GovChime
Notice ID: 3be2f7736bae4c69838749ae678f835cSolicitation

Replacement of existing Hydraulic Power Unit (HPU) at Cecil M Harden Lake Rockville IN

Archived on August 20, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−04:00
Posted
July 17, 2020
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST LOUISVILLE
Place of performance
Rockville, IN, 47872
Last updated
Apr 29, 2026

Identifiers

Solicitation number
W912QR20Q0089
Notice ID
3be2f7736bae4c69838749ae678f835c

Description

The Contractor shall provide all tools, materials and labor for the replacement of existing Hydraulic Power Unit (HPU), in accordance with the attached specifications and attached Wage Determination. LOCATION: U.S. Army Corps of Engineers Cecil M. Harden Lake 3391 S. Dam Rd Rockville, IN 47872 Phone: 765-344-1570 Site Point Of Contact: Joe Staigl This procurement is 100% set-aside for Small Business, NAICS 238210, Electrical Contractors and other Wiring Contractors ($16.5M). NOTE: The contract will be based on Lowest Price. Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Quotes are due Wednesday, 5 August 2020 at 10:00 AM ET. Please submit quotes to gary.d.durham@usace.army.mil . Fax submittals will not be accepted. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer System for Award Management, which indicates All payments by the Government under this contract shall be made by electronic funds transfer (EFT). Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912QR20Q0089
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentJul 17, 2020

    Replacement of existing Hydraulic Power Unit (HPU) at Cecil M Harden Lake Rockville IN

    Notice 3be2f7736bae4c69838749ae678f835c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912QR20Q0089

Archive Date

Aug 20, 2020

Office Address

LOUISVILLE, KY, 40202-2230