Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget

Archived on October 19, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:59 PM EDT
Posted
October 7, 2026
Notice type
Sources Sought
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
Place of performance
Fort McCoy, Wisconsin, 54656
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912QR-27-McCoy-MPAF-SS
Notice ID
fda4130e9ca446099c88a967ffdb081f

Description

A Market Survey is being conducted to gather information and feedback from the construction industry to help shape the acquisition strategy for this Design-Build-to-Budget project. The Government is seeking input from all interested business concerns, including Large Businesses, Small Businesses, and certified HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses. The information gathered will be used to refine the Government's procurement approach for this project delivery method and to determine the potential for a Small Business Set-Aside.  If your firm is interested in this project as a prime contractor, please respond appropriately.

Project Location:  Fort McCoy, WI

Project Title:  Fort McCoy Multipurpose Athletic Field – Army Combat Fitness Testing

Project Description:

This project will be solicited as a Design-Build-to-Budget project. The purpose of this solicitation method is to maximize the achievable scope within a target budget ceiling (currently estimated at $14,676,000). The Design-Build to Budget project will consist of a contractual budget ceiling for which contractors will propose the quantities, configurations, construction type and other innovations that the proposing contractor can complete within the budget ceiling. Negotiations will occur with those offerors invited to Phase II to finalize the scope and cost after receipt of initial proposals. The goal is to allow maximum flexibility in design and construction. The Government intends to only include the basic requirements in the RFP. This will be a two (2) phase Design-Build procurement.

Fort McCoy has no facility large enough to allow indoor Army’s Holistic Health and Fitness (H2F) system activities or Army Fitness Test (AFT) testing in the winter months or during weather events. Currently outdoor activities are conducted on an existing Physical Training area consisting of an outdoor running track and a hand-to-hand combat training area. Students are required to complete the AFT outdoors in inhospitable conditions or must try to obtain a waiver for this component of their class. The site does not provide protected areas from the elements for the Soldiers during or in-between events.

This project will utilize a Design-Build-to-Budget delivery method to design and construct a new facility to contain a 54,600 SF multipurpose athletic field at Fort McCoy, Wisconsin. The facility shall consist of a 200 meter rubberized running track and an artificial turf infield (sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements) for completing the annual Army Fitness Testing (AFT).

Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided.

A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards.  A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system.

Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic field will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations.

Utility connections and telecommunications system(s) shall be coordinated. The facility shall be designed to a minimum life of 40 years and in accordance with DoD's Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated building systems performance. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy.

The available funding for this project is capped at $14,676,000. Prospective offerors should design to, and propose a price that approaches, this maximum budget to maximize the technical value and betterments offered to the Government. Any proposal exceeding this $14,676,000 cap will be deemed non-compliant and ineligible for award. NAICS code is 236220 (Commercial and Institutional Building Construction). All interested prime contractors should respond to this survey via email by 17 October 2026 by 11:59 PM Eastern Time.



Responses should include:
 

  1. Identification and verification of the company’s size status under NAICS 236220 (Large Business, Small Business, and certified HUBZone, 8A, Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses)
     
  2. Contractor’s Unique Entity Identifier (UEI) Number and CAGE Code(s).
     
  3. Information on the Contractor’s ability to be bonded showing current single and aggregate performance and payment bond limits.
     
  4. Descriptions of Experience – Interested construction firms must provide no more than three (3) example projects with either 95% completion or projects completed in the past six (6) years where the interested firm served as the Prime Contractor.
     
  5.  Each project must include the following:

     a.  Name
     b.  Title
     c.  Project Role
     d.  Email Address
     e.  Telephone Number
     f.   At least one (1) reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance.
     
  6. Documentation/Information demonstrating experience managing multiple sub-contractors.
     
  7. Example projects must be of similar size and scope.

    a.  Projects similar in scope to this project include:
          (1)  Artificial turf athletic fields, running tracks, building foundations.

    b.  Projects similar in size to this project include:
          (1)  Projects having a combined square footage of at least 40,000 SF.

    c.   Based on the information above, for each project submitted, include:
         
          (1)  Current percentage of construction complete and the date when it was or will be completed.
          (2)  Size of the project (combined SF, acres of construction site, etc.)
          (3)  Scope of the project (specific trades, site work, utility connections, mechanical systems, HVAC commissioning, roof systems, etc.)
          (4)  The dollar value of the construction contract and project delivery method (whether it was Design-Bid Build, Design-Build, Design-Build-to-Budget, Progressive Design-Build, CMAR, etc.).
          (5)  The portion and percentage of work that was self-performed.  Describe the work your company self-performed.  Must be at least 15% self-performed.
     
  8. Prescriptive "Showstoppers":  Are there any requirements in our functional description that appear overly prescriptive or "locked-in" that might prevent you from offering a more innovative or cost-effective solution to meet the mission?
     
  9. Innovation Opportunities:  In this building type, where do you typically see the most opportunity for an integrated design-build team to provide "more for the money" (e.g., modular systems, envelope efficiency, MEP coordination)?
     
  10. Long-Lead Warning:  Even without a full design, are there specific systems common to this facility type (e.g., generators, custom AHUs, specialized equipment) that are currently experiencing lead times that would threaten the proposed project schedule?
     
  11. Local Labor Constraints:  Are there specific trades in the project area that are currently over-extended or in short supply that could impact the project's risk profile?
     
  12. The prime contrcactor must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.

Stipend Information & Questions

The Government is considering offering a stipend to unsuccessful offerors in Phase II of this Two-Phase Design-Build-to-Budget procurement. Stipends may be used to encourage participation and competition from highly qualified firms, particularly when a project requires significant design effort and up-front proposal costs. Your feedback is crucial for our market research and will help inform the acquisition strategy for this project.

Please provide a response to the following questions:

  1. Influence on Participation:  Would the availability of a stipend impact your firm's decision to invest the resources required to compete in Phase II of this procurement? Please explain why or why not.
     
  2. Proposal Quality:  If a stipend were offered, would it encourage your firm to dedicate more resources toward developing a more detailed, comprehensive, or innovative design proposal?
     
  3. Barriers to Competition:  For a Design-Build-to-Budget project of this size (~$14.6M) and scope, what are the primary challenges or cost drivers your firm anticipates in preparing a Phase II technical proposal?
     
  4. Stipend Value:  While not a commitment, what stipend amount (e.g., a specific dollar figure or a percentage of your estimated proposal cost) would you consider to be a meaningful incentive for participation in Phase II?
     
  5. Effective Incentives:  In a fixed-budget environment, what types of post-award contract incentives are most effective at motivating your team to exceed minimum performance requirements?

NOTE:  Total submittal package shall be no longer than ten (10) pages. Please only include a narrative of the requested information; additional information will not be reviewed.


Email responses to Bonny.C.Dylewski@usace.army.mil and Jesse.E.Scharlow@usace.army.mil.  This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this source sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this Market Survey.


 

NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review clause 52.232-3- Payments by Electronic Funds Transfer – System for Award Management which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website https://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (UEI) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from https://www.SAM.gov.

Please begin the registration process immediately to avoid delay of the contract award should your firm be selected.

 


PARTNERING WITH US:  https://www.usace.army.mil/Business-With-Us/Partnering/

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (3)

  • Fort McCoy MPAF - Industry Day Presentation_14 OCT 2026 FINAL.pdf

    3.3 MBAdded in Special Notice version 4Posted
    Download
  • Industry Day Sign-In Sheet _Fort McCoy MPAF.xlsx

    17 KBAdded in Special Notice version 4Posted
    Download
  • Industry Day Sign-In Sheet_Fort McCoy MPAF.pdf

    1.7 MBAdded in Special Notice version 4Posted
    Download

Lifecycle

  1. 1
    Version 1Special Notice

    Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget Industry Day / Pre-Solicitation Conference & Site Visit

    Notice 480068ddeed44ddf84b1d3ac53a0208f on SAM.gov

  2. 2
    Version 2Sources SoughtArchived

    Type changed from Special Notice to Sources Sought

    Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget

    Notice bc53880f91d14c81bf7c2e61bf2e5687 on SAM.gov

  3. 3
    Version 3Sources SoughtArchived

    Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget

    Notice f651dc9976a24324a02b706099118902 on SAM.gov

  4. 4
    Version 4Sources SoughtArchivedCurrent

    Fort McCoy Multipurpose Athletic Field Design-Build-to-Budget

    Notice fda4130e9ca446099c88a967ffdb081f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
DESCRIPTION: The U.S. Army Corps of Engineers (USACE), Louisville District intends to issue Request for Proposal (RFP) W912QR27RA005. This project will utilize a Design-Build-to-Budget delivery method to provide a new Soldier Fitness Training and Testing Facility to contain a 54,600 SF multipurpose athletic field via an enclosed structure at Fort McCoy, WI. The Design-Build Contractor shall design and construct the multipurpose facility housing the athletic field to result in a complete and usable facility including all permitting, sitework, and utilities. The facility will consist of an indoor 200-meter rubberized running track and turf infield sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements for completing the annual Army Combat Fitness Testing (ACFT). The 200-meter rubberized track will consist of three 4-foot lanes with the lanes striped. Once this project is completed it will be recognized as a permanent facility on Fort McCoy. Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic facility will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy. The facility shall be designed to a minimum life of 40 years and in accordance with DoD’s Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated systems performance. Contract duration is currently estimated at 730 calendar days. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 – Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be an Unrestricted (Full and Open) Procurement. SELECTION PROCESS: This is a two-phase Design-Build to Budget procurement. The proposals will be evaluated using a Best Value Trade-Off (BVTO) source selection process. The technical information contained in each offeror's proposal will be reviewed, evaluated, and rated by the Government. Potential offerors are invited to submit their information as will be described in Section 00 22 16 of the Solicitation for Phase I and Section 00 22 18 of the Solicitation Phase II amendment for review and consideration by the Government. The selection process for Phase I will focus on past performance, qualifications, and integrated Design-Build experience of each offeror’s proposed Design-Build team. Pro-Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. Following the completion of the evaluation of Phase I proposals, a maximum of three (3) of the most highly qualified offerors will be invited to proceed to Phase II and be issued a Draft RFP. The Government’s technical team will hold a series of confidential, 1-on-1 proprietary meetings with each Phase II offeror to review preliminary design concepts; provide feedback; ensure continuous alignment on scope, schedule, and budget; and course-correct misunderstandings to ensure that solutions maximize the value of the fixed budget. After the meetings conclude, the Government will issue the Final Phase II RFP exclusively to the down-selected offerors. The Final RFP will include any needed changes resulting from the proprietary meetings and additional program documents to support final proposal submissions. The Phase II proposals will be evaluated by the Government for each offeror’s innovative and optimized design/technical solutions that meets all the project’s performance requirements (baseline compliance) and betterments within the fixed budget ($14,676,000) to maximize the utility of the full budget to deliver the highest quality, most durable facility. The Small Business Participation Plan will also be evaluated. The Standard Form (SF) 1442 and Subcontracting Plan (for Other than Small Businesses) will also be required to meet the minimum requirements of the solicitation. All evaluation factors are considered significantly more important than price. CONSTRUCTION COST LIMITATION (CCL): $14,676,000 (Hard Contractual Budget Ceiling) ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 02 December 2026 (subject to change). Details such as the actual date, time, and location regarding the Site Visit to be held during the first Proprietary Meeting will be provided to Phase II down-selected offerors. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at the Contract Opportunities website (https://www.sam.gov) and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module (https://piee.eb.mil/sol/xhtml/unauth/index.xhtml). Paper copies of the solicitation will not be issued. Telephone, email, and fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To be able to download the solicitation for this project, contractors are required to register at the System for Award Management (SAM) at http://www.sam.gov. Amendments, if/when issued, will be posted. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have a valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is the Contract Specialist, Bonny Dylewski, at Bonny.C.Dylewski@usace.army.mil. This announcement serves as the Advance Notice for this project. Responses to this synopsis are not required. PARTNERING WITH US: https://www.usace.army.mil/Business-WithUs/Partnering/
100%
Pre-Solicitation12/02/2026
***THIS POSTING HAS BEEN UPDATED TO ATTACH THE INDUSTRY DAY PRESENTATION & SIGN-IN SHEETS*** The U.S. Army Corps of Engineers is hosting an Industry Day/Pre-Solicitation Conference on Wednesday, 14 October 2026. The conference will offer a venue to provide information for an upcoming contracting opportunity, as well an opportunity for a Site Visit. This event is open to Large, Small and Socio-Economic Businesses who are registered in System for Award Management (SAM.gov) for the NAICS Code 236220 (Commercial and Institutional Building Construction). The Government is planning on issuing a construction solicitation for the design and construction of the Fort McCoy Multipurpose Athletic Field using the Design-Build-to-Budget delivery method. The Project Description is provided under the "Project Information” section of this announcement. This is not a Request for Proposal, an Invitation for Bid, or a Request for Quotation. Therefore, this event is not to be construed as a commitment by the Government to enter into a contract nor will the Government pay for information provided to the Government in a response nor pay for administrative costs incurred attending the Industry Day event. No reimbursement will be made for any costs associated with travel or providing information in response to this announcement. EVENT INFORMATION: Pre-Solicitation Conference Time: 9:00 a.m. Central Daylight Time (CDT) - Informational Meeting followed by Site Visit The Pre-Solicitation Conference informational presentation will be conducted on Wednesday, 14 October 2026 at the following location: (Building) 2113 South J Street, Fort McCoy, WI 54656-5148 – Classroom 133 Note: An aerial map is provided for reference under the "Attachments/Links" section of this announcement. Microsoft Teams (Virtual Participation): https://dod.teams.microsoft.us/meet/993484250583?p=GyrYlw9YrMGl2gaSOU Meeting ID: 993 484 250 583 Passcode: KB25c38S Dial in by phone: +1 601-262-2433, 317074905# United States, Vicksburg Phone conference ID: 317 074 905# Base Access All interested in-person attendees must provide the following information to the Sponsor/POC below no later than (NLT) Thursday, 08 October 2026 -- First Name, Last Name, and email address. SPONSOR/POC: Kyle Burwitz | Kyle.A.Burwitz@usace.army.mil | (402) 660-6419 (NOTE: The Sponsor/POC provided is only to be contacted in reference to submitting required information for base access. He shall NOT be contacted with questions to obtain information concerning the project and the solicitation, which will be addressed at the Pre-Solicitation Conference.) Please bring a valid driver's license or valid photo ID for each person attending, vehicle registration and proof of insurance in the vehicle to gain access to the base. QUESTIONS: For questions regarding this announcement, please email Bonny.C.Dylewski@usace.army.mil with the subject line "Fort McCoy Multipurpose Athletic Field – Industry Day". Please note that two (2) days following the conclusion of the Industry Day, this posting will be updated to include the Industry Day/Pre-Solicitation Conference Presentation. Please “follow” this announcement for any future updates. PROJECT INFORMATION: Multipurpose Athletic Field – Army Combat Fitness Testing This project utilizes a Design-Build-to-Budget delivery method to design and construct a new facility to contain a 54,600 SF multipurpose athletic field at Fort McCoy, Wisconsin. The facility shall consist of a 200 meter rubberized running track and an artificial turf infield (sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements) for completing the annual Army Fitness Testing (AFT). Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic field will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. Utility connections and telecommunications system(s)shall be coordinated. The facility shall be designed to a minimum life of 40 years and in accordance with DoD's Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated building systems performance. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/
100%
Special Notice10/14/2026
Design-Build-to-Budget for the Construction of a Staging and Marshalling Area located at Fort Campbell Ky. Estimated Construction cost is between $5,000,000 and $10,000,000 in accordance with DFARS 236.204 NAICS Code is 236220. Size Determination is $45M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM, the business will be considered other than a small business. This is a Small Business Set Aside procurement. Offerors must comply with the requirements of RFO 52.204-7, 52.204-8, 52.232-33, and any other contractor registration and online representations and certification requirements in this solicitation through the System for Award Management (SAM), available at https://sam.gov/. PLEASE NOTE: SAM is completely free of charge for both registrants and users. Amendments will be available from the w website by download only. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
80%
Solicitation09/01/2026
The U.S. Army Corps of Engineers (USACE), Los Angeles District, is conducting market research to identify prime contractors capable of the design and construction of a Tactical Unmanned Aerial Vehicle Hangar at Ft. Huachuca, Arizona. This is a Sources Sought Synopsis for market research purposes only and does not constitute a solicitation for proposals or an obligation on the part of the U.S. Government. The Government will not pay for any information received in response to this notice. The purpose is to identify qualified and interested firms, particularly small businesses, capable of performing the work described herein. All interested Businesses, including Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses, Service-Disabled Veteran Owned Small Business, and Large Business contractors should respond to this survey NLT 26 June 2026 by 2:00PM Pacific Standard Time. Please see UPDATED attachment for details.
76%
Market Research06/26/2026
SUBJECT: Sources Sought (RFI) – Fort Wolters H Barracks, Mineral Wells, Texas DISCLAIMER. THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market intelligence, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party. PURPOSE. The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. ACQUISITION STRATEGY & NON-FAR MODEL. Statutory Authority: This project will potentially be executed as a Progressive Design-Build (PDB) or Design-Build to Budget (DBtB) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. Non-FAR Environment: Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this procurement. The negotiated, bilateral Other Transaction Agreement will serve as the sole governing contract. Standard FAR clauses are inapplicable, though federal statutory constraints (such as federal fiscal law, criminal statutes, and general civil laws) remain fully applicable. Phased Agreement Mechanics: PBD Procurement Process: Phase 1, Design & Pre-Construction Services, a design-builder will be selected through a qualifications-based selection (QBS) process. The government will then negotiate a fee for Phase 1 services. There is no requirement to submit price proposals or design concepts during the initial selection. Phase 2, Final Design & Construction, is executed via a bilateral modification to the OT Agreement upon successful negotiation of a Guaranteed Maximum Price (GMP) at approximately 65% design maturity. The Agreement contains an "off-ramp" clause allowing the Government to retain the design and procure construction separately if GMP negotiations fail. DBtB Procurement Process: Solicitation and evaluation during Phase 1 focuses on the qualifications, past performance, and integrated Design-Build experience of each offeror. The Government is evaluating the team and not necessarily how the offeror will design the structure. The Phase 1 evaluation results in the selection of three of the most highly qualified, competitive teams to proceed to Phase 2. Phase 2, the Government will issue the final RFP exclusively to the down-selected teams. This RFP includes the validated, performance-based requirements, establishes the firm Construction Cost Limit (CCL), and clearly defines the basic scope. Note: See link to provide industry feedback https://forms.osi.apps.mil/r/ZQ8Rm8MaN7
68%
Market Research11/04/2026

Additional Details

Solicitation Number

W912QR-27-McCoy-MPAF-SS

Archive Date

Oct 19, 2026

Office Address