Notice ID: cb186ac8cc4057eec6aead061399885dAward NoticeAwarded

Fallbrook, CA Army Reserve Center

Awarded on September 25, 2018. Full description on SAM.gov.

Awarded tounder W912QR18C0036 (source: SAM.gov award notice)• $34.6M

Overview

Posted
September 25, 2018
Notice type
Award Notice

Notice details

Place of performance
Fallbrook, CA
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 10, 2025
Award date
Sep 25, 2018
Award amount (SAM.gov award notice)
$34.6M

Identifiers

Solicitation number
W912QR18R0009
Notice ID
cb186ac8cc4057eec6aead061399885d
Award number (PIID)
W912QR18C0036

Description

The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) for the construction of a new 800 member Army Reserve Center in the vicinity of Fallbrook, CA. Primary facilities include construction of an ARC Training Building (79,000 SF), Organizational Maintenance Shop (9,000 SF), and Unheated Storage Building (7,000 SF) on a 15 acre site. Prior to construction the demolition and relocation of an existing electrical transmission line that transects the site is required. Buildings will be of permanent construction with reinforced concrete foundations; concrete floor slabs; reinforced concrete or masonry walls; low-slope or sloped roof; Heating, Ventilation and Air Conditioning (HVAC); and plumbing, mechanical, security and electrical systems. Supporting facilities include land clearing, paving, concrete aprons, two vehicle was racks/platforms, fencing, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 243 Tons). The contract duration is estimated at seven hundred and sixty (760) calendar days from Notice to Proceed.

Full description on SAM.gov

Award Overview

Award Number

W912QR18C0036

Award Amount (SAM.gov award notice)

$34.6M

Award Date

Sep 25, 2018

Awardee

Awardee UEI

NDVPM1NN8XL7

Original Solicitation

Notice ID: cb186ac8cc4057eec6aead061399885d

Posted Date: Sep 25, 2018

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • W912QR22C0036
    COX CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $37.1MSigned Aug 19, 2026
  • W912QR26CA019
    COX CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $36.5MSigned Aug 3, 2026
  • W912QR24C0015
    COX CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $20.0MSigned Aug 3, 2026
  • W912QR24C0015
    COX CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $20.0MSigned Jul 27, 2026
  • W912QR24C0015
    COX CONSTRUCTION CO
    Department of DefenseNAICS 236220
    $20.0MSigned Jun 23, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912QR18R0009
  1. Pre-Solicitation
  2. Awarded

This opportunity has been awarded.

  1. 2×
    Special NoticeFeb 15, 2018

    Industry Day for D/B/B of an Army Reserve Center (ARC) located in Fallbrook, CA

    Notice 9eed204382df6dbce261c7ddd5638503 on SAM.gov

  2. 16×
    Pre-SolicitationApr 26, 2018

    Fallbrook, CA Army Reserve Center (ARC)

    Notice 649688f96e25c1da01f1ac785af0bbdf on SAM.gov

  3. AwardedCurrentSep 25, 2018

    Fallbrook, CA Army Reserve Center

    Notice cb186ac8cc4057eec6aead061399885d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912QR18R0009

Archive Date

Oct 10, 2018

Office Address

LOUISVILLE, KY, 40202-2230