel, equipment, tools, materials, supervision, and transportation to successfully execute the project.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
W912QR26RA017 Amendment 0003.pdf
643 KBAdded in Solicitation version 10Posted - Download
W912QR26RA017 Amendment 0002.pdf
620 KBAdded in Solicitation version 7Posted - Download
RFIs.pdf
246 KBAdded in Solicitation version 6Posted - Download
Site Visit Sheet.pdf
180 KBAdded in Solicitation version 6Posted - Download
Solicitation Amendment W912QR26RA0170001 SF 30.pdf
287 KBAdded in Solicitation version 2Posted - Download
Solicitation - W912QR26RA017 3.17.26.pdf
275 KBAdded in Solicitation version 1Posted - Download
2025.6.18 - FTC Rectifier PWS.pdf
140 KBAdded in Solicitation version 1Posted - Download
Facility Plans .pdf
2.2 MBAdded in Solicitation version 1Posted - Download
Wage Rates 12.25.txt
46 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Ft. Campbell Rectifier Replacement
- 2Version 2SolicitationArchived
Ft. Campbell Rectifier Replacement
- 3Version 3SolicitationArchived
Ft. Campbell Rectifier Replacement
- 4Version 4SolicitationArchived
Ft. Campbell Rectifier Replacement
- 5Version 5SolicitationArchived
Ft. Campbell Rectifier Replacement
- 6Version 6SolicitationArchived
Ft. Campbell Rectifier Replacement
- 7Version 7SolicitationArchived
Ft. Campbell Rectifier Replacement
- 8Version 8SolicitationArchived
Ft. Campbell Rectifier Replacement
- 10Version 10SolicitationArchivedCurrent
Ft. Campbell Rectifier Replacement
Similar Opportunities
Additional Details
Solicitation Number
W912QR-26-R-A017
Archive Date
May 23, 2026
Office Address
LOUISVILLE, KY, 40202-2230