Notice ID: 4d29ff2d359b4548b9028b957ca92368Award NoticeAwarded
Wabash River Dikes
Awarded on September 30, 2021. Full description on SAM.gov.
Awarded tounder W912QR21C0045 (source: SAM.gov award notice)• $8.8M
Overview
- Posted
- September 30, 2021
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of War
Notice details
- Last updated
- Dec 4, 2025
- Award date
- Sep 30, 2021
- Award amount (SAM.gov award notice)
- $8.8M
Identifiers
- Solicitation number
- W912QR21B0012
- Notice ID
- 4d29ff2d359b4548b9028b957ca92368
- Award number (PIID)
- W912QR21C0045
Description
Installation of seven stone river dikes in the Ohio River withing river miles 847.5 to 849.0. Four to be installed on the Illinois bank and three installed on the Kentucky bank. Installation of stone bank armoring. Some tree clearing and excavation of the river bottom on the Illinois side will be required. Tree clearing and All work will be performed from the river. Project will require approximately 125,000 tons of stone. ******************************Amendment 0001************************** Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows: a. Photos of the site are hereby incorporated in this solicitation. b. The due date of bids is not extended due to this amendment. c. All amendments must be acknowledged. d. All other terms and conditions remain unchanged. ***************************Amendment 0001************************** ***************************Amendment 0002************************** Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows: a. The following sections have been updated in the Specifications: 1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.7. 2. Revised specification section 31 11 00 Clearing and Grubbing paragraph 3.3. 3. Revised Plan sheet CS101 – added note 7. b. The due date of bids is not extended due to this amendment. c. All amendments must be acknowledged. d. All other terms and conditions remain unchanged. ***************************Amendment 0002************************** **************************Amendment 0003************************** Solicitation W912QR21B0012 to install 7 stone river dikes along the Ohio River is hereby modified as follows: a. The following sections have been updated in the Specifications: 1. Revised specification section 31 00 00.00 06 Earthwork paragraph 3.8.3. 2. Revised specification section 01 50 00 – Par. 1.5. 3. Revised specification section 01 57 19.00 06 – Par. 4.2.4.1 4. Revised Plan sheet CS104 – added note 11. b. The due date of bids is not extended due to this amendment. c. All amendments must be acknowledged. d. All other terms and conditions remain unchanged. **************************Amendment 0003**************************
Award Overview
Award Number
W912QR21C0045
Award Amount (SAM.gov award notice)
$8.8M
Award Date
Sep 30, 2021
Awardee
Awardee UEI
UBFLQ7H2KN58
Original Solicitation
Notice ID: 4d29ff2d359b4548b9028b957ca92368
Posted Date: Sep 30, 2021
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- —Signed Aug 4, 2026
- —Signed May 13, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912QR21B0012- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 4×
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
***Amendment 0001 The purpose of this amendment is to provide Government answers to Bidder Inquiries and a revision to Section 3.3.2 No Work Stages of the specifications. Also, this amendment will remove DFARS Clause 252.215-7009 and add FAR Clause 52.222-34 as a full text. Response deadline of 01 June 2026 at 10am CST will not be extended. All other Terms and Conditions will remain unchanged. The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane. | 90% | Special Notice | 06/01/2026 |
***Amendment 0001 The purpose of this amendment is to provide Government answers to Bidder Inquiries and a revision to Section 3.3.2 No Work Stages of the specifications. Also, this amendment will remove DFARS Clause 252.215-7009 and add FAR Clause 52.222-34 as a full text. Response deadline of 01 June 2026 at 10am CST will not be extended. All other Terms and Conditions will remain unchanged. The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane. | 90% | Solicitation | 06/01/2026 |
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish all plant, labor, material, and equipment and performing all operations in connection with the repair of existing or construction of new stone structures, revetments, notching or removal of existing structures, and appurtenant work in accordance with this section of the specifications and the applicable drawings. The work consists of modifying and constructing river training structures in the Mississippi River near Herculaneum, Missouri and Ste. Genevieve, Missouri. The work is spread across two separate ten-mile reaches of the Mississippi River and includes modifying 44 structures and constructing two new structures entirely from recycled stone from the modified structures. In general, dike modification refers to some form of degradation, removal, and/or relocation of Graded Stone A, which is 5,000-pound top-size. Furnishment of new stone material will not be required for the work. The work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane. | 90% | Pre-Solicitation | 05/18/2026 |
Special Instructions:This Request for Quote (RFQ) is for the contractor to perform the construction of a Floating Courtesy Dock, Walkway and Access at Smith Ridge Boat Ramp, Green River Lake, in accordance with the attached Scope of Work (SOW). The contractor shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to complete the work listed below, at the areas specified at Green River Lake, located in Campbellsville KY 42718. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. The Contractor shall begin work within 10 calendar days of Notice to Proceed (NTP). The Period of Performance for this work is 120 business days after receiving the NTP. One award will be made with this Solicitation. Note: Bid Bonds/ Pay bonds are required. Location: Green River Lake 544 Lake Road Campbellsville, KY 42718This procurement is 100% set-aside for Small Business, NAICS 237990(Size Determination $45M). Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Note: The contract award will be based on Lowest Price to the Government. A site visit is HIGHLY ENCOURAGED for the contractor to assess quantities, critical dimensions, and work conditions. All work will be done according to standard industry practices. Access to the work area is controlled and appointments to look at the site shall be coordinated with the Technical Representative Quotes are due on 21 September 2026 at 10:00 AM Eastern Time. Electronic submittal will be accepted. You must submit your quote through PIEE (directions are attached). Fax, telephones, or mailed submittals will not be accepted. Technical questions pertaining to this project shall be posted to ProjNet per the instructions incorporated into the solicitation. Contractors are NOT to contact the TPOCs listed until an award has been made. All questions must be submitted via ProjNet at least 5 days prior to solicitation due date.**ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer System for Award Management, which indicates All payments by the Government under this contract shall be made by electronic funds transfer (EFT).Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier. The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.SAM.gov). PLEASE NOTE: SAM is completely free of charge for both registrants and users. Note: Page numbering in this document may not be accurate. | 81% | Solicitation | 09/21/2026 |
Sources Sought Notice - Construction - Wood River Relief Wells No. 2 - Please see attached for all pertinent details. | 80% | Market Research | 10/28/2026 |
Additional Details
Solicitation Number
W912QR21B0012
Archive Date
Oct 15, 2021
Office Address
LOUISVILLE, KY, 40202-2230