Notice ID: f1a1135ef8f74fd7a9ca4b0da37513f2Solicitation

Fuel Tank Replacement Caesar Creek Lake, Ohio

Archived on October 12, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−04:00
Posted
September 23, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST LOUISVILLE
Place of performance
Waynesville, OH, 45068
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912QR21Q0095
Notice ID
f1a1135ef8f74fd7a9ca4b0da37513f2

Description

The contractor will furnish all personnel, equipment, supplies, and materials necessary to remove and dispose of four (4) existing stationary fuel holding tanks. At specified locations. The Contractor shall leave any existing plumbing that will be specified within the statement of work. The contractor will provide four (4) pumps with specified sizes, functions, and locations at Caesar Creek Lake. ******************************Amendment 0001************************** ******************************AMENDMENT 0002*********************** Solicitation number W912QR21Q0095 for the Storage Tank Replacement at Caesar Creek Lake in Waynesville, Ohio is hereby amended as follow s: a. Corrected location to Caesar Creek Lake in Block 10 of solicitation. b. All other terms and conditions remain unchanged. c. This amendment is effective the date of the Contracting Officers signature. ******************************Amendment 0001************************** Solicitation number W912QR21Q0095 for the Storage Tank Replacement at Caesar Creek Lake in Waynesville, Ohio is hereby amended as follows: a. Solicitation date has been extended from 24 September 2021 10:00AM Eastern Time to 27 September 2021 10:00AM Eastern Time. b. The following Statement of Work sections have been revised: Section 0001: f) Drawings for existing tank are being provided. g) Any damage to US Army Corps of Engineer property shall be fixed or replaced at no additional cost to the Government. h) All work must be completed with contractors equipment. NOTE: All tanks will be emptied one week prior to removal. Approximate weighs of tanks are as follows. 1000 Gallon 18K LBS 500 Gallon 12K LBS 250 Gallon 7.5K LBS Tank at Tower 600 LBS Pictures of existing tank have been provided with this package Section 0002: f) New tanks may be stored inside of Maintenance compound while the old tanks are removed. g) All transfer pumps shall have a minimum flow of 10 GPM and not to exceed 25 GPM and shall be approved by TPOC. All return pumps must meet industry standards to pump excess fuel at a rate not to overflow the tank. c. Update of Section 34. Index of Exhibits: Exsisting tank specification drawings added to Exhibit E Exhibits Description Exhibit A Site Map attached via PDF Exhibit B Miscellaneous Sample Forms attached via PDF Exhibit C Sample Quality Control Plan Exhibit D Accident Prevention Plan Outline Exhibit E Project Drawings and Photos attached via PDF ******************************AMENDMENT 0002***********************

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912QR21Q0095
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    SolicitationCurrentSep 10, 2021

    Fuel Tank Replacement Caesar Creek Lake, Ohio

    Notice f1a1135ef8f74fd7a9ca4b0da37513f2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The U.S. Army Corps of Engineers (USACE) - Chicago District is issuing this combined synopsis/solicitation as a Request for Quotation (RFQ) under solicitation number W912P626QA030. This acquisition is being conducted using Simplified Acquisition Procedures in accordance with RFO Part 13.*****This project is a Total Small Business Set-Aside under NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction), which carries a small business size standard of $45,000,000.00. *****The Contractor shall furnish all labor, materials, supplies, tools, and equipment necessary to complete the construction project located at J. Edward Roush Lake Dam in Huntington, Indiana (Zip Code: 46750). The required work is structured under two primary Firm-Fixed-Price (FFP) Contract Line Items (CLINs): *****CLIN 0001 (Base) - Replace Diesel Tank Fill Tube: Safe removal of the existing ~20-foot-long fuel fill tube located on a sloped embankment. Installation of a new, sealed connection from the interior 2,000-gallon tank to the road deck fill point, terminating in a lockable filler neck and cap assembly. The new fill tube must be constructed of ASTM A106, Grade B, Schedule 40 seamless carbon steel pipe. Surface preparation and application of a vinyl paint system conforming to USACE Formula V-766e in strict accordance with UFGS Section 09 97 02 (Painting: Hydraulic Structures) is required. *****CLIN 0002 (Base) - Install Emergency Vent on Diesel Tank: Correct calculation of the required venting capacity and installation of an appropriately sized, brand-approved emergency pressure relief vent on the existing 2,000-gallon diesel fuel tank located on the 3rd floor of the tower structure, in strict accordance with National Fire Protection Agency (NFPA) 30, Section 22.7. *****Warranty Requirements: In accordance with SOW Section 4.E and RFO 52.246-21 (Warranty of Construction), the Contractor shall provide a standard 1-year warranty on materials and a general 1-year warranty for installation, running from the date of final Government acceptance. *****STATUTORY SMALL BUSINESS DISCLOSURE: DEFINITIZATION OF EQUITABLE ADJUSTMENTS (RFO 36.101-4 and DFARS CD 2026-O0019)As required by 15 U.S.C. 644(w), when the Contracting Officer anticipates the award of a construction contract to a small business concern, the solicitation notice must include information regarding the agency s definitization of equitable adjustments for change orders: *****USACE Policies and Procedures: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to USACE Partnering Details (https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/) then scrolling down on the right-hand side of the page and clicking on View FFP Contract Changes Playbook Here. *****No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. *****SUBMISSION MODULE and PORTAL REGISTRATION (MANDATORY)To submit a quote, your firm must be registered in the System for Award Management at SAM.gov and within the DoD Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at PIEE Portal. *****Submission Method: Quotes must be submitted electronically via the PIEE Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Any questions regarding the PIEE portal should be directed to the PIEE Helpdesk at the portal link above. *****Site Visit Coordination: A site visit is highly recommended. To coordinate access to the J. Edward Roush Lake Dam, contact Lake Manager Wesley Millar via email at Wesley.s.millar@usace.army.mil or phone at 260-356-8648. *****Inquiries/Questions Due Date: All technical and administrative questions must be submitted via email to James Parizek at James.P.Parizek@usace.army.mil no later than September 3, 2026, at 4:00 PM Central Time. Please include the solicitation number in the subject line.*****Responsibility Statement: All responsible sources may submit a quotation which, if received in a timely manner, shall be considered by the agency.
54%
AwardedOpen
The U.S. Army Corps of Engineers (USACE) - Chicago District is issuing this combined synopsis/solicitation as a Request for Quotation (RFQ) under solicitation number W912P626QA030. This acquisition is being conducted using Simplified Acquisition Procedures in accordance with RFO Part 13.*****This project is a Total Small Business Set-Aside under NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction), which carries a small business size standard of $45,000,000.00. *****The Contractor shall furnish all labor, materials, supplies, tools, and equipment necessary to complete the construction project located at J. Edward Roush Lake Dam in Huntington, Indiana (Zip Code: 46750). The required work is structured under two primary Firm-Fixed-Price (FFP) Contract Line Items (CLINs): *****CLIN 0001 (Base) - Replace Diesel Tank Fill Tube: Safe removal of the existing ~20-foot-long fuel fill tube located on a sloped embankment. Installation of a new, sealed connection from the interior 2,000-gallon tank to the road deck fill point, terminating in a lockable filler neck and cap assembly. The new fill tube must be constructed of ASTM A106, Grade B, Schedule 40 seamless carbon steel pipe. Surface preparation and application of a vinyl paint system conforming to USACE Formula V-766e in strict accordance with UFGS Section 09 97 02 (Painting: Hydraulic Structures) is required. *****CLIN 0002 (Base) - Install Emergency Vent on Diesel Tank: Correct calculation of the required venting capacity and installation of an appropriately sized, brand-approved emergency pressure relief vent on the existing 2,000-gallon diesel fuel tank located on the 3rd floor of the tower structure, in strict accordance with National Fire Protection Agency (NFPA) 30, Section 22.7. *****Warranty Requirements: In accordance with SOW Section 4.E and RFO 52.246-21 (Warranty of Construction), the Contractor shall provide a standard 1-year warranty on materials and a general 1-year warranty for installation, running from the date of final Government acceptance. *****STATUTORY SMALL BUSINESS DISCLOSURE: DEFINITIZATION OF EQUITABLE ADJUSTMENTS (RFO 36.101-4 and DFARS CD 2026-O0019)As required by 15 U.S.C. 644(w), when the Contracting Officer anticipates the award of a construction contract to a small business concern, the solicitation notice must include information regarding the agency s definitization of equitable adjustments for change orders: *****USACE Policies and Procedures: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to USACE Partnering Details (https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/) then scrolling down on the right-hand side of the page and clicking on View FFP Contract Changes Playbook Here. *****No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. *****SUBMISSION MODULE and PORTAL REGISTRATION (MANDATORY)To submit a quote, your firm must be registered in the System for Award Management at SAM.gov and within the DoD Procurement Integrated Enterprise Environment (PIEE) Solicitation Module at PIEE Portal. *****Submission Method: Quotes must be submitted electronically via the PIEE Solicitation Module. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Any questions regarding the PIEE portal should be directed to the PIEE Helpdesk at the portal link above. *****Site Visit Coordination: A site visit is highly recommended. To coordinate access to the J. Edward Roush Lake Dam, contact Lake Manager Wesley Millar via email at Wesley.s.millar@usace.army.mil or phone at 260-356-8648. *****Inquiries/Questions Due Date: All technical and administrative questions must be submitted via email to James Parizek at James.P.Parizek@usace.army.mil no later than September 3, 2026, at 4:00 PM Central Time. Please include the solicitation number in the subject line.*****Responsibility Statement: All responsible sources may submit a quotation which, if received in a timely manner, shall be considered by the agency.
54%
Combined Synopsis09/11/2026
Login at https://piee.eb.mil and search for 'W91QVN26RA089' to obtain more details.*
51%
Solicitation08/20/2026
This is a pre-solicitation notice to all certified, interested 8(a) Small Business Development Program Participants for the proposed Firm-Fixed-Price (FFP) competitive acquisition under solicitation W9128F27RA012 - API 653 Fuel Tank Repairs and Maintenance ? Eielson AFB, Alaska, as outlined herein. The U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Proposal (RFP) on/or about October ? November 2026. The Primary North American Industry Classification System (NAICS) code for the solicitation is 237120 ? Oil and Gas Pipeline and Related Structures Construction, with a size standard of $45.0 Million. This acquisition includes the repair and maintenance of five vertical aboveground fuel storage tanks located at Eielson AFB in Fairbanks, Alaska. The attached DRAFT Scope of Work (SOW) details the scope of the requirement to be executed in accordance with the terms of the proposed contract. Please see the Pre-Solicitation Notice document for more information.
50%
Pre-SolicitationOpen
This is a Sources Sought Notice for informational/market research purposes. This notice is to gather information on the interest, capabilities, and qualifications of businesses in the industry. The intent is to procure construction services to provide repair and maintenance of five vertical aboveground storage tanks at Eielson AFB, AK. Due to the nature and location, the construction season is generally limited to the timeframe of May through September. The work will be phased over two construction seasons.
50%
Market Research07/10/2026

Additional Details

Solicitation Number

W912QR21Q0095

Archive Date

Oct 12, 2021

Office Address

LOUISVILLE, KY, 40202-2230