Notice ID: b2cb2169c9104ea786847f8693e841bcPresolicitation
Air Force Reserve Command Nationwide A/E IDIQ MATOC Pool Unrestricted
Archived on March 10, 2020. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−05:00
- Posted
- June 17, 2021
- Notice type
- Presolicitation
- NAICS
- 541330: Engineering Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST LOUISVILLE
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912QR20R0024
- Notice ID
- b2cb2169c9104ea786847f8693e841bc
Description
*********This Synopsis has been replaced in its entirety 11 Feb 2020*************** 1.) SYNOPSIS: This announcement is open to all businesses regardless of size. The proposed services, which will be obtained by negotiated Firm Fixed Price Contracts, are for a variety of Architect/Engineer services for Air Force Reserve projects nationwide (including Puerto Rico, Guam, and American Samoa). Projects outside the primary mission area may be added at the Government's discretion upon agreement of the A/E firm. Awards will be made as Firm-Fixed Price Task Orders during the period of performance. The total combined contract capacity under the umbrella contract is valued at $45,000,000 over a five year period. This is a five year contract, with no option years. The expected construction cost of projects designed as a part of this contract is between approximately $3,000,000 and $50,000,000. There is no limit on the value of individual task orders. Work will be issued by negotiated firm-fixed-price task orders. Firm (s) that are selected for negotiation of a contract may be required to submit additional information at a later time for use in the evaluation of qualifications for specific Task Orders. The period of performance for task orders issued under these contracts may extend beyond the five year ordering period. Five firms will be selected to be a part of the umbrella contract. If the Contracting Officer determines during the selection process that fewer or more contracts should be awarded, based upon the selection criteria, the Contracting Officer has the discretion of adjusting that number, or awarding none at all. Once selected, the following factors will be used in deciding which selected firm will be utilized for task orders: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Knowledge of the locality of the project; (6) Other appropriate evaluation criteria specific to the task order requirement. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Estimated start date is July 2020. As a contract specifically procured by the Louisville District for the U.S. Air Force Reserve, the selected firms and relevant sub-consultants will be required to attend an annual two-day partnering workshop in Louisville, KY for the life of the contract. This workshop will require the attendance of representatives from the selected firms to define the Government's expectations, create a positive working atmosphere, encourage open communication, and to identify common goals. Cost for these sessions will be borne by the selected firms. In accordance with FAR 36.604 and the supplements thereto, and upon final acceptance or termination, all task orders above $35,000 will receive a performance evaluation. A performance evaluation may be prepared for lesser task orders and interim performance evaluations may be prepared at any time. Performance evaluations will be maintained for use in future source selections for Architect-Engineer Services. 2.) PROJECT INFORMATION: The selected offeror will be solely responsible for the designs that they produce, and will become the designer of record or Design-Build RFP preparer for each individual project on their contract. Projects may consist of planning, design, and related services for military projects for the U.S. Air Force Reserve and other military customers of USACE Louisville District. ****AMDT 0001 Project task orders under this contract may include design of new construction, partial renovation or full renovation of some or all of the following types of building structures: aircraft and vehicle maintenance shops (which include hangars, work bays, administration, special training, storage and support spaces); stand-alone buildings (which include administration facilities, unheated storage, and direct support/general support warehouses); airfield paving; and other facilities unique to the Air Force Reserve and military installations. AMDT 0001**** A/E services may consist of the following activities: preparation of construction solicitations for design-bid-build (complete design) projects and design build RFP’s (request for proposal); concept level designs and engineering feasibility studies; military master planning; site investigation/assessment of existing conditions; value engineering services; engineering services during construction (shop drawing review, site inspection, etc); design of demolition or deconstruction; hazardous materials survey, analysis, and abatement methodology; LEED Certification, sustainable design; construction cost estimates and schedules; technical studies/analysis in support of design for new construction and renovation; comprehensive planning that is related to future construction requirements on military installations; coordination and attainment of local, state and federal permits; support and coordination in the development of utility agreements; and utility investigations Additional A/E support services may include: geotechnical studies; interior design services; environmental compliance; National Environmental Policy Act documentation; controlled waste and flammable storage design; asbestos, lead and PCB surveys and/or abatement. Other A/E services beyond traditional design may include: site selection; American Land Title Association surveys; deed and title services; DD form 1391 development; facility assessments; updating the Air Force Reserve Design Criteria; development of standard designs and value engineering workshops. Project-specific requirements will be described in each individual task order’s Statement of Work. 3.) SELECTION CRITERIA: Selection criteria in descending order of importance are listed below. Paragraph 3(a) through Paragraph 3(d) are primary, and Paragraph 3(e) is secondary. Professional Qualifications: The government’s evaluation of professional qualifications will consider education, training, certifications, registrations, overall experience, relevant experience, and longevity with the firm. Only SF330 Section E, Section F, Section G, and the IDIQ additional consideration information in Section H will be used to evaluate the offerors’ professional qualifications. The government will also consider prior teaming experience between multiple designers included in Section E working on the same project in their proposed role and included in SF330 Section G. In addition to considering the participation of all team members on the projects listed in Section F and G, the government will give additional consideration to projects listed in Sections F and G led by the proposed Project Managers and additional consideration to projects in Sections F and G where the lead designer role was filled by at least one of the two designers included in Section E for the following disciplines: Architecture, Civil, Electrical, Mechanical and Structural. Specialized Experience and Technical Competence: The government’s evaluation of Specialized Experience and Technical Competency will consider example projects in SF330 Section F that demonstrate the Specialized Experience and Technical Competencies below. The government’s evaluation will also consider how the these same Specialized Experience and Technical Competencies are demonstrated in the individual team members’ resumes for both designers and checkers in SF330 Section E, for the disciplines as indicated below in parentheses. Use of Building Information Modeling or Civil Information Modeling (Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use of USACE CADBIM Policies and Procedures (Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use of Design/Build project design methodology from RFP preparation perspective (Project Managers, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use of UFC 1-200-02 and sustainable design (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use of UFC 3-410-01 and HVAC design for military construction projects (Project Manager, Architecture, Mechanical, Electrical and Fire Protection) Use of UFC 3-600-01 and fire protection design for military construction projects (Project Manager, Architecture, Mechanical, Electrical and Fire Protection) Use of UFC 4-010-01 and design of anti-terrorism and force protection measures (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use and understanding of AFRCH 32-1001 Air Force Reserve Command Standard Facility Requirements (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use and understanding of Intelligence Community Directive (ICD) Number 705 and design of secure areas/facilities (Project Manager, Architecture, Mechanical, Electrical and Interior Design) Understanding of the Louisville District Military Design Guide to include the (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Understanding of Air Force Reserve installation-specific requirements such as Installation Design Guides, environmental requirements, and master specifications (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Construction cost estimating using MCASES MII (Cost Engineer) Performance of design Charrette (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Use of Specs Intact (Project Manager, Architecture, Mechanical, Electrical, Structural, Interior Design and Civil) Facilitation of Value Engineering studies in accordance with SAVE (Value Engineering) Experience with Cybersecurity and Risk Management Framework (RMF) Process (RCDD, Electrical) ****AMDT 0001 Use of UFC 3-260-02, Pavement Design for Airfields (Project Manager, Civil, and Geotechnical) Use of UFC 3-260-03, Airfield Pavement Evaluation (Project Manager, Civil, and Geotechnical) AMDT 0001**** The DQMP included in Section H will also be considered when evaluating Specialized Experience and Technical Competency of the offeror. Capacity: The government’s evaluation of the offeror’s capacity narrative and associated tables, figures, etc. included in SF330 Section H will consider the offeror’s ability to complete the work in the required time with the understanding that this contract may require multiple design teams to work multiple task orders at various locations simultaneously. The IDIQ additional consideration information included in Section H will also be considered when evaluating capacity. Past Performance: The government’s evaluation of past performance will consider (1) the performance evaluations provided in Section H for the projects in Section F, (2) any performance evaluations in ACASS/CPARS for the DUNS numbers of any firms or offices listed in the SF330 or for any of the projects included in Section F, and (3) if not already considered, the overall past performance on IDIQ contracts provided in the IDIQ additional consideration information included in Section H. Performance evaluations completed by the Contracting Officer’s Representative (COR) or equivalent role on the contract are preferred. While all performance evaluations may be considered, those for projects listed in Section F and projects with similar scopes of work will receive the most consideration when evaluating past performance Small Business Participation: The government’s evaluation of the offeror’s Small Business Participation plan will consider level of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUB Zone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members. 4.) SUBMISSION REQUIREMENTS: Offerors must submit one (1) hard copy and one (1) electronic copy on CD of the SF 330, Part l, and one copy of the SF330, Part II for the prime firm. Each branch office that will have a key role in the proposed contract must also submit a copy of the SF 330 Part II. Offerors must submit a current and accurate SF 330, Part II, for each proposed sub-consultant. Any firm with an electronic mailbox responding to the solicitation should identify such address in the SF 330, Part I. Please identify the Dun & Bradstreet number of the office(s) performing the work in Block 5 of the SF 330, Part I. Dun & Bradstreet numbers may be obtained by contacting (866) 705-5711, or via the internet at http://fedgov.dnb.com/webform. The proposal shall be submitted as one file using Adobe Acrobat (.pdf). Font size shall be 10 or larger on white letter-sized paper (8 inches by 11 inches). The SF 330 will be no longer than 150 pages in length (excluding the SF 330, Part IIs). Resumes in Section E can be no more than two pages in length, and individual projects in Section F can be no more than 4 pages in length. Section H shall be 20 pages or less in length and may only include information specifically required by this presolicitation to be in Section H. All government evaluation of proposals associated with the selection criteria in Paragraph 3(a) and 3(b) will be performed using Section E, Section F, Section G and Section H as indicated in Paragraph 3. Any additional information included in the proposal not specifically required may not be evaluated or considered. Each printed side of a page will count as one page. The data on the CD shall not substitute for the hard copy submission. Dividers, bindings and cover sheets do not count against the total page count of the response to the RFP Do not furnish design portfolios, prints, magazines, newspaper clippings, or CDs of completed projects. All requirements of this notice must be met for a firm to be considered responsive. Additional instructions and clarifications for SF330: SF330 Section D: The offerors shall submit an organizational chart as required by SF330 Section D. Offerors can submit a folded 11”x 17” organizational chart as part of their submission. This will be considered only one page of their submission. SF330 Section E: The individuals identified by the project roles on the SF330 may not have multiple duties or be “dual-hatted”. Offerors shall provide individual resumes in SF330 Section E for each of the individuals listed below in lines 1 thru 32. ****AMDT 0001 Individuals included in SF330 Section E must possess the certifications and registrations listed below and must have performed in their respective role (i.e. project manager, architect designer, etc.) on projects similar to those listed in Paragraph 2 of this solicitation for the amount of time listed below, at a minimum; this shall be demonstrated in Block 19. Proposals that strongly demonstrate, in lieu of just listing, the specialized experience and technical competence included in Paragraph 3(b) will be evaluated more favorably. For all designer roles, the resume shall clearly indicate features of work of the project for which the individual was the legal designer of record. AMDT 0001**** For all checker roles, the resume shall clearly demonstrate that the individual has performed in the checker (QA/QC) role previously. Project Manager, Registered Architect or Professional Engineer, 10 Years Indicate years of experience leading multidisciplinary teams (Architect, Civil/Site, Mechanical, Electrical, Plumbing, Structural) in vertical construction projects Project Manager, Registered Architect or Professional Engineer, 10 Years Indicate years of experience leading multidisciplinary teams (Architect, Civil/Site, Mechanical, Electrical, Plumbing, Structural) in vertical construction projects Architect Designer, Registered Architect, 10 Years Architect Designer, Registered Architect, 10 Years Architect Checker, Registered Architect, 10 Years Civil Engineer Designer, Registered Professional Engineer, 10 Years Civil Engineer Designer, Registered Professional Engineer, 10 Years Civil Engineer Checker, Registered Professional Engineer, 10 Years Structural Engineer Designer, Registered Professional Engineer, 10 Years Structural Engineer Designer, Registered Professional Engineer, 10 Years Structural Engineer Checker, Registered Professional Engineer, 10 Years Mechanical Engineer Designer, Registered Professional Engineer, 10 Years Mechanical Engineer Designer, Registered Professional Engineer, 10 Years Mechanical Engineer Checker, Registered Professional Engineer, 10 Years Electrical Engineer Designer, Registered Professional Engineer, 10 Years Electrical Engineer Designer, Registered Professional Engineer, 10 Years Electrical Engineer Checker, Registered Professional Engineer, 10 Years Geotechnical Engineering Designer, Registered Professional Engineer, 10 Years Geotechnical Engineering Checker, Registered Professional Engineer, 10 Years ****AMDT 0001 Interior Designer, certified by the National Council of Interior Design Qualifications (NCIDQ), 5 years Interior Design CHECKER, certified by the National Council of Interior Design Qualifications (NCIDQ), 5 years AMDT 0001**** Environmental Engineering Designer, No certification required, 10 years Environmental Engineering Checker, No certification required, 10 years ****AMDT 0001 Communication Distribution Designer, RCDD, 5 years Communication Distribution Checker, No certification required, 5 years AMDT 0001**** Landscape Architect, Registered Landscape Architect, 10 years Cost Engineer, Certified Cost Engineer (CCE), Certified Cost Consultant (CCC), or comparable certification (American Society of Professional Estimators or Association for Advancement of Cost Engineering), 10 Years BIM Manager, No Certification Required, 3 Years Fire Protection Engineering Designer, Registered Fire Protection Engineer, 10 years Fire Protection Engineering Checker, Registered Fire Protection Engineer, 5 years Value Engineer, Certified Value Specialist, 10 Years ****AMDT 0002 Commissioning Agent, 5 years as a NEBB qualified Systems Commissioning Administrator (SCA); or ACG Certified Commissioning Authority (CxA); or ICB/TABB Certified Commissioning Supervisor; or BCA Certified Commissioning Professional (CCP); or AEE Certified Building Commissioning Professional (CBCP); or University of Wisconsin-Madison Qualified Commissioning Process Provider (QCxP) AMDT 0002**** SF330 Section F: Projects included in SF330 Section F will be considered more relevant if construction is substantially complete, and projects that achieved substantial completion more recently will be considered more relevant. Substantially complete is defined as a construction project when the project and/or facility can be used for its intended purpose. ****AMDT 0001 For projects where “substantial completion” is not applicable (e.g., master planning), more recent projects will still be considered more relevant. AMDT 0001**** Of the up to ten projects included in SF330 Section F, a minimum two of the projects must be design/build request for proposal preparation by the offeror and minimum of two must be fully designed by the offeror. Base MATOC or IDIQ contract awards may not be used as projects, only individual task orders that resulted in actual design effort from these base MATOC and IDIQ contracts may be used. For all projects included in Section F, the offeror must indicate what percentage by dollar value of the overall work was self-performed by the team being submitted as a part of this SF330. This percentage shall only include the work that was performed by individuals who were employed by the firms listed in this SF330, even if the work was performed as a part of a joint-venture or a team of A-E contractors. ****AMDT 0002 SF330 Section G: It is acceptable for Section G to be 11”x17”. AMDT 0002**** SF330 Section H: In SF330 Section H, include an evaluation of performance from the client/owner for all example projects included in SF330 Section F. Performance evaluations will not be counted against the 20 page limit of SF330 Section H or the 150 page limit for the entire SF330. In SF330 Section H, each offeror shall produce a detailed Design Quality Management Plan including the following items: An explanation of the firm's management approach Management of sub-consultants (if applicable) Procedures for obtaining local, state and federal regulatory permits in a timely manner Procedures for dealing with design features unique to localities nation-wide (like soil conditions Seismic requirements, climate factors, etc.) Quality control procedures to include the roles and responsibilities of checkers (for plans, specification, design analysis and electronic documents) Risk management and mitigation processes, procedures to insure that internal resources are not over committed A narrative explaining of the chain of command to include individuals that will serve as the single point of contact for the contract and other senior leaders which are responsible to ensure successful execution of task orders An organizational chart showing the inter-relationship of management and various team components (including sub-consultants). Section H shall also include a Capacity Narrative and associated tables, figures, etc. showing the offeror’s ability to complete the work with available resources and available ramp-up capacity with numerous high-quality design teams. In SF330 Section H, the offerors may receive additional consideration for the successful execution of IDIQ contracts. ****AMDT 0001 For each IDIQ included, the offeror shall provide the contract number, the total contract capacity and capacity used, number of task orders executed, performance evaluation ratings for task orders (ratings only, not entire evaluation, summary format acceptable), team members noted in Section E that were legal designers of record or checkers for task orders and team members that were responsible for the overall management of the IDIQ. Do not submit a list of task orders for each IDIQ contract. IDIQ contracts included in Section H will be considered more relevant if the staff who worked on those IDIQ contracts align with the staff proposed in Section E. AMDT 0001**** In SF330 Section H, all large businesses shall present a Small Business and Small Disadvantaged Business Subcontracting Plan in accordance with Public Law 95-507 as part of the response to this RFP. The number of pages of the Small Business Small Disadvantaged Business Plan do not count against the total page count for the response to the RFP. Additionally, estimate the proposed extent of participation of Small Business, Small Disadvantaged Business, Woman-Owned Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Veteran Owned Small Business team members in the contract team using a chart showing each firm that is a team member, their small business category, and their proposed level of participation measured as a percentage of the overall estimated effort (i.e. a chart with 3 columns, respectively entitled 'Firm Name', 'Small Business Category', and '% Participation'). Release of firm status will occur within 10 days after approval of any selection. All responses on SF 330 to this announcement must be received no later than 2:00 p.m. Eastern on 24 February 2020. No other general notification to firms under consideration for this project will be made. Facsimile transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. To be eligible for award, a firm must be registered in the System for Award Management (SAM) database, via the SAM Internet site at https://www.sam.gov. Submit responses to US Army Corps of Engineers, Louisville District, ATTN: Josh Gitchel, 600 Dr. Martin Luther King Jr. Pl., Room 821, Louisville, KY 40202-2267.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912QR20R0024- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 4×Pre-SolicitationCurrentJan 24, 2020
Air Force Reserve Command Nationwide A/E IDIQ MATOC Pool Unrestricted
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
1. CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE) - New England District (CENAE) plans to award up to five (5) separate A-E Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to comprise one (1) Multiple Award Task Order Contract (MATOC) for A-E services to perform General Engineering and Design Services for Larger or More Complex projects. These contracts are being procured in accordance with the Selection of Architects and Engineers as implemented in Federal Acquisition Regulation (FAR) Revolutionary FAR Overhaul Part 36. The total shared capacity of the MATOC is $180,000,000. The North American Industrial Classification System (NAICS) Code is 541330. Work will primarily be performed within the boundaries of the U.S. Army Corps of Engineers (USACE) New England District (ME, MA, NH, CT, VT, RI, and NY), but could also include other states and districts covered by the USACE North Atlantic Divisions (NAD) mission areas (PA, NJ, DE, MD, VA, WV, and the District of Columbia). The contracts will be negotiated and awarded with a five-year ordering period. Award of contracts to the selected firms is anticipated in May 2027. The minimum guarantee amount per firm over the life of each contract is $10,000. Upon identification of a need for A-E services within the scope of these contracts, selection for a specific task order will be in accordance with USACE Alert 21-013, Updated Procedures for the Selection of Task Orders on Architect-Engineer Indefinite Delivery Contracts dated 14 April 2021 (USACE Alert 21-013) and can be found attached (Attachment A). The selected firm will subsequently be issued a request for proposal with the intent of negotiating a fair and reasonable price for a firm-fixed-price task order. Any other-than-small business that is ultimately selected must comply with FAR 52.219-9 Alt II, Small Business Subcontracting Plan (FEB 2026) and submit a Small Business Subcontracting Plan. This is only required of firms selected for negotiations and is to be provided in response to a future Request for Proposal. The Small Business Subcontracting Plan will contain small business goals for all of the Small Business Programs (Small Business, Women-Owned Small Business (WOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Small Disadvantaged Business (SDB) and HUBZone Small Business). The Subcontracting Plan must be reasonable, attainable, and challenging.2. PROJECT INFORMATION: The work includes, but is not limited to, various engineering, design, and/or construction services for larger or more complex projects. Larger or more complex projects include A-E Services related to projects such as: new construction projects valued at greater than $15M; construction projects authorized under Military Construction ? Army (MCA) and Air Force (MCAF) with A-E fees expected to exceed $1M; complex or specialized facilities such as those in support of medical or research facilities; and/or construction of new civil works flood risk reduction facilities. Work to be performed may relate to, but is not limited to, the following: the design of new and renovated structures; military building and site design; design of any other unique structure; sustainable design and commissioning; general site engineering; military master planning; planning and design for civil works infrastructure including projects related to the development of water resources; environmental engineering and compliance; value engineering; project scheduling; modeling of coastal and inland waterways; diagnostics, assessments, site investigation and other data collection tasks for general architectural or engineering use; and/or historical preservation. Architect-Engineering Services that may be required under this contract include the preparation of: design drawings, technical specifications, construction cost estimates, design and construction schedules, design analyses, engineering calculations, design-build requests for proposal, conceptual designs, planning studies, engineering studies and other technical reports, LEED project documentation, commissioning reports, and/or value engineering (VE) studies. Services may also include all architectural and engineering tasks necessary to develop the documents listed above to also include: developing models, economic analyses, topographic surveying, aerial and other types of surveying, development and use of GIS systems, and construction phase services to include shop drawing review, as-built drawing preparation, preparation of O and M manuals, and/or engineering consultation services.Design documents to be prepared by the A-E for Construction procurement may be for either design-bid-build (DBB) or design-build (D-B) procurements. DBB submittals would include plans, specifications, design analysis, construction cost estimates, and construction phasing plans and schedules for a design charrette/concept (15%) design, schematic (35%) design, design development (65%), draft construction document (95%) and final construction document (100%) submittals. D-B submittals would include plans, specifications, basis of design, construction cost estimates, and construction phasing plans and schedules for a design charette/concept (15%) design, schematic (35%) design submittals, and draft final and final D-B Request for Proposal (RFP) submittals. Products shall be produced to Corps of Engineers guidelines and specific formats set forth under the base contract and/or by individual task order. The firm shall be required to: provide design drawings in Microstation or Autodesk CADD software (latest version); use Autodesk Revit Building Information Modeling (BIM) software; use Corps computer-based specification software for the development of Specifications (SPECSINTACT); use the latest version of MII (cost engineering software as provided by the Government and licensed to the firm) for the development of construction cost estimates; use Primavera P6 for developing detailed construction schedules and use MS Project for more basic design and constructions schedules; and utilize ProjNet (DrChecks) (https://wwwprojnet.org) for comment resolution of design review submittals.3. SELECTION CRITERIA: The selection criteria and each sub-criteria are listed below in descending order of importance. Criteria (a) through (f) are primary factors. Criteria (g) (h) and (i) are secondary factors and will only be used as tie-breakers among firms that are essentially technically equal. Note that in the criteria below, reference to firm refers to the prime A-E firm and its proposed team unless otherwise indicated.(a) Specialized Experience and Technical Competence. Firms should demonstrate specialized experience and technical competence in the following: (1) Development of DBB or D-B documents for vertical construction projects for the federal government with estimated construction costs greater than $15M;(2) Development of DBB or D-B documents for military construction (buildings and site work); (3) Development of DBB or D-B documents for new Civil Works flood risk reduction facilities with focus on coastal and riverine structural alternatives (such as those involving pump stations, flood walls, and gate structures);(4) Development of DBB or D-B documents for large, complex, and/or specialized facilities such as those in support of medical or research facilities; (5) Commissioning of Buildings and Systems in accordance with ASHRAE standards;(6) Use/knowledge of MII for development of construction cost estimate and SPECSINTACT for specifications development.Information contained in the SF330 Part I, Section F will be the primary basis for evaluation against this criteria, though Section H will also be used. See Section 4 below for specific instructions on project information to be included in Section F. Projects in which the firms primary work (planning, full design as the A-E for a DBB procurement or the Designer of Record (DOR) on a D-B contract, or development of the RFP for a D-B procurement) was completed within the last 10 years will be given greater consideration and those projects in which the firms primary work has not yet been completed will be given less consideration. Projects shall be listed in order of relevance to the work to be done under this contract as determined by the firm (see Section 3.d below).(b) Professional Qualifications. The evaluation of Professional Qualifications will consider education, training, professional registration, certifications, and relevant experience of personnel to accomplish the work specified above. Any past design and/or planning experience on USACE-managed projects should be identified. Information contained in the SF330 Part I, Section E will be the primary basis for evaluation against this criteria, though Sections D and H will also be used. (1) Resumes are required for the following key personnel. Resumes should clearly indicate which role listed below is being filled by each individual in Block E, Box 13 of the SF330. All proposed personnel are required to have professional registration in any state by time of award unless otherwise noted. See also additional requirements for certain disciplines below. Proposed personnel shall be those individuals expected to be utilized to a significant extent under the contract. If personnel other than those identified in the SF330 are to be used, the personnel replacing them must have equal to or greater than qualifications and will require Contracting Officer approval. - Project Manager* ? Vertical/Military Construction (2 resumes) (registered as an engineer or architect)- Project Manager* ? Civil Works Infrastructure (registered as an engineer) - Architect (2 resumes)- Mechanical (HVAC/Controls) Engineer - Fire Protection Engineer (registered as a Fire Protection Engineer) - Commissioning Specialist ? defined as architect or engineer to serve as individual ensuring compliance with commissioning requirements for design or construction phases (professional registration not required)- Electrical Engineer (Building Systems)- Lead Cybersystems Security Engineer** (professional registration not required)- Communications Systems Designer/Specialist (a Registered Communications Distribution Designer (RCDD))- Structural (Vertical Construction) Engineer- Civil Engineer (registered in at least one of the six New England states or NY)- Geotechnical Engineer (registered in at least one of the six New England states or NY)- Mechanical (Large Pump Systems) Engineer- Mechanical (Hydraulics/Gate structures) Engineer- Electrical (Supply and Distribution) Engineer- Structural (Flood Control Infrastructure) Engineer- Construction Cost Estimator (with MII experience; professional registration not required)- CADD/BIM Manager/Specialist (professional registration not required)* Project managers shall have a minimum of 10 years of experience managing design projects and a minimum of 5 years as a project manager specific to their specialty in vertical/military construction or civil works infrastructure.** The Lead Cybersystems Security Engineer is responsible for the cybersecurity design of Facility Related Control Systems (FRCS). The Lead Cybersystems Security Engineer shall have experience in applying cybersecurity control measures to control system platforms and should have a thorough knowledge of Unified Facility Criteria (UFC) 4-010-06 Cybersecurity for Facility-Related Control Systems or Unified Facility Guide Specification (UFGS) 25 05 11 Cybersecurity for Facility-Related Control Systems.(2) Should any task orders be issued for work in other portions of NADs mission areas (PA, NJ, DE, MD, VA, WV, and the District of Columbia), the firm will need to demonstrate applicable professional registration in those locations within the task order proposal. Should any survey work need to be accomplished under this contract, the firm must demonstrate in the task order proposal that its proposed survey team member is registered in the state where the work is to be performed. The firm should also have on staff (or provide through a consultant) a SAVE International-accredited Certified Value Specialist (CVS) to facilitate VE study workshops for construction projects as directed. (c) Work Management and Teaming. A proposed management plan shall be presented in Part I, Section H of the SF 330 that references the organization chart provided in Part I, Section D of the SF 330. The plan shall briefly address the firms proposed work management approach for executing work to be performed under this contract. The plan shall include team composition, roles and responsibilities of management personnel and each subcontracted firm, and its approach for ensuring the quality of work performed by the firm and its subcontractors. The plan shall include the total number of discipline personnel and specify the number of the personnel that will be available to the Government under the IDIQ. The plan shall include information on quality control procedures, cost and schedule control, coordination of in-house disciplines and consultants, and relevant experience working with each of the subcontractors on similar projects. Sections C, D, G, and H will be used to evaluate this criterion.In reviewing the project management and teaming information, the evaluation board will consider how the firms, including joint ventures (JV) and Offerors utilizing affiliates, subsidiaries, parent, LLC, and LTD member companies, are organized and how they propose to execute assigned task orders in accordance with Section 4 Submission Requirements. (d) Past Performance. The firm shall demonstrate a good record of past performance on contracts with respect to quality of work, management, cost control, compliance with performance schedules, and ability to manage subcontractors. Assessment against this criterion will be determined primarily by evaluating ratings performed in Contractor Performance Assessment Reporting System (CPARS), the Government-wide evaluation reporting tool for all past performance reports on contracts, or via those provided in Past Performance Questionnaires (PPQs). In reviewing past performance information, the evaluation board will consider the relevancy of the past performed work in addition to how well the firm performed. Positive references from customers and other verifiable information as to exemplary performance may also be considered as provided in Part I, Section H of the SF330. With its SF330, the firm must provide the CPARS report or PPQ for each of the first five projects identified in Section F of the SF330, as these projects should be the most relevant project examples provided. NOTE: The most recent CPARS report, including interim CPARS, is to be provided for any federal contract unless a specific explanation is provided as to unavailability of a CPARS rating; do not submit a PPQ when a completed CPARS is available. If the project/s is/are not a federal project or a CPARS report is not available, the firm shall complete Part I of the PPQ, send it to the customers for the project(s) as applicable, request that they complete Part II of the PPQ and return to the firm, and submit it with the SF330 submission. No sealed envelope is required. A blank PPQ can be found attached to this synopsis/solicitation (Attachment B). The firm shall provide the full contract number and task order number (if applicable) for any Federal contract listed in Section F of the SF330. The evaluation board may seek and consider past performance information from other sources but is not required to if none is available from CPARS or if no PPQ is provided. Other sources of information the evaluation board may consider include interviews with organizations and Government personnel familiar with the firms performance. If little to no relevant past performance data (CPARS reports, PPQs, or information in Section H) is available for the five most relevant projects, the firm may be given a neutral evaluation regarding past performance. CPARS reports or PPQs shall be placed at the end of Part I of the SF330 (they will not be counted towards the page count).(e) Capacity. The firm must demonstrate the capacity to execute multiple task orders concurrently while maintaining quality and schedule. Firms will be evaluated as to its ability to execute $4M in task orders per year over the five (5) years of the contract. A firm will be evaluated on the available capacity of key personnel from the prime firm and its team based primarily through a review of each firms Part II submission and any information provided in Section H as to their methods for managing workload. (f) Knowledge of the Locality. The board will evaluate the firms demonstration of its knowledge and experience with state and local codes,local geologic and subsurface features, environmental conditions, climatic conditions, local construction methods, local construction costs, and permit requirements for projects located in the USACE NADs mission areas with a focus on the six (6) New England states. The basis of the evaluation will be the information in Sections E, F, and H of the SF 330. (g) Geographic Proximity. Location of the firms office(s) as well as those of its team in the general geographical area of the six (6) New England states will be considered. The basis of the evaluation will be the information in Sections C and H of the SF 330. (h) Extent of Participation of Small Business (SB) concerns. The firm shall identify its small business team members and indicate its commitment to utilize SBs on its team to include Woman-Owned Small Business (WOSB), HUBZone Small Business, Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB). Extent of use will be measured as a percentage of the total anticipated contract effort, regardless of whether the small business concern is a prime contractor, sub-contractor, or joint venture partner; the greater the participation the greater the consideration.(i) Volume of DoD A-E Contract Awards. Firms shall indicate in Section H of the SF 330 the volume of DoD A-E contracts awarded to the prime (or Joint Venture) in the last 12 months. The information will be verified and updated during the interviews with the most highly qualified firms. The equitable distribution of DoD A-E contracts among firms, including SB and SDB, will be considered. 4. SUBMISSION REQUIREMENTS: Interested firms able to perform this work must submit Parts I and II of the SF 330 for the prime firm (or joint venture). Part II of the SF 330 must also be submitted for each consultant and, if a joint venture, for the joint venture entity, or each firm in the joint venture. Please note that a separate Part II is required for each branch office of the prime firm and any subcontractors that will have a key role in the proposed contract. If a joint venture is being utilized, a copy of the joint venture agreement is to be included in Part II. The joint venture agreement will be consistent with the attached Joint Venture Procedure (Attachment C). This joint venture agreement will not be included within the page limit stated below. If an Offeror is utilizing experience of affiliates, subsidiaries, parent, LLC, LTD member companies (i.e., Offerors name is not exactly as stated on the SF1442), the proposal should clearly demonstrate how that affiliate/subsidiary/parent firm will have meaningful involvement in the performance of this contract. The relevant consideration is whether the resources of the parent or affiliated company - its workforce, management, facilities, or other resources - will be provided or relied upon for contract performance, such that the parent or affiliate will have meaningful involvement in contract performance. The proposal must demonstrate similarity of the parent or affiliates proposed role on this procurement and the parent or affiliates proposed role submitted for experience in order to receive credit for the parent or affiliates experience.Submissions must be made to: U.S. Army Corps of Engineers, New England District, ATTN: Contracts Branch ? Brian Mannion, not later than 2:00 PM Eastern Daylight Time on 5 June 2026. See below for the authorized submission transmission method. Include the firms UEI number on the SF 330, Part 1, Block B. On the SF 330, Part 1, Block C, provide the UEI number for each consultant. On the SF330, Part I, Block F, ten example projects shall be listed in order of relevance to the type of work anticipated to be performed under this contract. A project is defined as work performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quality type contracts, the contract as a whole shall not be submitted as a project. In this event, Offerors shall submit the work performed under a task order as a project, or it will not be reviewed. If the Offeror is a JV, relevant project experience should be submitted for projects completed by the JV entity. Note that multiple projects performed under an IDIQ contract cannot be submitted as a single example project but work that encompasses multiple phases/contracts for a single project can be submitted.In the SF 330, Part I, Block F, Box 24, provide the following information for each project: month/year the firms work started and completed broken out by design phase and construction phase; type of product developed (e.g., full design for DBB procurement; prepared RFP for a D-B procurement; Designer of Record on a D-B procurement; study; or other); total contract value of the A-Es contract on the project including a) a breakout of the value of the work performed by the A-E along with their role on the contract, and b) value of work performed by any team subcontractors on the project and their roles; physical size of the designed facility; and construction cost as applicable. In Block F, Box 23, provide customer point-of-contact who can be reached for references to include email address in Box 23 (c). If a sample project is a federal procurement, include the applicable contract number in Block F, Box 21. In the SF330, Part I, Section H, the A-E firm may also provide supplemental information to address all aspects for which Specialized Experience and Technical Competence is being sought as well as documentation to support past performance selection criteria such as verifiable information demonstrating exemplary past performance. The Offerors response shall be submitted electronically. Files shall not contain classified data. The use of hyperlinks in responses is prohibited.PIEE PROPOSAL SUBMISSION INSTRUCTIONS: ALL SUBMISSIONS TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH THE ARMYS ELECTRONIC FILE SHARING SERVICE, PROCUREMENT INTEGRITY ENGERPRISE ENVIRONMENT (PIEE) (HTTPS://PIEE.EB.MIL/), USING THE SOLICITATION MODULE AND THE OPEN SOLICITATION ASSOCIATED WITH THIS SOLICITATION NUMBER. The Government will not accept: paper copies, CD-ROMs, emails, facsimile submissions, proposals uploaded to any other module in PIEE, or any other method of submission. These proposals will not be retrieved or evaluated.Information regarding how to set up a vendor registration is included in this link- https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtmlInformation regarding role assignment during vendor registration is included in this link- https://sam.gov/opp/2b0a3d5c4c454beb8fefa3d844544a1d/view File Size Limitations: Offerors are advised to follow the PIEE instructions for uploading files. PIEE supports delivery up to 1.9 GB per file, with no limit on the number of files, as well as multiple file formats. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below. File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: ? W912WJ26RA013-FIRMNAME-VOLUME I ? W912WJ26RA013 -FIRMNAME-VOLUME II Each file name shall begin with the solicitation number followed by the firms name and a brief file description. Please see examples above. Upload Completion and Deadline: Interested parties shall submit responses no later than the date and time specified on the solicitation document. The time and date of proposal receipt will be the upload completion/delivery time and date recorded within the PIEE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g., 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes?this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the PIEE upload confirmation for their record. Proposals sent through proprietary or third-party File Transfer sites, email, or DoD SAFE WILL NOT be retrieved and evaluated. It is the responsibility of the Offeror to confirm timely receipt of proposals. All proposals received, as confirmed by the date/time recorded within the PIEE site, after the exact time specified for receipt on the solicitation document shall be treated as late submissions and will not be considered.The SF 330, Part I, shall have a page limit of 65 pages. A page is one side of an 8 x 11 sheet of paper. 11 x 17 (single side) pages may be used to provide graphical information or images that do not fit well on an 8 x 11 sheet but this counts as two pages. Front and back cover, section dividers, and any cover letter, do not count toward the page limit. Font size for data entry cells shall not be less than 10 font and the margins for pages that supplement the SF 330 forms shall not be less than one inch with the exception that inch margins are allowed when using the Standard Form 330 template. Pages in excess of the page limit will not be evaluated. A recent SF330 Part II for each office of participating firm in the proposed team shall be provided with each submission. The selected firm must be registered in the System for Award Management (SAM) prior to award. Information regarding registration can be obtained online at www.sam.gov or by telephone at 1-866-606-8220. For any general or administrative questions, contact the contract specialist, Mr. Brian Mannion, at 978-318-8478 or via email at Brian.T.Mannion@usace.army.mil by 25 May 2026. This is not a request for proposal. Personal visits for the purpose of discussing this announcement prior to the closing date of this announcement will not be entertained or scheduled. However, questions may be directed to the point of contact for this announcement.Enclosures:Attachment A: Updated Procedures for the Selection of Task Orders on Architect-Engineer Indefinite Delivery Contracts dated 14 April 2021 (USACE Alert 21-013)Attachment B: Past Performance Questionnaire (PPQ) FormAttachment C: Joint Venture Procedure | 81% | Combined Synopsis | 06/09/2026 |
SOURCES SOUGHT NOTICE This is a Sources Sought notice is being issued for market research purposes to determine the availability, capability, and interest of firms for a potential Government requirement. ***NO SOLICITATION IS AVAILABLE*** Requests for a solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE The United States Army Corps of Engineers (USACE) Southwestern Division, Middle East District (SWM) anticipates a potential requirement for a seven-year Single Award Task Order Contract (SATOC) to support the pre-design activities and 100% design solution supporting the development of secure facilities that are ICD-705 compliant at Al Udeid Air Base, Qatar. These requirements stem from the Air Force Central Command (AFCENT) and the Al Udeid Air Base 2040 Strategic Master Plan. This project is anticipated to include the following: 1. Produce a Planning Charrette Report II (PCR II), including a DD Form 1391. 2. Geotechnical Survey 3. Plan and design a hardened, underground, secure, Combat Center Building (CATCODE 141446) and squadron operations buildings supporting a variety of airframe and missions to include, but not limited to, bombers, fighters, and unmanned aircraft systems for intelligence, surveillance, and reconnaissance (ISR). 4. Additional facilities may include, but are not limited to various administrative offices, command and control facilities, operational readiness and life support facilities for specialized personnel, elevators, and a parking garage. 5. All ancillary supporting facilities, security measures, utility services, site work, and demolition to result in a complete and usable facility to include any necessary elements not listed herein will also be included. The potential requirement may result in a SATOC solicitation in approximately April 2027. If solicited the Government intends to award the anticipated requirement by approximately January 2028. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 541330 Engineering Services. Companies with the professional qualifications, specialized expertise, technical competence, and workload capacity to complete the work described above are invited to provide capability statements. CAPABILITY STATEMENT Please complete the questionnaire at https://forms.osi.apps.mil/r/p3EM51KZ8R by 8 April 2026 11:59 Eastern Time. Responses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted of the capability statements received. Questions may be sent by e-mail to the Contract Specialist, Tracy Gusukuma at tracy.m.gusukuma@usace.army.mil. Please include, ‘MARKET RESEARCH Combined Air Operations Mission’ in the e-mail subject line. | 78% | Market Research | 04/09/2026 |
The requirement is for Architect/Engineer (A/E) services to support the Military Construction (MILCON), Sustainability, Restoration and Modernization (SRM), Interagency and International Services (IIS), and Civil Works Programs with planning, engineering, construction, and design services. The contracts will be used for projects primarily within the U.S. Army Corps of Engineers Baltimore District (NAB) mission area of responsibility (AoR) in the contiguous United States with incidental usage within North Atlantic Division (NAD) AoR. Twelve (12) contracts were awarded under this MATOC, which includes a Small Business Reserve of six (6) contracts. The total shared capacity is $500,000,000.00 for all MATOC holders. | 77% | Awarded | Open |
The requirement is for Architect/Engineer (A/E) services to support the Military Construction (MILCON), Sustainability, Restoration and Modernization (SRM), Interagency and International Services (IIS), and Civil Works Programs with planning, engineering, construction, and design services. The contracts will be used for projects primarily within the U.S. Army Corps of Engineers Baltimore District (NAB) mission area of responsibility (AoR) in the contiguous United States with incidental usage within North Atlantic Division (NAD) AoR. Twelve (12) contracts were awarded under this MATOC, which includes a Small Business Reserve of six (6) contracts. The total shared capacity is $500,000,000.00 for all MATOC holders. | 77% | Awarded | Open |
The requirement is for Architect/Engineer (A/E) services to support the Military Construction (MILCON), Sustainability, Restoration and Modernization (SRM), Interagency and International Services (IIS), and Civil Works Programs with planning, engineering, construction, and design services. The contracts will be used for projects primarily within the U.S. Army Corps of Engineers Baltimore District (NAB) mission area of responsibility (AoR) in the contiguous United States with incidental usage within North Atlantic Division (NAD) AoR. Twelve (12) contracts were awarded under this MATOC, which includes a Small Business Reserve of six (6) contracts. The total shared capacity is $500,000,000.00 for all MATOC holders. | 77% | Awarded | Open |
Additional Details
Solicitation Number
W912QR20R0024
Archive Date
Mar 10, 2020
Office Address
LOUISVILLE, KY, 40202-2230