Rock Island Arsenal (RIA) Microgrid - Sources Sought Notice
Archived on January 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM EST
- Posted
- December 18, 2025
- Notice type
- Sources Sought
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
- Place of performance
- Illinois, 61299
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR_26_SSN_MICROGRID_RIA
- Notice ID
- 7442b965e01b49f3b3629168889225d3
Description
****** THIS SOURCES SOUGHT NOTICE IS UTILIZING MICROSOFT FORMS FOR RESPONSE SUBMISSION. REFER TO ELECTRONIC SUBMISSION INSTRUCTION BELOW.
Description:
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately.
Project Location: Rock Island Arsenal (RIA), Rock Island, IL 61299
Project Description:
Design-Bid-Build (DBB) construction project.
Construct a microgrid system at Rock Island Arsenal (RIA) powered by natural gas-fired (NG) Reciprocating Internal Combustion Engine (RICE) generators with a total capacity of 14 Megawatts (MW), 3 MW of solar photovoltaic (PV) panels, and a 400-kilowatt (kW)/1.6 Megawatt-hour (MWh) Energy Storage System (ESS). This system will integrate with the existing 2.8 MW hydroelectric power plant. During an electric utility grid outage, the new microgrid system will provide sustained power to the entire RIA electrical distribution system when islanded from the grid, ensuring uninterrupted support for RIA’s Advanced Manufacturing Center of Excellence.
The system will include automated isolating switchgear to form the microgrid, paralleling switchgear for the generators, and other necessary controls. It is designed to support approximately 12 MW of critical load and 4 MW of non-critical load, covering the entire RIA installation’s electrical demand. The microgrid will operate as a stand-alone, autonomous electrical power system with the capability to provide a data link connection to the installation’s monitoring and control system.
Supporting facilities will include site development, utilities and connections, lighting, paving, parking, walkways, curbs, gutters, storm drainage, landscaping, and signage. The project will also incorporate all necessary building information systems, as well as fire detection, fire hydrants, and security protection and alarm systems.
Sustainable principles, including life-cycle cost-effective practices, will be integrated into the design, development, and construction of the project. The design will adhere to the Army Sustainable Design and Development Policy and comply with all applicable laws and Executive Orders.
Anticipated Period of Performance: 902 calendar days
NAICS code: 237130 Power and Communication Line and Related Structures Construction. Size Determination is $45M.
Disclosure of the Magnitude of Construction Projects: The estimated price range is between $25,000,000 and $100,000,000. Please note that the Government expects this project to be on the upper end of that price range.
Responses should include:
- Identification and verification of the company’s small business status.
- Contractor’s Unique Entity Identifier Number and CAGE Code(s).
- Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits.
- Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope.
Projects similar in scope shall include construction of a microgrid demonstrating a majority, but not all, of the following elements:
- Natural gas (NG) centralized generators
- Installation of natural gas lines
- Information and Communication Systems
- Installation and Commissioning of Microgrid systems
- Installation of necessary breakers and switchgear
- Installation of Photovoltaic systems
- Installation of centralized generation to provide power to multiple buildings with controls
- Installation of electrical and telecommunication duct bank and controls for Microgrids
- Implementation of control systems for electrical peak shaving
Projects similar in size to this project include:
Construction of projects for new construction natural gas generation systems which meets or exceeds the following size elements:
- Installation and construction of natural gas generators able to handle loads of .5 – 2.5MW
c. Based on the information above, for each project submitted, include:
-
- Current percentage of construction complete and the date when it was or will be completed.
- Scope of the project.
- Size of the project.
- The dollar value of the construction contract and whether it was design/bid/build or design-build.
- The percentage of work that was self-performed as project and/or construction management services or physical construction type work.
- Identify the number of subcontractors by construction trade utilized for each project.
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.
NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.
Electronic Submission Instructions:
Provide responses via Microsoft forms using the below link or QR code (attached as document label "RIA Microgrid SSN - QR code"):
Link: https://forms.osi.apps.mil/r/jCRhKtQvrM
Please note this is NOT a Request for Proposal and does not constitute any commitment by the Government.
Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
RIA Microgrid SSN - QR Code.pdf
288 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Rock Island Arsenal (RIA) Microgrid - Sources Sought Notice
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE), Chicago District, is conducting market research to identify qualified and interested business concerns capable of performing the proposed CSSC Utility Feed Transformer Replacement project.One purpose of this Sources Sought Notice is to determine the availability of capable small business contractors and assist the Government in developing an appropriate acquisition strategy, including consideration of a small business set-aside. The proposed project consists of turnkey removal and replacement of two existing utility feed transformers at the Chicago Sanitary and Ship Canal (CSSC) Fish Dispersal Barrier facility in Lockport, Illinois. The CSSC Fish Dispersal Barrier facility operates continually to protect the Great Lakes from invasive species. The Contractor will be responsible for furnishing all labor, materials, equipment, supervision, transportation, rigging, and incidental services necessary to safely remove and dispose of the existing transformers and furnish, install, test, and commission two new operational replacement transformers. | - | Market Research | 11/05/2026 |
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project. | - | Solicitation | 12/18/2026 |
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR part 12 in conjunction with FAR Part 36. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 15BBNF26Q40900001 is issued as a request for quotation (RFQ), for: The Federal Bureau of Prisons, FCI Marion, intends to issue a solicitation for the following requirement: The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Marion located at 4500 Prison Road Marion, IL 62959 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to repair damage to the 3-phase overhead primary distribution line and two (2) transformers. See the Statement of Work attachment included with the solicitation posting for the complete requirements of the work. The performance period for the project will be 90 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 237130 (Power and Communication Line and Related Structures Construction) with a corresponding small business size standard of $45 million. The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions. The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access. If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above. Each offeror's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information. This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business for the applicable NAICS code (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration). Quotation Deadline: The anticipated closing date for receipt of quotations is December 03, 2026, at 12:00 pm Eastern Time. Payment Terms: Payment will be processed via Electronic Funds Transfer (EFT) in accordance with 52.232-33 Payment by Electronic Funds Transfer- System for Award Management Additional Requirements: Offerors must include a specification sheet and any submittal information about the products offered in their quotation. Faxed and hand-delivered quotes will not be accepted. Site Visit: A site visit will be held at FCI Marion to allow interested vendors the opportunity to examine existing conditions and the work area. Attendance is encouraged but not mandatory. Vendors wishing to attend must submit NCIC background check forms for all proposed attendees by the deadline stated in the solicitation. Only individuals who have received prior approval will be permitted to enter the facility. Specific instructions regarding the date, time, meeting location, required identification, and security procedures will be provided in the solicitation. Questions will not be answered during the site visit; all questions must be submitted in writing to the Contracting Officer in accordance with the solicitation instructions. Solicitation Post Date: estimated Monday, October 5, 2026. NCIC forms due: Friday, October 23, 2026 by 12 pm Central Site Visit: Wednesday, October 28, 2026 at 9 am Central Questions Due: Monday, November 02, 2026 by 12pm EST Offer Due Date: Thursday, December 03, 2026 at 12:00pm EST Any questions regarding the solicitation may be submitted in writing via email to csmart@bop.gov. | - | Combined Synopsis | 12/03/2026 |
The U.S. Army Corps of Engineers (USACE) - Chicago District is issuing this combined synopsis/solicitation as a Request for Quotation (RFQ) under solicitation number W912P626QA030. This acquisition is being conducted using Simplified Acquisition Procedures in accordance with RFO Part 13.*****This project is a Total Small Business Set-Aside under NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction), which carries a small business size standard of $45,000,000.00. *****The Contractor shall furnish all labor, materials, supplies, tools, and equipment necessary to complete the construction project located at J. Edward Roush Lake Dam in Huntington, Indiana (Zip Code: 46750). The required work is structured under two primary Firm-Fixed-Price (FFP) Contract Line Items (CLINs): *****CLIN 0001 (Base) - Replace Diesel Tank Fill Tube: Safe removal of the existing ~20-foot-long fuel fill tube located on a sloped embankment. Installation of a new, sealed connection from the interior 2,000-gallon tank to the road deck fill point, terminating in a lockable filler neck and cap assembly. The new fill tube must be constructed of ASTM A106, Grade B, Schedule 40 seamless carbon steel pipe. Surface preparation and application of a vinyl paint system conforming to USACE Formula V-766e in strict accordance with UFGS Section 09 97 02 (Painting: Hydraulic Structures) is required. *****CLIN 0002 (Base) - Install Emergency Vent on Diesel Tank: Correct calculation of the required venting capacity and installation of an appropriately sized, brand-approved emergency pressure relief vent on the existing 2,000-gallon diesel fuel tank located on the 3rd floor of the tower structure, in strict accordance with National Fire Protection Agency (NFPA) 30, Section 22.7. *****Warranty Requirements: In accordance with SOW Section 4.E and RFO 52.246-21 (Warranty of Construction), the Contractor shall provide a standard 1-year warranty on materials and a general 1-year warranty for installation, running from the date of final Government acceptance. *****STATUTORY SMALL BUSINESS DISCLOSURE: DEFINITIZATION OF EQUITABLE ADJUSTMENTS (RFO 36.101-4 and DFARS CD 2026-O0019)As required by 15 U.S.C. 644(w), when the Contracting Officer anticipates the award of a construction contract to a small business concern, the solicitation notice must include information regarding the agency s definitization of equitable adjustments for change orders: *****USACE Policies and Procedures: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to USACE Partnering Details (https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/) then scrolling down on the right-hand side of the page and clicking on View FFP Contract Changes Playbook Here. *****No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. *****SUBMISSION MODULE and PORTAL REGISTRATION (MANDATORY)To submit a quote, your firm must be registered in the System for Award Management at SAM.gov and within the DoD Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at PIEE Portal. *****Submission Method: Quotes must be submitted electronically via the PIEE Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Any questions regarding the PIEE portal should be directed to the PIEE Helpdesk at the portal link above. *****Site Visit Coordination: A site visit is highly recommended. To coordinate access to the J. Edward Roush Lake Dam, contact Lake Manager Wesley Millar via email at Wesley.s.millar@usace.army.mil or phone at 260-356-8648. *****Inquiries/Questions Due Date: All technical and administrative questions must be submitted via email to James Parizek at James.P.Parizek@usace.army.mil no later than September 3, 2026, at 4:00 PM Central Time. Please include the solicitation number in the subject line.*****Responsibility Statement: All responsible sources may submit a quotation which, if received in a timely manner, shall be considered by the agency. | - | Awarded | Open |
USACE Rock Island hereby awards contract W912EL26CA034 from solicitation W912EK26BA017. | - | Awarded | Open |