Notice ID: b4eacd4c91924512b5623e4f5f027459Solicitation
Culvert Repair at Caesar Creek Lake - Waynesville, Ohio
Archived on April 24, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−04:00
- Posted
- April 1, 2020
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST LOUISVILLE
- Place of performance
- Waynesville, OH, 45068
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W912QR20Q0034
- Notice ID
- b4eacd4c91924512b5623e4f5f027459
Description
The contractor shall provide all labor, materials, supplies, tools, and equipment necessary to remove trees and vegetation from around 2 drainage ditch culverts that cross under the Tailwater access road and place class C riprap. Contractor will remove sod and remove enough dirt to allow the first layer of the class C rip rap to lay even with the surrounding grounds. Contractor can use dirt that is being removed from areas not washed out and compact it into the washed out areas as needed ensuring it is compacted per standards before placing riprap, no sod or vegetation will be used for fill, any extra dirt needed to fill the washed out areas is the contractors responsibility. Contractor will place class C riprap from the lower edge of the guard rail posts to the bottom of the drainage ditch and go 15 feet wide from the center line of the culverts in each direction for a total of 30 feet wide riprap and extend past the end of the culverts 15 feet. Rip rap will be at least two layers deep. Contractor will be responsible for vegetation clearing on both culverts 40 feet past the ends of the culvert pipes and 30 feet wide except on culvert number 2 upstream side due to property line, contractor will only clear up to the property line approximately 20 feet and ensure that the fence is not disturbed, culvert number 2 downstream will be 40 feet past end of culvert. The bank on the right side will not be cleared off but the drain channel and 15 feet from centerline on the left side will still get cleaned out. Riprap will be placed up to the base of the bank on the right side. Contractor is responsible on culvert 1 downstream to relay the class B and C riprap that is on site in the base of the channel at the end of the culvert after all the vegetation is cleared out and the small island is removed. All vegetation and extra material is the contractors responsibility to remove from the project. All grounds disturbed by contractor shall be finish graded seeded and straw placed.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912QR20Q0034- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×SolicitationCurrentMar 19, 2020
Culvert Repair at Caesar Creek Lake - Waynesville, Ohio
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912QR20Q0034
Archive Date
Apr 24, 2020
Office Address