Notice ID: cb186ac8cc4057eec6aead061399885dAward NoticeAwarded
Fallbrook, CA Army Reserve Center
Awarded on September 25, 2018. Full description on SAM.gov.
Awarded tounder W912QR18C0036 (source: SAM.gov award notice)• $34.6M
Overview
- Posted
- September 25, 2018
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Fallbrook, CA
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 10, 2025
- Award date
- Sep 25, 2018
- Award amount (SAM.gov award notice)
- $34.6M
Identifiers
- Solicitation number
- W912QR18R0009
- Notice ID
- cb186ac8cc4057eec6aead061399885d
- Award number (PIID)
- W912QR18C0036
Description
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) for the construction of a new 800 member Army Reserve Center in the vicinity of Fallbrook, CA. Primary facilities include construction of an ARC Training Building (79,000 SF), Organizational Maintenance Shop (9,000 SF), and Unheated Storage Building (7,000 SF) on a 15 acre site. Prior to construction the demolition and relocation of an existing electrical transmission line that transects the site is required. Buildings will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Supporting facilities include land clearing, paving, concrete aprons, two vehicle was racks/platforms, fencing, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 243 Tons). The contract duration is estimated at seven hundred and sixty (760) calendar days from Notice to Proceed.
Award Overview
Award Number
W912QR18C0036
Award Amount (SAM.gov award notice)
$34.6M
Award Date
Sep 25, 2018
Awardee
Awardee UEI
NDVPM1NN8XL7
Original Solicitation
Notice ID: cb186ac8cc4057eec6aead061399885d
Posted Date: Sep 25, 2018
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $37.1MSigned Aug 19, 2026
- $36.5MSigned Aug 3, 2026
- $20.0MSigned Aug 3, 2026
- $20.0MSigned Jul 27, 2026
- $20.0MSigned Jun 23, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912QR18R0009- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 2×Special NoticeFeb 15, 2018
Industry Day for D/B/B of an Army Reserve Center (ARC) located in Fallbrook, CA
- 16×Pre-SolicitationApr 26, 2018
Fallbrook, CA Army Reserve Center (ARC)
- AwardedCurrentSep 25, 2018
Fallbrook, CA Army Reserve Center
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912QR18R0009
Archive Date
Oct 10, 2018
Office Address