Notice ID: 89c30a8cc9564cf6ae3111630e6dca6fSources Sought
Sources Sought/Market Intelligence: Fort Hunter-Liggett Barracks – Potential Use of Progressive Design Build using Other Transaction Authority (OTA)
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- August 5, 2026
- Notice type
- Sources Sought
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST LOUISVILLE
- Place of performance
- 93928
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR-PDB-FHLBARRACKS
- Notice ID
- 89c30a8cc9564cf6ae3111630e6dca6f
Description
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE Notice: This is a Request for Information (RFI) for market research and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to demolish and dispose of five (5) existing Barracks and replacing with four (4) CTE Barracks and one (1) AST Barracks. Key features of the project may include: Design and construct four (4) multi-story CTE Barracks (approximately 46,000 total SF each), which will feature open bays, along with integrated officers sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Design and construct one (1) multi-story AST Barracks (approximately 45,000 total SF), which will feature sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Demolish and dispose of five (5) existing multi-story Barracks (approximately 39,000 total SF each). Estimated Acquisition Magnitude: $200,000,000.00 Planned Acquisition Strategy: Progressive Design-Build (PDB) via Other Transaction Authority (OTA) The Government is considering utilizing an Other Transaction (OT) Agreement for a prototype project under the authority of 10 U.S.C. § 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build (PDB). Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. INFORMATION REQUESTED 1. Company Profile: Firm Name, Address, and Point of Contact (Name, Title). Phone Number, Email Address, and Unique Entity ID (UEI). Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.). 2. Other Transaction Authority (OTA) & Statutory Compliance: Innovative Technologies: The authority for this OTA (10 U.S.C. § 2808a) is focused on prototyping with new or emergent construction technologies. Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. OTA Experience: Describe your firm's previous experience (if any) executing prototype projects under an OTA. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies on traditional military construction projects? How could the flexibility of an OTA help overcome these barriers? What project characteristics make PDB-OTA particularly advantageous or disadvantageous for this requirement? 3. Progressive Design-Build (PDB) / Early Contractor Involvement: Baseline Definition: What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering into Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Collaborative Framework: What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods. How do you approach "open-book" pricing and transparency during Phase 1 (Pre-Construction) to build trust and ensure the Government is receiving fair market value? From your experience with Progressive Design-Build or other collaborative delivery methods, what Government actions or decisions during Phase 1 have the greatest influence on achieving a successful GMP, minimizing redesign, and maintaining schedule? 4. Guaranteed Maximum Price (GMP), Risk Allocation & Compensation: Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the GMP or final design (the "off-ramp"), what specific compensation structures (e.g., stipends, time-and-materials for design effort) would adequately compensate your firm for pre-construction efforts? Payment Milestones: Because an OTA allows for flexible payment structures, what milestone payment arrangement during Phase 1 (e.g., monthly progress, completion of design percentages, deliverable-based) best supports your firm's cash flow and resource allocation? Data Rights: Under an OTA, data rights and intellectual property can be negotiated. What data rights structure for the final design deliverables (if an off-ramp is taken) would provide a fair balance between the Government's need to construct the facility and your firm's proprietary design methods? In your experience with PDB, at what design milestone (e.g., 35%, 65%, 90%) is it most advantageous to lock in the GMP for a complex facility, and why? How do you handle the procurement of long-lead items (e.g., switchgear, specialized fire pumps, large span steel) prior to establishing the final GMP? What level of cost growth would you typically expect between conceptual planning and GMP establishment? 5. Housing Construction Expertise: Describe your specific experience with large-scale multi-story housing buildings and/or other similar facilities on a military controlled installation. What is the greatest supply chain, scheduling, or technical risks you foresee for a project of this type at Fort Hunter Liggett, and how would the PDB delivery method help mitigate them? Are there specific trades, materials, equipment, or subcontractor resources in the Fort Hunter Liggett market that are currently constrained? Would early contractor involvement through Progressive Design-Build materially improve the Government’s ability to manage these market risks? Why or why not? Based on your experience with military housing or comparable large-scale residential projects, what project complexities or risk factors are commonly underestimated during Government planning? Please identify those that most significantly affect cost, schedule, constructability, or long-term facility performance. What planning assumptions would you recommend the Government validate or reconsider prior to issuing a solicitation for this project? 6. Teaming & Subcontractor Integration: Under a PDB model, how and when do you plan to on-board your critical subcontractors (e.g., structural steel, MEP, fire protection)? Will you compete these subcontracts openly during Phase 1, or do you prefer bringing in established partners from day one? 7. Feedback on the Acquisition Strategy & Alternatives: Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Have current market conditions increased the value of collaborative delivery methods compared to traditional procurement methods? If so, how? 8. Bonding Capability: As it currently stands, bonding is not required during Phase 1. With that being said, do you have any concerns with regard to bonding capacity? Surety Timelines: If construction bonds are deferred to Phase 2, what is the maximum duration your surety would hold a commitment open between the finalization of the GMP and the Notice to Proceed for construction? Funding Gap Mitigations: If funding for construction is delayed beyond an anticipated window (e.g., 90-180 days post-design completion), what mechanisms (e.g., formalized escalation clauses, right to off-ramp without penalty) would your firm require to maintain the agreement? Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Sources SoughtCurrent
Sources Sought/Market Intelligence: Fort Hunter-Liggett Barracks – Potential Use of Progressive Design Build using Other Transaction Authority (OTA)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for the design and construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA using Progressive Design-Build (PDB) under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. I. INDUSTRY DAY USACE intends to conduct an Industry Day on 17 November 2026 at 0900 Pacific Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Progressive Design-Build (PDB) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ. To access Fort Hunter Liggett, please proceed directly to the Main Gate / Access Control Point. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not have a REAL ID, provide your valid State ID/Driver’s License plus a current U.S. Passport. Please state your business intention “attending the U.S. Army Corps of Engineer’s Industry Day at Bldg. 3300”. Individuals with a valid CAC, should be able to access the installation directly. Fort Hunter Liggett Access Control Point Address: 2Q26+W3C Fort Hunter Liggett, CA 93928; or 36°00'08.3"N 121°14'23.5"W II. LOCATION/LOGISTICS Industry Day Presentation location: Building 3300, Classrooms 118 & 119. Parking is at the rear of the building. Overflow parking is located at Longbow St. and Blackhawk St. Fort Hunter Liggett Building 3300 Address: XQX8+V2, Fort Hunter Liggett, CA 93928; or 36°00'00.0"N 121°14'05.9"W USACE Agency Representative Mr. Robert “Bob” Roy – USACE Project Engineer, Sacramento District (831)710-7154 III. PROJECT OVERVIEW Project Title: Design and Construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks Location: Fort Hunter Liggett, California Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 IV. PROJECT DESCRIPTION This acquisition will deliver four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks at Fort Hunter Liggett, CA. The scope of work consists of furnishing all necessary equipment, materials, labor, supervision, quality control, and supplies to demolish and dispose of five (5) existing Barracks and replacing with four (4) CTE Barracks and one (1) AST Barracks. Key features of the project may include: Design and construct four (4) multi-story CTE Barracks (approximately 46,000 total SF each), which will feature open bays, along with integrated officers sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Design and construct one (1) multi-story AST Barracks (approximately 45,000 total SF), which will feature sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Supporting facilities may include but not limited to; site development, utilities and connections, lighting, paving, walks, curbs and gutters, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy, cybersecurity, and all required fixtures, furnishings, and equipment. Demolish and dispose of five (5) existing multi-story Barracks (approximately 39,000 total SF each). V. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District will use a streamlined competitive selection process: Step 1 – White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected to enter exclusive negotiations. The Agreements Officer will request a detailed price proposal for Phase 1 (100% design) and negotiate the design fee, payment milestones, and Agreement Articles. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction, which will be added as a bilateral modification at a later date. VI. ACQUSITION STRATEGY – AWARD The agreement will be awarded to the most qualified Design/Builder to provide design, preconstruction services, and construction. Phase 1 of the Progressive Design Build agreement will include design development and pre-construction services. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VII. Virtual Participation Opportunity: For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams meeting Join: https://dod.teams.microsoft.us/meet/993167156182?p=0xzCpAMCfJMOR4Ixl1 Meeting ID: 993 167 156 182 Passcode: dd2oQ7zN | 97% | Special Notice | 11/17/2026 |
DESCRIPTION The U.S. Army Corps of Engineers (USACE), Los Angeles District, is issuing this Request for Information (RFI) / Market Intelligence Notice to obtain industry feedback regarding the anticipated design and construction of the Collaborative Combat Aircraft (CCA) Unit Operations and Hangar at Creech Air Force Base, Nevada, using Progressive Design-Build (PDB) under 10 U.S.C. § 2808a, Other Transaction Authority for Construction. The purpose of this notice is to gather market intelligence regarding industry capabilities, experience, commercial practices, acquisition considerations, and potential challenges associated with the proposed project. Information obtained through this notice will assist the Government in developing its acquisition strategy, identifying potential industry participants, and refining project requirements prior to the release of the formal Program Solicitation. This notice is issued for informational and acquisition planning purposes only and does not constitute a solicitation or commitment by the Government to award an agreement. I. PURPOSE OF MARKET INTELLIGENCE USACE is conducting preliminary market intelligence to better understand industry capabilities and obtain feedback regarding the proposed use of Progressive Design-Build under an Other Transaction framework. The Government is particularly interested in receiving information regarding industry experience with progressive design-build delivery, design and construction of specialized military aviation facilities, anticipated project risks, acquisition considerations, and commercial practices that may improve project delivery. Participation in this market intelligence effort is voluntary. Responses will be used solely to support acquisition planning and development of the Government's proposed acquisition approach. II. PROJECT OVERVIEW Project Title: Collaborative Combat Aircraft (CCA) Unit Operations and Hangar Creech AFB, Nevada Project Location: Creech Air Force Base, Nevada Agency: U.S. Army Corps of Engineers, Los Angeles District Program Amount (est.): $180M - $200M NAICS Code: 236220 Small Business Size Standard: $45M Project Delivery Method: Progressive Design-Build (PDB) Acquisition Authority: 10 U.S.C. § 2808a – Other Transaction Authority for Construction III. PROJECT DESCRIPTION The proposed project consists of the design and construction of a Collaborative Combat Aircraft (CCA) Unit Operations and Hangar facility at Creech Air Force Base, Nevada. The project is anticipated to provide an approximately 84,931-square-foot facility consisting of a squadron command and operations center, aircraft maintenance unit, hangar bay, and associated aircraft parking apron to support CCA operations and aircraft maintenance activities. The project may include associated site improvements, utilities, infrastructure, and supporting facilities necessary to provide a complete and functional operational facility. The preliminary scope of work is subject to further development and refinement. Additional project requirements and technical information may be provided in future acquisition announcements. IV. ANTICIPATED ACQUISITION APPROACH The Government is considering the use of Progressive Design-Build (PDB) under the Other Transaction Authority for Construction pursuant to 10 U.S.C. § 2808a. Under the proposed approach, the Government anticipates utilizing a streamlined competitive selection process consisting of the following steps: Step 1 – White Papers / Statements of Qualifications Interested parties would submit qualification information demonstrating relevant experience, technical capabilities, management approach, and qualifications to perform the proposed project. Following evaluation of the submissions, the Government anticipates selecting a limited number of highly qualified firms to proceed to the next step. Step 2 – Pitch Presentations Selected firms would be invited to participate in pitch presentations to further demonstrate their qualifications, technical approach, and ability to successfully execute the proposed project. The Government anticipates selecting a preferred Progressive Design-Build Entity (PDBE) for negotiations regarding the initial agreement. Anticipated Post-Award Approach The proposed PDB approach would generally include two phases: Phase 1 – Design Development and Preconstruction Services: Collaborative development and refinement of the design, project requirements, construction approach, cost estimates, schedule, and associated preconstruction activities. Phase 2 – Final Design and Construction: Completion of the remaining design and construction activities, subject to successful negotiations, required approvals, and availability of funds. The final selection process, agreement structure, pricing methodology, and contractual arrangements will be established in the formal Program Solicitation and applicable agreement documents. V. MARKET INTELLIGENCE REQUESTED The Government is seeking input from interested industry participants regarding the proposed project and acquisition approach. Interested parties are encouraged to provide responses to the following questions: 1. Company Information and Capabilities Provide the company name, business address, primary point of contact, and a brief description of the firm's capabilities relevant to the proposed project. 2. Relevant Project Experience Describe your firm's experience with Progressive Design-Build or similar collaborative project delivery methods, particularly for military aviation facilities, hangars, or other complex construction projects. Also describe your firm’s (or proposed team’s) experience designing and constructing ICD 705-compliant spaces, including accreditation support. 3. Progressive Design-Build / OTA Experience Has your firm participated in projects utilizing Progressive Design-Build or Other Transaction agreements? If so, briefly describe your experience and identify any lessons learned. 4. Proposed Acquisition Strategy Does your firm have any recommendations or concerns regarding the proposed two-step selection process consisting of White Papers and Pitch Presentations? 5. Project Delivery and Risk Considerations What significant technical, design, construction, logistical, or scheduling challenges should the Government consider when developing the project requirements and acquisition strategy? Specifically address the following: Site-Specific Realities: Creech AFB is a remote desert location characterized by extreme temperatures, specialized airspace/base access constraints, and limited local labor and material resources. Key Drivers: Identify the primary cost and schedule drivers you foresee for this project. Mitigation Strategies: Describe your recommended risk mitigation and sourcing strategies to overcome these challenges. 6. Pricing and Commercial Practices What pricing approaches, cost development methods, and commercial practices would your firm recommend for a Progressive Design-Build agreement involving design development and subsequent construction? 7. Industry Participation Would your firm be interested in participating in the anticipated competition? If not, please identify any significant barriers to participation. 8. Additional Recommendations Provide any additional recommendations that may assist the Government in refining the project requirements, improving competition, managing risks, or developing the proposed PDB w/ OTA acquisition strategy. VI. RESPONSE INSTRUCTIONS Interested parties are encouraged to submit written responses addressing the market intelligence questions identified in Section V. Responses should be concise and limited to information relevant to the proposed project and acquisition approach. Respondents are requested to identify any proprietary or confidential business information included in their submissions. The Government may use information received to support acquisition planning and development of future requirements. No evaluation or ranking of responses will occur. Submission of a response does not guarantee participation in any subsequent acquisition. SUBMISSION INSTRUCTIONS Interested parties are requested to submit responses electronically no later than 01 December 2026 To facilitate Government review, Follow these constraints and formatting requirements: File format: Single searchable PDF Page Limit: no more than twelve (12) pages, excluding a one-page cover sheet Paper size: 8.5" × 11" (U.S. Letter) Margins: Minimum 1 inch on all sides Font: Times New Roman or Arial Font size – body: 12 point Font size – tables / figures / captions: Minimum 10 point Line spacing: Single-spaced or 1.15 Footer: Page numbers and Company name Responses shall be submitted to: Primary Point of Contact: Dominic Pebenito at Dominic.M.Pebenito@usace.army.mil Secondary Point of Contact: Tezra J. Hamilton at Tezra.J.Hamilton@usace.army.mil Please include “Collaborative Combat Aircraft (CCA) Unit Operations and Hangar – PDB w/ OTA Market Intelligence” in the subject line. VII. FUTURE ACQUISITION INFORMATION The Government anticipates issuing additional information regarding the proposed project and acquisition strategy as acquisition planning progresses. A formal Program Solicitation may be issued at a future date. The solicitation, if issued, will contain the final acquisition procedures, evaluation criteria, submission requirements, and applicable agreement provisions. Interested parties are encouraged to monitor SAM.gov for future announcements and updates regarding this project. VIII. DISCLAIMER This Request for Information is issued solely for market intelligence and acquisition planning purposes. It is not a Request for Qualifications (RFQ), Request for Proposal (RFP), or formal Program Solicitation. The Government is not requesting proposals or price offers at this time. Responses to this notice are voluntary. The Government will not reimburse respondents for costs incurred in preparing or submitting information in response to this notice. This notice does not obligate the Government to issue a subsequent solicitation, enter into negotiations, or award an Other Transaction agreement. The Government reserves the right to modify the proposed acquisition strategy and project requirements based on the results of market intelligence and further acquisition planning. | 86% | Special Notice | 12/01/2026 |
The U.S. Army Corps of Engineers (USACE), Fort Worth District, on behalf of the Department of the Air Force (DAF), is issuing this Program Solicitation to identify a Design-Build Team for the 91st Cyber Operations Center at Joint Base San Antonio (JBSA), Lackland Air Force Base, Texas. The project involves the design and construction of an approximately 42,000-square-foot, multi-story facility to support the mission requirements of the Air Combat Command 91st Cyber Operations Squadron. The facility will be designed and constructed to meet applicable security and technical standards for a mission-critical cyber operations environment. This acquisition will use a Progressive Design-Build (PDB) delivery model executed under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. § 2808a. The acquisition will be conducted in two phases: Phase 1—Design and Pre-Construction Services: The selected Design-Build Team will collaborate with the Government to refine project requirements, advance the design, validate cost and schedule, and support development of the Phase 2 scope. Phase 2—Construction Packages: Subject to successful Phase 1 performance, successful negotiation, required approvals, authorization, and availability of funds, the Government may authorize subsequent construction packages through Agreement Amendment. Anticipated packages include: Phase 2A—Site/Civil and Early Construction: Site development, civil work, and other early construction activities. Phase 2B—Building Construction: Final design completion and construction of the 91st Cyber Operations Center facility. The Government may authorize additional construction packages, as appropriate. The Government is under no obligation to proceed with Phase 2A, Phase 2B, or any additional package. The Government will use a two-step, qualifications-based selection process: White Paper Submission and Evaluation Pitch Meetings, by invitation only Interested Design-Build Teams are invited to submit a White Paper in accordance with the solicitation and its attachments. The White Paper is the only submission required at this time. White Papers must address all requirements in Attachment 1, Request for White Paper Submission Requirements. Questions: All questions must be submitted through the ProjNet Bidder Inquiry System no later than 11 November 2026, in accordance with the solicitation instructions. White Paper Due Date: White Papers are due no later than 17 November 2026 at 1400 Central Time. Submission Method: Submit White Papers by email to the Solicitation Points of Contact identified in the solicitation. Required Email Subject Line: “White Paper for 91st Cyber Operations Center” Refer to the attached Program Solicitation, Attachment 1—Request for White Paper Submission Requirements, and Attachment 2—Project Requirements Document for the complete project scope, submission instructions, evaluation approach, and applicable requirements. | 82% | Solicitation | 11/18/2026 |
***NOTICE*** This amendment only applies to offerors who submitted proposals on time on 29 April 2025 at 1400 ET. Any submission by an offeror that has not met this criteria will not be accepted or reviewed. | 73% | Solicitation | 02/17/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to repair, restore, and modernize Building 410 – the General Stilwell Army Reserve Center (ARC) – a failing two-story, 144,360 SF Command and Control / training facility, along with Non-Organizational (POV) parking and supporting utilities, located at Fort Hood, Texas. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional, code-compliant, and modernized facility that extends the economic life of the building by 25 years and enables mission readiness for the assigned Army Reserve units. Building 410 was constructed in November 1985 and provides mission-essential functional areas in support of six Legal Detachments, a Training Brigade, Transportation Company, Civil Affairs Brigade, Human Resources Company Headquarters, a Public Affairs Detachment, and the Reserve Personnel Action Center. The mechanical, plumbing, and electrical systems are beyond their serviceable life. A technical assessment has confirmed widespread facility deterioration. Key facility deficiencies include: • Roof membrane system has exceeded useful life and is past warranty; exterior doors, windows, and storefronts require replacement; interior finishes (walls, flooring, acoustical ceilings) are failing. • HVAC systems (rooftop units, air handlers, boilers, pumps, piping, radiation units, controls, and exhaust fans) are in failing condition or original to the building. • Electrical infrastructure is original, fully loaded 1600A main panel with no capacity for additional loads; insufficient outlets creating safety hazards; distribution panels and wiring require modernization. • Plumbing fixtures and sanitary piping require code upgrades; hot water heater is undersized. • Telecommunications infrastructure (Category 5/6 cabling) is unreliable and does not comply with current Army Reserve Network Enterprise Center (ARNEC), TIA-607, or UFC 3-580-01 standards; no Primary or Secondary Bonding Busbars. • No fire sprinkler system; bathrooms do not meet ADA standards; facility lacks an elevator; telecommunication spaces are undersized. • Hazardous materials (asbestos and lead-based paint) identified throughout the facility requiring abatement. SCOPE: The project repairs and restores Building 410 by addressing widespread facility deterioration and returning the structure to a fully functional, code-compliant training facility. Work includes comprehensive repairs to failing electrical, plumbing, and heating, ventilation, and air conditioning (HVAC) systems, along with full rehabilitation of the building envelope, including roof replacement. The facility will be brought up to Americans with Disabilities Act (ADA) standards. The project will demolish and abate all failing components and hazardous materials. Asbestos, mold, lead-based paint, biohazard, or other hazardous materials will be handled, stored, and disposed of in accordance with current laws and regulations. Supporting work includes Non-Organizational Vehicle Parking and Supporting Utilities improvements. Other methods of meeting this requirement were analyzed, including building demolition and new construction; however, these were deemed unviable due to the cost of repair versus the cost of demolition and new construction. The repair of this facility is more cost effective than replacement. Estimated Acquisition Magnitude: $90,000,000 PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The PDB Course of Action (10 U.S.C. § 2808a): This path allows USACE to execute a construction project where the Construction Firm is brought in during the design. The Louisville District anticipates onboarding the collaborative partner at an appropriate design maturity to maximize value. Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Hood Building 410 Repair & Modernization: Q12. Describe your experience/expertise with large-scale repair, renovation, and modernization of military, federal, or institutional buildings—particularly multi-story administrative, training, or command-and-control facilities. Include experience with hazardous material abatement (asbestos, lead-based paint), major mechanical/electrical/plumbing systems replacement, building envelope and roof rehabilitation, ADA upgrades, fire/life safety improvements, and telecommunications infrastructure modernization to current UFC/ARNEC standards. Q13. What are the greatest supply chain, scheduling, technical, and/or operational risks you foresee on a project of this type at Fort Hood, Texas (including potential constraints of an occupied or partially occupied facility, swing space coordination, mission continuity for Army Reserve units, or Texas climate/weather impacts), and how could the PDB delivery method help mitigate those risks? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery experience, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/rU5Rsi9Qmg or via the QR Code provided in the attachment. Please submit your responses by 20 November 2026 at 1000 Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | 70% | Market Research | 11/24/2026 |